Schedule of Proposed Actions (SOPA) |
|||||
This report contains the best available information at the time of publication. Questions may be directed to the Project Contact. | |||||
Report Contents (click to jump to a section) : - Projects Occurring Nationwide - R2 - Rocky Mountain Region, Occurring in more than one Forest (excluding Regionwide) - R2 - Rocky Mountain Region, White River National Forest, Forestwide (excluding Projects occurring in more than one Forest) - R2 - Rocky Mountain Region, White River National Forest, Occurring in more than one District (excluding Forestwide) - R2 - Rocky Mountain Region, White River National Forest, East Zone/Dillon Ranger District (excluding Projects occurring in more than one District) - R2 - Rocky Mountain Region, White River National Forest, East Zone/Eagle Ranger District (excluding Projects occurring in more than one District) - R2 - Rocky Mountain Region, White River National Forest, East Zone/Holy Cross Ranger District (excluding Projects occurring in more than one District) - R2 - Rocky Mountain Region, White River National Forest, West Zone/Aspen Ranger District (excluding Projects occurring in more than one District) - R2 - Rocky Mountain Region, White River National Forest, West Zone/Blanco Ranger District (excluding Projects occurring in more than one District) - R2 - Rocky Mountain Region, White River National Forest, West Zone/Rifle Ranger District (excluding Projects occurring in more than one District) - R2 - Rocky Mountain Region, White River National Forest, West Zone/Sopris Ranger District (excluding Projects occurring in more than one District) | |||||
Projects Occurring Nationwide |
|||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
---|---|---|---|---|---|
Locatable Mining Rule - 36 CFR 228, subpart A. EIS |
- Regulations, Directives, Orders | On Hold | N/A | N/A |
Sarah Shoemaker 907-586-7886 sarahshoemaker@fs.fed.us |
Description: The U.S. Department of Agriculture proposes revisions to its regulations at 36 CFR 228, Subpart A governing locatable minerals operations on National Forest System lands.A draft EIS & proposed rule should be available for review/comment in late 2020
Web Link: http://www.fs.usda.gov/project/?project=57214 |
|||||
Location: UNIT - All Districts-level Units. STATE - All States. COUNTY - All Counties. LEGAL - Not Applicable. These regulations apply to all NFS lands open to mineral entry under the US mining laws. More Information is available at: https://www.fs.usda.gov/science-technology/geology/minerals/locatable-minerals/current-revisions. | |||||
Nationwide Aerial Application of Fire Retardant on National Forest System Land. EIS *UPDATED* |
- Regulations, Directives, Orders |
In Progress: DEIS NOA in Federal Register 02/11/2022 Est. FEIS NOA in Federal Register 04/2023 |
Expected:04/2023 |
05/2023 |
Laura Conway 406-802-4317 laura.conway@usda.gov |
Description: Programmatic Supplemental EIS for the Nationwide Aerial Application of Fire Retardant on National Forest System Land.
Web Link: http://www.fs.usda.gov/project/?project=60450 |
|||||
Location: UNIT - All Districts-level Units. STATE - All States. COUNTY - All Counties. LEGAL - Not Applicable. The direction in the SEIS will apply to use of aerially delivered fire retardant on all National Forest System land. . | |||||
Back To Top | |||||
R2 - Rocky Mountain Region, Occurring in more than one Forest (excluding Regionwide) |
|||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
Thompson Divide Withdrawal EA *NEW LISTING* |
- Minerals and Geology |
In Progress: Scoping Start 10/17/2022 |
Expected:10/2024 |
10/2024 |
Elysia Retzlaff 541-777-1355 elysia.retzlaff@usda.gov |
Description: The Forest Service requested 200,518 acres of National Forest System lands be withdrawn from location, entry, and patent under the mining laws; and operation of the mineral leasing, mineral materials, and geothermal leasing laws.
Web Link: http://www.fs.usda.gov/project/?project=63679 |
|||||
Location: UNIT - West Zone/Aspen Ranger District, Paonia Ranger District, West Zone/Sopris Ranger District, Gunnison Ranger District. STATE - Colorado. COUNTY - Garfield, Gunnison, Pitkin. LEGAL - Not Applicable. Thompson Divide. | |||||
Back To Top | |||||
White River National Forest, Forestwide (excluding Projects occurring in more than one Forest) |
R2 - Rocky Mountain Region | ||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
White River National Forest Water and Riparian Resources Forest Plan Amendment CE *UPDATED* |
- Land management planning | Completed | Actual: 01/03/2023 | 03/2023 |
Cary Green 970-390-3234 cary.green@usda.gov |
Description: Forest Plan Amendment to add a forest-wide standard to Chapter 2, Section One Physical, Water and Riparian Resources that supports the Army Corps of Engineers requirement within the Colorado Western Slope In Lieu Fee Final Instrument, Exhibit G
Web Link: http://www.fs.usda.gov/project/?project=62615 |
|||||
Location: UNIT - White River National Forest All Units. STATE - Colorado. COUNTY - Eagle, Garfield, Gunnison, Mesa, Moffat, Pitkin, Rio Blanco, Routt, Summit. LEGAL - Not Applicable. Forest-Wide. | |||||
Back To Top | |||||
White River National Forest, Occurring in more than one District (excluding Forestwide) |
R2 - Rocky Mountain Region | ||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
Berlaimont Estates Road Improvement Project EIS *UPDATED* |
- Special use management - Road management |
Completed | Actual: 03/10/2023 | 06/2023 |
Cary Green 970-328-5861 cary.green@usda.gov |
Description: The Proposed Action would authorize Berlaimont to improve those existing segments of NFSR 774 and 780 as they lead up to the southeastern corner of the Berlaimont property from local public roads in Edwards.
Web Link: http://www.fs.usda.gov/project/?project=50041 |
|||||
Location: UNIT - East Zone/Holy Cross Ranger District, East Zone/Eagle Ranger District. STATE - Colorado. COUNTY - Eagle. LEGAL - The project is within Sections 20, 29, 32, and 33 of Township 4 South, Range 82 West, 6th Principal Meridian, Eagle County, Colorado. Located north of Interstate 70 in the vicinity of Edwards, Colorado. accessed by National Forest System Roads (NFSR) 774 and 780. | |||||
Camp Hale Restoration and Enhancement Project EIS |
- Watershed management | On Hold | N/A | N/A |
Melvin Woody 970-874-6661 melvin.woody@usda.gov |
Description: The purpose of action is to improve aquatic, riparian, and wetland conditions in and along the Eagle River, maintain or improve recreation opportunities and facilities, and conserve historic values in the Camp Hale area.
Web Link: http://www.fs.usda.gov/project/?project=46121 |
|||||
Location: UNIT - East Zone/Holy Cross Ranger District, East Zone/Eagle Ranger District. STATE - Colorado. COUNTY - Eagle. LEGAL - Township 7S, Range 80W, Sect. 3, 4, 9, 10, 14, 15, 16, 22, 23, 24, 25, 26, 27. The project area is located in the Camp Hale area, south of Red Cliff, and north of Tennessee Pass. | |||||
Back To Top | |||||
White River National Forest, East Zone/Dillon Ranger District (excluding Projects occurring in more than one District) |
R2 - Rocky Mountain Region | ||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
Breckenridge Chair 5 Lift Replacement CE *UPDATED* |
- Special use management |
In Progress: Scoping Start 01/04/2023 |
Expected:04/2023 |
06/2023 |
Sarah Strehle 970 827 5154 sarah.strehle@usda.gov |
Description: The project involves the replacement of the Chair 5 lift within the resort's Peak 8 base area. The project would occur partially on National Forest System (NFS) lands within the Breckenridge Ski Resort's existing Special Use Permit Area.
Web Link: http://www.fs.usda.gov/project/?project=63317 |
|||||
Location: UNIT - East Zone/Dillon Ranger District. STATE - Colorado. COUNTY - Summit. LEGAL - Not Applicable. Breckenridge Ski Area. Bottom terminal is in the Peak 8 base area between the Colorado Super Chair and Rips Ride lift. | |||||
Buffalo South Willow Connect Trail Reconstruction Project CE |
- Recreation management |
Developing Proposal Est. Scoping Start 04/2023 |
Expected:06/2023 | 06/2024 |
Tyler Kirkpatrick 970-262-3452 tyler.kirkpatrick@usda.gov |
Description: Proposal to decommission and restore .5 miles of unsustainable trail that provides a poor recreation experience. Existing trail will be replaced with a new 1 mile sustainable trail that provides for public safety and positive recreational experience.
Web Link: http://www.fs.usda.gov/project/?project=62644 |
|||||
Location: UNIT - East Zone/Dillon Ranger District. STATE - Colorado. COUNTY - Summit. LEGAL - Not Applicable. The project area is located a 1/2 mile from the Buffalo Cabin Trailhead. Township 5 South, Range 78 West, Southeast corner of the Southeast corner of Section 9. | |||||
Copper Mountain Resort Timberline Express Chairlift Replacement and Mountain Bike Trail Construction CE *UPDATED* |
- Recreation management - Special use management |
Completed | Actual: 03/27/2023 | 07/2023 |
Sarah Strehle 970 401-0863 sarah.strehle@usda.gov |
Description: Copper Mountain Resort proposes replacing the Timberline Express Chairlift and upgrading associated lift infrastructure. The project also includes constructing a downhill mountain bike park trail system accessed from the Woodward Express lift.
Web Link: http://www.fs.usda.gov/project/?project=62865 |
|||||
Location: UNIT - East Zone/Dillon Ranger District. STATE - Colorado. COUNTY - Summit. LEGAL - Not Applicable. Copper Mountain Resort, Summit County CO, SW intersection of I-70 and Hwy 91. | |||||
Dillon Ranger District Workforce Housing Administrative Site Lease CE *UPDATED* |
- Land ownership management - Special use management |
In Progress: Scoping Start 11/30/2022 |
Expected:05/2023 |
09/2023 |
Anna Bengtson 970-262-3454 anna.p.bengtson@usda.gov |
Description: Proposal to lease the 10.89-acre Dillon Work Center administrative site for the development of up to 177 affordable housing rental units under the authority of the Agriculture Improvement Act of 2018, Sec. 8623 (P.L. 115-334).
Web Link: http://www.fs.usda.gov/project/?project=63214 |
|||||
Location: UNIT - East Zone/Dillon Ranger District. STATE - Colorado. COUNTY - Summit. LEGAL - Not Applicable. The Work Center property is located along County Road 51 in unincorporated Summit County, Colorado next to the Town of Dillon Public Works site and the Tenderfoot Trailhead. | |||||
Frisco Backyard Fuels and Recreation Project EA *NEW LISTING* |
- Recreation management - Fuels management - Watershed management |
Developing Proposal Est. Scoping Start 03/2023 |
Expected:12/2024 | 06/2025 |
Kathleen Gray 970-262-3497 kathleen.gray@usda.gov |
Description: The Forest Service is proposing approximately 1,250 acres of fuels reduction activities and approximately 25 miles of trails decommission, improvement, and construction activities near the Town of Frisco.
Web Link: http://www.fs.usda.gov/project/?project=63395 |
|||||
Location: UNIT - East Zone/Dillon Ranger District. STATE - Colorado. COUNTY - Summit. LEGAL - Not Applicable. The project area is adjacent to the Town of Frisco, comprising parts of Mount Royal, Miners Creek, Rainbow Lake, Ophir Mountain and Gold Hill. | |||||
Green Mountain Reservoir Shoreline Erosion Control CE *NEW LISTING* |
- Special use management | Completed | Actual: 03/06/2023 | 06/2023 |
Cynthia Ebbert 970-262-3458 cynthia.ebbert@usda.gov |
Description: To minimize shoreline erosion, the project would include grading of the slope (2:1), compaction of the soil, placement of geomembrane and rock rip rap at the toe of the slope. Revegetation and reseed the disturbed area.
Web Link: http://www.fs.usda.gov/project/?project=63596 |
|||||
Location: UNIT - East Zone/Dillon Ranger District. STATE - Colorado. COUNTY - Summit. LEGAL - Not Applicable. National Forest land along the shoreline of Green Mountain Reservoir adjacent to private property at 083 Happy Landing Drive, Heeney, CO. | |||||
Lost Dollar Mine Cabin Demolition CE |
- Watershed management - Minerals and Geology |
In Progress: Scoping Start 06/01/2022 |
Expected:04/2023 |
09/2023 |
Cynthia Ebbert 970-262-3458 cynthia.ebbert@usda.gov |
Description: Demolish and partially remove the Last Dollar Mine Cabin and associated trespass items that are encroaching on National Forest System that pose a health and safety risk to recreationists on the forest.
Web Link: http://www.fs.usda.gov/project/?project=62715 |
|||||
Location: UNIT - East Zone/Dillon Ranger District. STATE - Colorado. COUNTY - Summit. LEGAL - Not Applicable. NW Section 26, Township 7 South, Range 78 West, 6th PM, Summit County, CO. | |||||
Shooting Range Prescribed Burn CE *UPDATED* |
- Recreation management - Vegetation management (other than forest products) - Fuels management |
Completed | Actual: 01/03/2023 | 04/2023 |
Eric Hughes 970-328-5891 eric.hughes@usda.gov |
Description: The Forest Service is proposing to use prescribed fire (broadcast burn) on approximately 44 acres near the Summit County Public Shooting Range for the purpose of the reducing fuel quantities to prevent potential future wildfire.
Web Link: http://www.fs.usda.gov/project/?project=61369 |
|||||
Location: UNIT - East Zone/Dillon Ranger District. STATE - Colorado. COUNTY - Summit. LEGAL - Not Applicable. The project is located in Section 15, Township 5 South, Range 77 West; east of the Summit County Public Shooting Range. Access is County Road 66, Keystone CO. | |||||
Spot Cash Cabin Demolition CE |
- Watershed management - Minerals and Geology |
In Progress: Scoping Start 06/01/2022 |
Expected:04/2023 |
09/2023 |
Cynthia Ebbert 970-262-3458 cynthia.ebbert@usda.gov |
Description: Demolish an abandoned dilapidated mining cabin located near or immediately adjacent to heavily used Blue Lakes Road. The cabin poses a health and safety risk to recreationists on the forest.
Web Link: http://www.fs.usda.gov/project/?project=61973 |
|||||
Location: UNIT - East Zone/Dillon Ranger District. STATE - Colorado. COUNTY - Summit. LEGAL - Not Applicable. Spot Cash Cabin: Section 2, T. 8 S., R. 78 W., 6th P.M. Summit County, Colorado. | |||||
Summit Public Radio & TV Powerline Replacement and Realignment CE *UPDATED* |
- Special use management |
In Progress: Scoping Start 07/01/2022 |
Expected:05/2023 |
07/2023 |
Cynthia Ebbert 970-262-3458 cynthia.ebbert@usda.gov |
Description: Installation of buried electric power and fiber optic cable along a new alignment crossing roughly 4,432' of National Forest to replace an existing buried powerline serving Summit Public Radio and TV's broadcast site on Bald Mountain.
Web Link: http://www.fs.usda.gov/project/?project=60490 |
|||||
Location: UNIT - East Zone/Dillon Ranger District. STATE - Colorado. COUNTY - Summit. LEGAL - Not Applicable. West side of Bald Mountain near Breckenridge, Colorado in SE Section 4 and SW Section 3, Township 7 South, Range 77 West, Summit County. | |||||
Swan Mountain Project EA *UPDATED* |
- Vegetation management (other than forest products) - Fuels management - Watershed management |
In Progress: Comment Period Public Notice 03/24/2023 |
Expected:10/2023 |
06/2024 |
Kathleen Gray 970-401-1983 kathleen.gray@usda.gov |
Description: Proposed activities include a mixture of fuels reduction, wildlife habitat improvement, stream improvement, transportation improvement and trail enhancements.
Web Link: http://www.fs.usda.gov/project/?project=60771 |
|||||
Location: UNIT - East Zone/Dillon Ranger District. STATE - Colorado. COUNTY - Summit. LEGAL - Not Applicable. The Swan Mountain Project encompasses approximately 13,500 acres of National Forest System lands in and around Swan Mountain, Soda Creek, and the Swan River. | |||||
Vail Pass Yurt Placement CE *NEW LISTING* |
- Recreation management |
Developing Proposal Est. Scoping Start 03/2023 |
Expected:08/2023 | 09/2023 |
Anne Gaspar 605-639-0299 anne.gaspar@usda.gov |
Description: To provide a winter outpost a far distance from main entry station for the snow rangers in support of the management of the area for; compliance, managing non-motorized and motorized travel and providing information services to users
Web Link: http://www.fs.usda.gov/project/?project=63661 |
|||||
Location: UNIT - East Zone/Dillon Ranger District. STATE - Colorado. COUNTY - Eagle, Summit. LEGAL - Not Applicable. There are 3 proposed sites. (1) Ptarmigan pass-east side of the road and fence (2) Top of #9 hybrid route west of Ptarmigan Mountain, (3) 0.3 miles due N of Ptarmigan Pass, W side of road. | |||||
Back To Top | |||||
White River National Forest, East Zone/Eagle Ranger District (excluding Projects occurring in more than one District) |
R2 - Rocky Mountain Region | ||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
Grizzly Creek Post Fire Recovery CE *NEW LISTING* |
- Watershed management | Completed | Actual: 03/22/2023 | 08/2023 |
Ryan Sparhawk 970-945-3206 Ryan.Sparhawk@usda.gov |
Description: This project is to intended to increase soil moisture holding capacity of soils impacted by moderate to high soil burn severity in the Wagon Gulch, Blue Gulch, Grizzly Creek Watersheds in the Grizzly Creek Fire burn perimeter.
Web Link: http://www.fs.usda.gov/project/?project=63790 |
|||||
Location: UNIT - East Zone/Eagle Ranger District. STATE - Colorado. COUNTY - Garfield. LEGAL - Portions of S14, T5S, R88W; S15, T5S, R88W; S22, T5S, R88W; S23, T5S, R88W. Treatment area is approximately 6 miles northwest of Glenwood Springs, CO and 10 miles west of Dotsero, CO in the headwaters of the the Wagon Gulch, Blue Gulch, Grizzly Creek Watersheds. | |||||
Hanging Lake Trail Redesign CE *UPDATED* |
- Recreation management - Special area management |
In Progress: Scoping Start 01/25/2023 |
Expected:04/2023 |
06/2023 |
Colleen Pennington 970-309-6597 Colleen.Pennington@usda.gov |
Description: The purpose of this project is to rehabilitate, enhance and restore the trail and recreational features of the Hanging Lake Trail Recreation Area. This trail and its infrastructure were adversely impacted by post-fire debris flows in summer 2021.
Web Link: http://www.fs.usda.gov/project/?project=63318 |
|||||
Location: UNIT - East Zone/Eagle Ranger District. STATE - Colorado. COUNTY - Garfield. LEGAL - Not Applicable. Hanging Lake Trail in Glenwood Canyon located east of Glenwood Springs, Colorado. Trail ascends Deadhorse Canyon up to Spouting Rock and Hanging Lake. | |||||
Back To Top | |||||
White River National Forest, East Zone/Holy Cross Ranger District (excluding Projects occurring in more than one District) |
R2 - Rocky Mountain Region | ||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
Booth Creek Fuels Treatment Project EA *UPDATED* |
- Fuels management |
In Progress: Scoping Start 03/04/2022 Est. Comment Period Public Notice 03/2023 |
Expected:08/2023 |
09/2023 |
Leanne Veldhuis 503-622-2030 leanne.veldhuis@usda.gov |
Description: Proposed fuels reduction activities on National Forest System (NFS) lands within a 3,605-acre area near Vail, Colorado. Treatments correspond to areas identified within the Town of Vail Community Wildfire Protection Plan.
Web Link: http://www.fs.usda.gov/project/?project=61657 |
|||||
Location: UNIT - East Zone/Holy Cross Ranger District. STATE - Colorado. COUNTY - Eagle. LEGAL - Not Applicable. North of Town of Vail, East of Red Sandstone Rd and West of Black Gore Creek Bridge on Interstate 70. The project extends roughly 1.5 miles north of the forest boundary. | |||||
Holy Cross Energy (HCE) Avon-to-Gilman Electric (115-kV) Transmission Line EA *UPDATED* |
- Special use management |
In Progress: Comment Period Public Notice 09/03/2021 |
Expected:07/2023 |
07/2023 |
Marcus Dreux 970-468-5400 marcus.dreux@usda.gov |
Description: Holy Cross Electric Association, Inc.,(HCE) proposes to construct a new 115-kV transmission line between the existing Gilman and Avon Substations. The proposed route is 8.9 miles and would cross approximately 3.4 miles of National Forest System Lands
Web Link: http://www.fs.usda.gov/project/?project=57224 |
|||||
Location: UNIT - East Zone/Holy Cross Ranger District. STATE - Colorado. COUNTY - Eagle. LEGAL - Townships 5 South - 81 West and 6 South - 81 West, 6th Principal Meridian, Eagle County, Colorado. The right-of-way would run southeasterly from the substation in the Avon / Eagle-Vail area, through the town of Minturn, and terminate at the substation just above Gilman. | |||||
Back To Top | |||||
White River National Forest, West Zone/Aspen Ranger District (excluding Projects occurring in more than one District) |
R2 - Rocky Mountain Region | ||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
Castle Creek AML Safety Closure and Cabin Demolitions CE *UPDATED* |
- Minerals and Geology |
Developing Proposal Est. Scoping Start 03/2023 |
Expected:05/2023 | 07/2023 |
Olivia Garcia 970-945-3220 olivia.garcia@usda.gov |
Description: This proposed project is to safeguard one (1) mine feature and demolish and remove three (4) unauthorized structures and one (1) former FS Administrative site situated on National Forest System lands managed by the Aspen-Sopris Ranger District. | |||||
Location: UNIT - West Zone/Aspen Ranger District. STATE - Colorado. COUNTY - Pitkin, Summit. LEGAL - Not Applicable. Various cabins and mine features in Pitkin County. | |||||
Back To Top | |||||
White River National Forest, West Zone/Blanco Ranger District (excluding Projects occurring in more than one District) |
R2 - Rocky Mountain Region | ||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
Milk Creek Large Wood and BDA Project CE *NEW LISTING* |
- Wildlife, Fish, Rare plants - Watershed management |
In Progress: Scoping Start 03/15/2023 |
Expected:07/2023 |
08/2023 |
Robert Ramey 540-325-2327 robert.ramey@usda.gov |
Description: Whole, live spruce would be pulled down and yarded into the stream channel. Beaver dam analogs (BDAs) or similar may be constructed to improve stream hydrology and cutthroat habitat. Riparian plantings and rec modifications will complement.
Web Link: http://www.fs.usda.gov/project/?project=63752 |
|||||
Location: UNIT - West Zone/Blanco Ranger District. STATE - Colorado. COUNTY - Rio Blanco. LEGAL - T2N R91W S8. Northeast of Meeker, Colorado, north off of Yellow Jacket Road (FS 250). | |||||
Yellowjacket Project EA *UPDATED* |
- Forest products - Vegetation management (other than forest products) - Fuels management - Road management |
Completed | Actual: 03/30/2023 | 06/2023 |
Christopher McDonald 970-625-6856 christopher.mcdonald@usda.gov |
Description: The Blanco Ranger District is proposing approximately 2,300 acres of vegetation management activities within the Wilson Park, Sawmill Mountain and Ellison Mountain area.
Web Link: http://www.fs.usda.gov/project/?project=57654 |
|||||
Location: UNIT - West Zone/Blanco Ranger District. STATE - Colorado. COUNTY - Rio Blanco. LEGAL - Sec. 1-3, 10-15, 22-27, 34-36, T2N, R92W; Sec. 4-9, 17-20, 26-36, T2N, R91W; Sec. 1-3 and 12, T1N, R92W; Sec. 1-17, 20-24, 26-29, 32-34, T1N, R91W; Sec. 7, 18, 19 T1N, R90W, Rio Blanco Co. Proposed management activities would occur approximately 16 miles east-northeast of Meeker, Colorado within the vicinity of Wilson Park, Sawmill Mountain and Ellison Mountain,. | |||||
Back To Top | |||||
White River National Forest, West Zone/Rifle Ranger District (excluding Projects occurring in more than one District) |
R2 - Rocky Mountain Region | ||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
Butler Creek BDA Project CE *UPDATED* |
- Wildlife, Fish, Rare plants - Watershed management |
In Progress: Scoping Start 04/04/2022 |
Expected:03/2023 |
07/2023 |
Robert Ramey 540-325-2327 robert.ramey@usda.gov |
Description: The project would utilize untreated wood posts and on-site materials to build multiple beaver dam analogs (BDAs). These temporary structures would be constructed by hand and would mimic the influence of beaver dams on the stream and riparian area.
Web Link: http://www.fs.usda.gov/project/?project=61873 |
|||||
Location: UNIT - West Zone/Rifle Ranger District. STATE - Colorado. COUNTY - Garfield. LEGAL - Not Applicable. Butler Creek, Coulter Mesa, roughly 16 miles north of Rifle, Colorado. | |||||
Back To Top | |||||
White River National Forest, West Zone/Sopris Ranger District (excluding Projects occurring in more than one District) |
R2 - Rocky Mountain Region | ||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
El Jebel Administrative Site, Upper Parcel, Conveyance Project EA *UPDATED* |
- Land ownership management |
In Progress: Objection Period Legal Notice 09/16/2022 |
Expected:03/2023 |
06/2023 |
Jennifer Schuller 970-404-3163 Jennifer.Schuller@usda.gov |
Description: Proposal to convey (sale or lease) all or a portion of the Upper Parcel at its El Jebel Administrative Site pursuant to the Facility Realignment and Enhancement Act of 2005 P.L.109-54; 16 U.S.C. 580d note, as amended by P.L.112-74, Title IV, Sec. 421
Web Link: http://www.fs.usda.gov/project/?project=50663 |
|||||
Location: UNIT - West Zone/Sopris Ranger District. STATE - Colorado. COUNTY - Eagle. LEGAL - Sixth Principal Meridian T. 8 S., R. 87 W. N1/2 of Sec. 3, NE1/4 NE1/4 of Sec. 4. The Upper Parcel is approximately 30 acres and consists of three residences, one mobile home pad, horse pastures. | |||||
Redstone to McClure Pass Trail EA *UPDATED* |
- Recreation management - Special use management |
In Progress: Objection Period Legal Notice 01/27/2023 |
Expected:07/2023 |
08/2023 |
Shelly Grail 970-404-3155 shelly.grail@usda.gov |
Description: Pitkin County has proposed to construct and maintain a natural surface, non-motorized, multi-use recreation trail from Redstone south to the summit of McClure Pass. The proposed trail is about 7 miles in length, of which, 5 miles is on NFS lands.
Web Link: http://www.fs.usda.gov/project/?project=56913 |
|||||
Location: UNIT - West Zone/Sopris Ranger District. STATE - Colorado. COUNTY - Pitkin. LEGAL - Not Applicable. Along CDOT Highway 133 right of way between Redstone and McClure or along historic wagon route. | |||||
In accordance with Federal civil rights law and U.S. Department of Agriculture (USDA) civil rights regulations and policies, the USDA, its Agencies, offices, and employees, and institutions participating in or administering USDA programs are prohibited from discriminating based on race, color, national origin, religion, sex, gender identity (including gender expression), sexual orientation, disability, age, marital status, family/parental status, income derived from a public assistance program, political beliefs, or reprisal or retaliation for prior civil rights activity, in any program or activity conducted or funded by USDA (not all bases apply to all programs). Remedies and complaint filing deadlines vary by program or incident.
Persons with disabilities who require alternative means of communication for program information (e.g., Braille, large print, audiotape, American Sign Language, etc.) should contact the responsible Agency or USDA’s TARGET Center at (202) 720-2600 (voice and TTY) or contact USDA through the Federal Relay Service at (800) 877-8339. Additionally, program information may be made available in languages other than English. To file a program discrimination complaint, complete the USDA Program Discrimination Complaint Form, AD-3027, found online at http://www.ascr.usda.gov/complaint_filing_cust.html and at any USDA office or write a letter addressed to USDA and provide in the letter all of the information requested in the form. To request a copy of the complaint form, call (866) 632-9992. Submit your completed form or letter to USDA by: (1) mail: U.S. Department of Agriculture Office of the Assistant Secretary for Civil Rights 1400 Independence Avenue, SW Washington, D.C. 20250-9410; (2) fax: (202) 690-7442; or (3) email: program.intake@usda.gov. USDA is an equal opportunity provider, employer, and lender. |