Schedule of Proposed Actions (SOPA)
01/01/2023 to 03/31/2023
Uinta-Wasatch-Cache National Forest

This report contains the best available information at the time of publication. Questions may be directed to the Project Contact.
Report Contents (click to jump to a section) :
Projects Occurring Nationwide
Projects Occurring in more than one Region (excluding Nationwide)
R4 - Intermountain Region, Occurring in more than one Forest (excluding Regionwide)
R4 - Intermountain Region, Uinta-Wasatch-Cache National Forest,  Logan Ranger District (excluding Projects occurring in more than one District)
R4 - Intermountain Region, Uinta-Wasatch-Cache National Forest,  Ogden Ranger District (excluding Projects occurring in more than one District)
R4 - Intermountain Region, Uinta-Wasatch-Cache National Forest,  Pleasant Grove Ranger District (excluding Projects occurring in more than one District)
R4 - Intermountain Region, Uinta-Wasatch-Cache National Forest,  Salt Lake Ranger District (excluding Projects occurring in more than one District)
R4 - Intermountain Region, Uinta-Wasatch-Cache National Forest,  Spanish Fork Ranger District (excluding Projects occurring in more than one District)

Projects Occurring Nationwide  

 
Project Name Project Purpose Planning Status Decision Expected Implementation Project Contact
Locatable Mining Rule - 36 CFR 228, subpart A.
EIS
- Regulations, Directives, Orders  On Hold  N/A  N/A Sarah Shoemaker
907-586-7886
sarahshoemaker@fs.fed.us 
Description: The U.S. Department of Agriculture proposes revisions to its regulations at 36 CFR 228, Subpart A governing locatable minerals operations on National Forest System lands.A draft EIS & proposed rule should be available for review/comment in late 2020
Web Link:  http://www.fs.usda.gov/project/?project=57214
Location: UNIT - All Districts-level Units. STATE - All States. COUNTY - All Counties. LEGAL - Not Applicable. These regulations apply to all NFS lands open to mineral entry under the US mining laws. More Information is available at: https://www.fs.usda.gov/science-technology/geology/minerals/locatable-minerals/current-revisions.
Nationwide Aerial Application of Fire Retardant on National Forest System Land.
EIS

           *UPDATED*
- Regulations, Directives, Orders  In Progress:
DEIS NOA in Federal Register 02/11/2022
Est. FEIS NOA in Federal Register 01/2023 
Expected:01/2023
 
02/2023 Laura Conway
406-802-4317
laura.conway@usda.gov 
Description: Programmatic Supplemental EIS for the Nationwide Aerial Application of Fire Retardant on National Forest System Land.
Web Link:  http://www.fs.usda.gov/project/?project=60450
Location: UNIT - All Districts-level Units. STATE - All States. COUNTY - All Counties. LEGAL - Not Applicable. The direction in the SEIS will apply to use of aerially delivered fire retardant on all National Forest System land. .
Back To Top

Projects Occurring in more than one Region (excluding Nationwide)  

 
Project Name Project Purpose Planning Status Decision Expected Implementation Project Contact
Amendments to Land Management Plans Regarding Sage-grouse Conservation
EIS
- Land management planning
- Wildlife, Fish, Rare plants 
In Progress:
Objection Period Legal Notice 08/02/2019 
Expected:12/2020
 
01/2021 John Shivik
801-625-5667
johnashivik@fs.fed.us 
Description: The Forest Service is considering amending its land management plans to address new and evolving issues arising since implementing sage-grouse plans in 2015. This project is in cooperation with the USDI Bureau of Land Management.
Web Link:  https://www.fs.usda.gov/detail/r4/home/?cid=stelprd3843381
Location: UNIT - Ashley National Forest All Units, Boise National Forest All Units, Bridger-Teton National Forest All Units, Medicine Bow-Routt National Forest All Units, Dixie National Forest All Units, Fishlake National Forest All Units, Salmon-Challis National Forest All Units, Sawtooth National Forest All Units, Humboldt-Toiyabe National Forest All Units, Manti-La Sal National Forest All Units, Caribou-Targhee National Forest All Units, Uinta-Wasatch-Cache All Units. STATE - Colorado, Idaho, Nevada, Utah, Wyoming. COUNTY - Jackson, Moffat, Routt, Adams, Blaine, Bonneville, Camas, Caribou, Cassia, Elmore, Fremont, Madison, Churchill, Clark, Elko, Eureka, Humboldt, Lincoln, Nye, Pershing, Washoe, White Pine, Beaver, Box Elder, Cache, Carbon, Daggett, Davis, Duchesne, Emery, Garfield, Grand, Iron, Juab, Kane, Millard, Morgan, Piute, Rich, Salt Lake, San Juan, Sanpete, Sevier, Summit, Tooele, Uintah, Utah, Wasatch, Washington, Wayne, Weber, Platte, Sublette, Teton, Weston, Albany, Campbell, Carbon, Converse, Crook, Laramie, Lincoln, Natrona, Niobrara. LEGAL - Not Applicable. Sagebrush lands in National Forests of Nevada, Utah, southern Idaho, southwest Montana, southwest & south-central Wyoming and northern Colorado.
Back To Top

R4 - Intermountain Region, Occurring in more than one Forest (excluding Regionwide)

 
Project Name Project Purpose Planning Status Decision Expected Implementation Project Contact
High Uintas Wilderness Domestic Sheep Analysis Project (Ashley and UWC National Forests)
EIS
- Grazing management  In Progress:
DEIS NOA in Federal Register 06/21/2019
Est. FEIS NOA in Federal Register 09/2022 
Expected:03/2023
 
03/2023 Paul Cowley
801-999-2177
pcowley@fs.fed.us 
Description: This project will evaluate the effects of continued domestic sheep grazing in the High Uintas Wilderness (HUW). There are 10 sheep allotments located on the north and south slopes of HUW and are located in both the Ashley and Uinta-Wasatch-Cache NFs.
Web Link:  http://www.fs.usda.gov/project/?project=44503
Location: UNIT - Roosevelt Ranger District, Duchesne Ranger District, Evanston-Mountain View RD. STATE - Utah. COUNTY - Duchesne, Summit. LEGAL - Not Applicable. The project is located in the High Uintas Wilderness in both Duchesne and Summit counties. The project is located northeast of Duchesne, UT and southwest of Manila, UT.
Soapstone Calcite Project
EA

           *UPDATED*
- Minerals and Geology  Developing Proposal
Est. Scoping Start 02/2023 
Expected:06/2023  06/2023 David Herron
435-781-5218
david.herron@usda.gov 
Description: Proposal to construct approximately 1 mile of new access road, across the Ashley NF and UWC NF, and then begin small-scale hardrock mining operations for decorative calcite on the Ashley NF, near the headwaters of Iron Mine Creek.
Web Link:  http://www.fs.usda.gov/project/?project=61969
Location: UNIT - Duchesne Ranger District, Heber-Kamas Ranger District. STATE - Utah. COUNTY - Duchesne. LEGAL - T2N R9W Sec 19 of Uintah Meridian, and T3N R9E Sec 18 of Salt Lake Meridian. Headwaters of Iron Mine Creek, on the north side of the creek.
Back To Top

Uinta-Wasatch-Cache National Forest,   Logan Ranger District (excluding Projects occurring in more than one District)

R4 - Intermountain Region  
Project Name Project Purpose Planning Status Decision Expected Implementation Project Contact
Temple Fork Conifer Removal
CE

           *NEW LISTING*
- Vegetation management (other than forest products)  In Progress:
Scoping Start 10/11/2022 
Expected:10/2022
 
10/2022 Paul Chase
801-625-5112
paul.chase@usda.gov 
Description: Remove encroaching conifer in aspen stands and riparian area of Spawn Creek. Subalpine fir/Douglas fir < 20" diameter at breast height (dbh) would be lopped and scattered, 21-35" dbh would be girdled and left standing, > 36" would be left in place.
Web Link:  http://www.fs.usda.gov/project/?project=63009
Location: UNIT - Logan Ranger District. STATE - Utah. COUNTY - Cache. LEGAL - Not Applicable. Approximately 16 miles up Logan Canyon in the Temple Fork Drainage.
Back To Top

Uinta-Wasatch-Cache National Forest,   Ogden Ranger District (excluding Projects occurring in more than one District)

R4 - Intermountain Region  
Project Name Project Purpose Planning Status Decision Expected Implementation Project Contact
Bullwinkle to Boardwalk Snowmaking Project, Snowbasin
CE
- Special use management  In Progress:
Scoping Start 08/23/2022 
Expected:09/2022
 
06/2023 Christopher Sailor
530-350-0387
christopher.sailor@usda.gov 
Description: Snowbasin Resort has proposed to install snowmaking equipment along the Boardwalk route between Bullwinkle run and the top of wildcat. The site will be accessed by existing roads and all materials will be transported via that road system.
Web Link:  http://www.fs.usda.gov/project/?project=62747
Location: UNIT - Ogden Ranger District. STATE - Utah. COUNTY - Weber. LEGAL - Not Applicable. Snowbasin Ski Resort.
Unnamed Channel Realignment in Bear Hollow, Snowbasin Ski Resort
CE

           *NEW LISTING*
- Special use management  In Progress:
Scoping Start 10/06/2022 
Expected:11/2022
 
07/2023 Christopher Sailor
530-350-0387
christopher.sailor@usda.gov 
Description: Most of the channel realignment project is on private land, but the upper approximate 100 feet lies on the USFS. Realignment of this upper section is necessary to achieve the alignment that will make the rest of the channel system properly function.
Web Link:  http://www.fs.usda.gov/project/?project=63004
Location: UNIT - Ogden Ranger District. STATE - Utah. COUNTY - Weber. LEGAL - Not Applicable. Snowbasin Resort Base Area.
Back To Top

Uinta-Wasatch-Cache National Forest,   Pleasant Grove Ranger District (excluding Projects occurring in more than one District)

R4 - Intermountain Region  
Project Name Project Purpose Planning Status Decision Expected Implementation Project Contact
G Monument Rebuild
CE

           *UPDATED*
- Special use management  Completed  Actual: 09/30/2022  10/2022 Larry Framme
801-999-2155
larry.framme@usda.gov 
Description: Pleasant Grove City proposes to rebuild their G monument, which is in disrepair and is contributing to an impaired viewshed, soil erosion and unauthorized social trails. It's on the hillside east of town between Battle Creek and Grove Creek trails.
Web Link:  http://www.fs.usda.gov/project/?project=62952
Location: UNIT - Pleasant Grove Ranger District. STATE - Utah. COUNTY - Utah. LEGAL - Not Applicable. Approximately 3/4 of a mile NE of the Battle Creek Trailhead on the Wasatch Front adjacent to Pleasant Grove.
Back To Top

Uinta-Wasatch-Cache National Forest,   Salt Lake Ranger District (excluding Projects occurring in more than one District)

R4 - Intermountain Region  
Project Name Project Purpose Planning Status Decision Expected Implementation Project Contact
Albion Day Lodge Expansion, Alta Ski Resort
CE
- Special use management  In Progress:
Scoping Start 08/11/2022 
Expected:09/2022
 
06/2023 Christopher Sailor
530-350-0387
christopher.sailor@usda.gov 
Description: Alta has proposed to expand the Albion Day Lodge to the east of the existing building. Up to a three-story building is being contemplated. Alta and its architect will work with the USFS and Town of Alta in the design of the building.
Web Link:  http://www.fs.usda.gov/project/?project=62672
Location: UNIT - Salt Lake Ranger District. STATE - Utah. COUNTY - Salt Lake. LEGAL - Not Applicable. Alta Ski Resort Base Area.
Alta Supreme Service Road Modification
CE
- Special use management  In Progress:
Scoping Start 07/08/2022 
Expected:07/2022
 
07/2022 Arben Kraja
(801) 733 - 2664
arben.kraja@usda.gov 
Description: Alta proposes adjusting an existing service road to create a more functional route that bypasses the concentration of cabins in the Albion Alps subdivision. The route adjustment would be made on NFS land and Alta's private property.
Web Link:  http://www.fs.usda.gov/project/?project=62492
Location: UNIT - Salt Lake Ranger District. STATE - Utah. COUNTY - Salt Lake. LEGAL - Not Applicable. Alta Ski Area - south of Albion Basin Campground.
BST Alignment Change - Dogwood Picnic Area
CE

           *NEW LISTING*
- Recreation management  Completed  Actual: 12/01/2022  12/2022 Zinnia Wilson
801-733-2662
zinnia.wilson@usda.gov 
Description: Project would extend Bonneville Shoreline Trail roughly one quarter of a mile east into Big Cottonwood Canyon, to use Dogwood Picnic Area as a trailhead. The Decision Notice from 2010 identified Oakridge as the trailhead.
Web Link:  http://www.fs.usda.gov/project/?project=63240
Location: UNIT - Salt Lake Ranger District. STATE - Utah. COUNTY - Salt Lake. LEGAL - Not Applicable. Hillside above Dogwood Picnic Area, 1.2 Miles up from the mouth of Big Cottonwood Canyon, just outside Salt Lake City.
Ballroom Entry, Alta Ski Resort
CE
- Special use management  In Progress:
Scoping Start 08/11/2022 
Expected:09/2022
 
06/2023 Christopher Sailor
530-350-0387
christopher.sailor@usda.gov 
Description: Modify the old Ballroom access road to a constant design grade of 7.7% to eliminate the need for skiers to check their speed and better manage snow cover on the traverse. Modification would be completed by cut and fill.
Web Link:  http://www.fs.usda.gov/project/?project=62673
Location: UNIT - Salt Lake Ranger District. STATE - Utah. COUNTY - Salt Lake. LEGAL - Not Applicable. Alta Ski Resort.
Bear Trap Fork Water Line Replacement
CE

           *NEW LISTING*
- Special use management  In Progress:
Scoping Start 10/06/2022 
Expected:10/2022
 
10/2022 Charles Rosier
801-999-2159
charles.rosier@usda.gov 
Description: Replacement of an existing water transmission line serving private property in Bear Trap Fork of Big Cottonwood Canyon.
Web Link:  http://www.fs.usda.gov/project/?project=63002
Location: UNIT - Salt Lake Ranger District. STATE - Utah. COUNTY - Salt Lake. LEGAL - Not Applicable. Approximately ? mile up Bear Trap Fork Trail in Big Cottonwood Canyon.
CAPO Water Tank
CE

           *UPDATED*
- Special use management  Completed  Actual: 12/16/2022  01/2023 Larry Framme
801-999-2155
larry.framme@usda.gov 
Description: A 20k gallon fiberglass water tank will be installed adjacent to the existing water tank and proximal to Donut Falls trailhead. Tank installation will involve excavation of site by trackhoe and delivery of the tank to the site by semi-truck.
Web Link:  http://www.fs.usda.gov/project/?project=62973
Location: UNIT - Salt Lake Ranger District. STATE - Utah. COUNTY - Salt Lake. LEGAL - Not Applicable. Big Cottonwood Canyon, adjacent to Donut Falls Trailhead.
Cirque Traverse Skiway Project, Snowbird
CE
- Special use management  In Progress:
Scoping Start 09/20/2022 
Expected:09/2022
 
10/2022 Christopher Sailor
530-350-0387
christopher.sailor@usda.gov 
Description: Snowbird proposes to construct the Cirque Traverse Skiway which would extend off the existing mountain road that leads to the Cirque Traverse trail.
Web Link:  http://www.fs.usda.gov/project/?project=62911
Location: UNIT - Salt Lake Ranger District. STATE - Utah. COUNTY - Utah. LEGAL - Not Applicable. Snowbird Ski Resort.
Eagle Express Lift Replacement, Solitude Ski Resort
CE
- Special use management  In Progress:
Scoping Start 08/11/2022 
Expected:09/2022
 
06/2023 Christopher Sailor
530-350-0387
christopher.sailor@usda.gov 
Description: Solitude Ski Resort has proposed to remove the old Eagle Express chairlift and replace it with a new detachable quad lift. The new lift would be located in a similar alignment.
Web Link:  http://www.fs.usda.gov/project/?project=62693
Location: UNIT - Salt Lake Ranger District. STATE - Utah. COUNTY - Salt Lake. LEGAL - Not Applicable. Solitude Ski Resort.
Firs #1 Recreation Residence Rebuild
CE
- Special use management  In Progress:
Scoping Start 09/20/2022 
Expected:09/2022
 
10/2022 Christopher Sailor
530-350-0387
christopher.sailor@usda.gov 
Description: The decommissioning and rebuilding of a storm damaged recreation residence in the Firs Tract.
Web Link:  http://www.fs.usda.gov/project/?project=62910
Location: UNIT - Salt Lake Ranger District. STATE - Utah. COUNTY - Salt Lake. LEGAL - Not Applicable. Firs Tract.
Great Western Trail Reroute
CE

           *NEW LISTING*
- Recreation management  Completed  Actual: 12/07/2022  12/2022 Garret Nuzzo-Jones
540-204-7951
garret.nuzzo-jones@usda.gov 
Description: Reroute approximately 0.30 miles of the Great Western Trail in Mill Creek Canyon to move it away from the riparian area and lower the overall trail grade.
Web Link:  http://www.fs.usda.gov/project/?project=63256
Location: UNIT - Salt Lake Ranger District. STATE - Utah. COUNTY - Salt Lake. LEGAL - Not Applicable. The proposed reroutes of the Great Western Trail are located in upper Mill Creek Canyon, east of Upper Big Water Trailhead, just over 3 miles from the road.
High Mambo Terrain Modification, Alta Ski Resort
CE
- Special use management  In Progress:
Scoping Start 08/11/2022 
Expected:09/2022
 
06/2023 Christopher Sailor
530-350-0387
christopher.sailor@usda.gov 
Description: Modify the High Mambo ski run to reduce the pitch and blind spots which have resulted in serious injury to skiers. The project would include filling a depression at the bottom of the run and removing a hump in the middle of the run.
Web Link:  http://www.fs.usda.gov/project/?project=62675
Location: UNIT - Salt Lake Ranger District. STATE - Utah. COUNTY - Salt Lake. LEGAL - Not Applicable. Alta Ski Resort.
Little Cottonwood Canyon Environmental Impact Statement
EIS
- Road management  In Progress:
DEIS NOA in Federal Register 06/25/2021
Est. FEIS NOA in Federal Register 12/2021 
Expected:03/2022
 
06/2022 Lance Kovel
801-999-2131
lance.kovel@usda.gov 
Description: Proposal from Utah Department of Transportation to analyze transportation improvements in and near Little Cottonwood Canyon in Salt Lake City, Utah. The USDAFS is a cooperating agency. For information visit: https://littlecottonwoodeis.udot.utah.gov/
Web Link:  http://www.fs.usda.gov/project/?project=59964
Location: UNIT - Salt Lake Ranger District. STATE - Utah. COUNTY - Salt Lake. LEGAL - Not Applicable. Little Cottonwood Canyon, Salt Lake City, Utah.
Lower Mountain Biking Trail, Brighton Ski Resort
CE
- Special use management  In Progress:
Scoping Start 08/11/2022 
Expected:09/2022
 
06/2023 Christopher Sailor
530-350-0387
christopher.sailor@usda.gov 
Description: The Brighton has proposed a mountain biking trail that would be 2.7 miles long, with an average tread width of 5 feet, starting at the top of Majestic lift and ending at the bottom of the Great Western lift.
Web Link:  http://www.fs.usda.gov/project/?project=62688
Location: UNIT - Salt Lake Ranger District. STATE - Utah. COUNTY - Salt Lake. LEGAL - Not Applicable. Brighton Ski Resort.
Mineral Basin Snowmaking, Snowbird Ski Resort
CE
- Special use management  In Progress:
Scoping Start 08/11/2022 
Expected:09/2022
 
06/2023 Christopher Sailor
530-350-0387
christopher.sailor@usda.gov 
Description: Snowbird proposes to install 1.4 miles of snowmaking pipe in Mineral Basin on existing, previously disturbed Lupine Loop and Bird%u2019s Nest ski trails. The snowmaking pipe installation would result in approximately 7 acres of disturbance.
Web Link:  http://www.fs.usda.gov/project/?project=62689
Location: UNIT - Salt Lake Ranger District. STATE - Utah. COUNTY - Salt Lake. LEGAL - Not Applicable. Snowbird Ski Resort.
Moonbeam Activity Area, Solitude Ski Resort
CE
- Special use management  In Progress:
Scoping Start 08/11/2022 
Expected:09/2022
 
06/2023 Christopher Sailor
530-350-0387
christopher.sailor@usda.gov 
Description: Solitude proposes to construct an aerial adventure course and a tubing hill uphill from the Moonbeam Base Area, between Last Run and Hal's Hollow ski trails.
Web Link:  http://www.fs.usda.gov/project/?project=62694
Location: UNIT - Salt Lake Ranger District. STATE - Utah. COUNTY - Salt Lake. LEGAL - Not Applicable. Solitude Ski Resort.
Mountain Bike Trails, Brighton Ski Resort
CE
- Special use management  In Progress:
Scoping Start 08/11/2022 
Expected:09/2022
 
06/2023 Christopher Sailor
530-350-0387
christopher.sailor@usda.gov 
Description: The trail would be 2.7 miles long, with an average tread width of 5 feet, Brighton has proposed a mountain biking trail starting at the top of Majestic lift and ending at the bottom of the Great Western lift.
Web Link:  http://www.fs.usda.gov/project/?project=62687
Location: UNIT - Salt Lake Ranger District. STATE - Utah. COUNTY - Salt Lake. LEGAL - Not Applicable. Brighton Ski Resort.
Quincy Snowmaking Water Tank, Alta Ski Resort
CE
- Special use management  In Progress:
Scoping Start 08/11/2022 
Expected:09/2022
 
06/2023 Christopher Sailor
530-350-0387
christopher.sailor@usda.gov 
Description: Alta has proposed to construct a buried 1-to-2-million-gallon tank to store water for snowmaking. This tank would be located adjacent to the existing 100,000-gallon Quincy Mine tank and tied into the existing snowmaking system.
Web Link:  http://www.fs.usda.gov/project/?project=62679
Location: UNIT - Salt Lake Ranger District. STATE - Utah. COUNTY - Salt Lake. LEGAL - Not Applicable. Alta Ski Resort.
Race Course Entry, Alta ski Resort
CE
- Special use management  In Progress:
Scoping Start 08/11/2022 
Expected:09/2022
 
06/2023 Christopher Sailor
530-350-0387
christopher.sailor@usda.gov 
Description: The old Snow Cup service road would be widened using cut and fill to allow snowcats to access and groom the Race Course run terrain with less required snow on the ground.
Web Link:  http://www.fs.usda.gov/project/?project=62677
Location: UNIT - Salt Lake Ranger District. STATE - Utah. COUNTY - Salt Lake. LEGAL - Not Applicable. ALta Ski Resort.
Rock n Roll Outrun Terrain Modifications
CE
- Special use management  In Progress:
Scoping Start 07/08/2022 
Expected:07/2022
 
07/2022 Arben Kraja
(801) 733 - 2664
arben.kraja@usda.gov 
Description: Alta Ski Area proposes to re-route the lower part of the Rock n Roll ski run to bypass campsite #9 in the Albion Basin Campground.
Web Link:  http://www.fs.usda.gov/project/?project=62490
Location: UNIT - Salt Lake Ranger District. STATE - Utah. COUNTY - Salt Lake. LEGAL - Not Applicable. Albion Basin Campground at Alta Resort.
Ski Utah Permit Area Expansion
CE

           *NEW LISTING*
- Special use management  In Progress:
Scoping Start 12/09/2022 
Expected:12/2022
 
12/2022 Mary Armbruster
970 870 2211
mary.armbruster@usda.gov 
Description: Ski Utah has proposed to increase the area where they can guide skiers. The addition will assist with the logistics of their "interconnect" and allow for operation when the Highway 2 Heaven is closed.
Web Link:  http://www.fs.usda.gov/project/?project=63296
Location: UNIT - Salt Lake Ranger District. STATE - Utah. COUNTY - Salt Lake. LEGAL - Not Applicable. Outside of the Brighton Ski Resort boundary, below Mt. Wolverine.
Solitude Moonbeam Beginner Area
CE
- Recreation management
- Special use management 
In Progress:
Scoping Start 07/06/2021 
Expected:08/2021
Actual: 08/04/2021 
09/2021 Arben Kraja
(801) 733 - 2664
arben.kraja@usda.gov 
Description: Solitude will realign the existing conveyor, maintenance road, and containing rock wall, as well as regrade the project area. The project will increase on-snow skier circulation and availability of terrain.
Web Link:  http://www.fs.usda.gov/project/?project=60555
Location: UNIT - Salt Lake Ranger District. STATE - Utah. COUNTY - Salt Lake. LEGAL - Not Applicable. Moonbeam base area at Solitude Mountain Resort. Located up Big Cottonwood Canyon in Salt Lake County, Utah.
Solitude Mountain Biking Trails, Solitude Ski Resort
CE
- Special use management  In Progress:
Scoping Start 08/11/2022 
Expected:09/2022
 
06/2023 Christopher Sailor
530-350-0387
christopher.sailor@usda.gov 
Description: Solitude proposes to construct approximately 11 miles of mountain biking and hiking trails located on NFS lands and adjacent private lands between the Roundhouse Restaurant and the Moonbeam Base Area.
Web Link:  http://www.fs.usda.gov/project/?project=62695
Location: UNIT - Salt Lake Ranger District. STATE - Utah. COUNTY - Salt Lake. LEGAL - Not Applicable. Solitude Ski Resort.
Solitude Snowmaking Project, Solitude Ski Resort
CE
- Special use management  In Progress:
Scoping Start 08/11/2022 
Expected:09/2022
 
06/2023 Christopher Sailor
530-350-0387
christopher.sailor@usda.gov 
Description: Solitude proposes to improve its existing snowmaking infrastructure system through the expansion and improvement of Stilling Pond, the construction of two new snowmaking valve houses, the implementation of new snowmaking pipelines and coverage.
Web Link:  http://www.fs.usda.gov/project/?project=62696
Location: UNIT - Salt Lake Ranger District. STATE - Utah. COUNTY - Salt Lake. LEGAL - Not Applicable. Solitude Ski Resort.
Stansbury Wildlife Guzzler Additions
CE

           *NEW LISTING*
- Wildlife, Fish, Rare plants  Completed  Actual: 12/20/2022  12/2022 Drew Eline
801-794-6771
Drew.Eline@usda.gov 
Description: UDWR and FS propose to install two wildlife guzzlers in the northern Stansburys adjacent to existing guzzlers. Existing guzzlers are running dry early in the season due to drought and high usage.
Web Link:  http://www.fs.usda.gov/project/?project=63344
Location: UNIT - Salt Lake Ranger District. STATE - Utah. COUNTY - Tooele. LEGAL - Not Applicable. Located on the west side of the northern Stansbury Mountains, approximately 10 miles south of U.S. Highway 80 and off of Skull Valley Road.
Sugarloaf Patrol Building, Alta Ski Resort
CE
- Special use management  In Progress:
Scoping Start 08/11/2022 
Expected:09/2022
 
06/2023 Christopher Sailor
530-350-0387
christopher.sailor@usda.gov 
Description: Alta proposes to construct a new ski patrol building approximately 90 feet North of the existing structure, and to use the existing structure for storage. The footprint of the new building would not exceed 750 square ft.
Web Link:  http://www.fs.usda.gov/project/?project=62678
Location: UNIT - Salt Lake Ranger District. STATE - Utah. COUNTY - Salt Lake. LEGAL - Not Applicable. Alta Ski Resort.
Sunnyside Embankment Change, Alta Ski Resort
CE
- Special use management  In Progress:
Scoping Start 08/11/2022 
Expected:09/2022
 
06/2023 Christopher Sailor
530-350-0387
christopher.sailor@usda.gov 
Description: Alta proposes to place fill on Sunnyside run between the summer road and Albion Meadows trail to reduce the grade of the Sunnyside run below the summer road.
Web Link:  http://www.fs.usda.gov/project/?project=62680
Location: UNIT - Salt Lake Ranger District. STATE - Utah. COUNTY - Salt Lake. LEGAL - Not Applicable. Alta Ski Resort.
Supreme Snowmaking Corridors, Alta Ski Resort
CE
- Special use management  In Progress:
Scoping Start 08/11/2022 
Expected:09/2022
 
06/2023 Christopher Sailor
530-350-0387
christopher.sailor@usda.gov 
Description: Alta proposes to develop the snowmaking corridors necessary to provide a base for groomed run skiing from the top to the bottom of the Supreme lift, extending from a vault south of Alf%u2019s Restaurant to Cat Track below Grand Junction.
Web Link:  http://www.fs.usda.gov/project/?project=62684
Location: UNIT - Salt Lake Ranger District. STATE - Utah. COUNTY - Salt Lake. LEGAL - Not Applicable. Alta Ski Resort.
Tunnel Springs BST Connector Trail, SLC Foothills trail system
CE
- Recreation management  Developing Proposal
Est. Scoping Start 05/2022 
Expected:08/2022  09/2022 Zinnia Wilson
801-733-2662
zinnia.wilson@usda.gov 
Description: Proposal to provide access to the recently approved Bonneville Shoreline Trail in Davis County.
Web Link:  http://www.fs.usda.gov/project/?project=60778
Location: UNIT - Salt Lake Ranger District. STATE - Utah. COUNTY - Salt Lake. LEGAL - Not Applicable. South of Tunnel Springs Park & Trailhead in Salt Lake City, UT.
Wilbere Lift Replacement, Snowbird Ski Resort
CE
- Special use management  In Progress:
Scoping Start 08/11/2022 
Expected:09/2022
 
06/2023 Christopher Sailor
530-350-0387
christopher.sailor@usda.gov 
Description: Snowbird proposes to replace and realign Wilbere lift. The proposed lift would be a fixed-grip, top drive quad approximately 2,500 feet in length with a vertical rise of approximately 750 feet.
Web Link:  http://www.fs.usda.gov/project/?project=62690
Location: UNIT - Salt Lake Ranger District. STATE - Utah. COUNTY - Salt Lake. LEGAL - Not Applicable. Snowbird Ski Resort.
Wyssen Towers, Snowbird Ski Resort
CE
- Special use management  In Progress:
Scoping Start 08/11/2022 
Expected:09/2022
 
06/2023 Christopher Sailor
530-350-0387
christopher.sailor@usda.gov 
Description: Snowbird is seeking Forest Service approval to install the RACS known as a Wyssen Tower. In total, Snowbird proposes to construct 23 Wyssen Towers (fifteen on NFS lands; eight on private lands).
Web Link:  http://www.fs.usda.gov/project/?project=62691
Location: UNIT - Salt Lake Ranger District. STATE - Utah. COUNTY - Salt Lake. LEGAL - Not Applicable. Snowbird Ski Resort.
Back To Top

Uinta-Wasatch-Cache National Forest,   Spanish Fork Ranger District (excluding Projects occurring in more than one District)

R4 - Intermountain Region  
Project Name Project Purpose Planning Status Decision Expected Implementation Project Contact
Sheepcreek Big Game Winter Habitat Improvement
CE
- Vegetation management (other than forest products)  In Progress:
Scoping Start 08/18/2022 
Expected:08/2022
 
08/2022 Drew Eline
801-794-6771
Drew.Eline@usda.gov 
Description: Restore 2,981 acres of native shrub species in the Sheepcreek area to address threats to crucial winter foraging area for deer, elk, and moose.
Web Link:  http://www.fs.usda.gov/project/?project=62728
Location: UNIT - Spanish Fork Ranger District. STATE - Utah. COUNTY - Utah. LEGAL - Not Applicable. Approximately 25 miles southeast of Spanish Fork, off Highway 6 and Sheepcreek Road.
Utah County Watershed Plan - Maple Lake and McClellan Lake Dam Rehabilitation
EA

           *NEW LISTING*
- Watershed management  In Progress:
Scoping Start 11/08/2022 
Expected:06/2023
 
06/2024 Luke Decker
801-794-6776
luke.decker@usda.gov 
Description: Dam rehabilitation includes reconstructing spillways, removing clogged outlet pipes and replacing with properly sized conduits, installing drain systems, and buttressing existing structures to prevent movement or failure during seismic events.
Web Link:  http://www.fs.usda.gov/project/?project=62190
Location: UNIT - Spanish Fork Ranger District. STATE - Utah. COUNTY - Utah. LEGAL - Not Applicable. Maple Lake and McClellan Lake are above Payson City in the Payson Management Area.
In accordance with Federal civil rights law and U.S. Department of Agriculture (USDA) civil rights regulations and policies, the USDA, its Agencies, offices, and employees, and institutions participating in or administering USDA programs are prohibited from discriminating based on race, color, national origin, religion, sex, gender identity (including gender expression), sexual orientation, disability, age, marital status, family/parental status, income derived from a public assistance program, political beliefs, or reprisal or retaliation for prior civil rights activity, in any program or activity conducted or funded by USDA (not all bases apply to all programs). Remedies and complaint filing deadlines vary by program or incident.

Persons with disabilities who require alternative means of communication for program information (e.g., Braille, large print, audiotape, American Sign Language, etc.) should contact the responsible Agency or USDA’s TARGET Center at (202) 720-2600 (voice and TTY) or contact USDA through the Federal Relay Service at (800) 877-8339. Additionally, program information may be made available in languages other than English.

To file a program discrimination complaint, complete the USDA Program Discrimination Complaint Form, AD-3027, found online at http://www.ascr.usda.gov/complaint_filing_cust.html and at any USDA office or write a letter addressed to USDA and provide in the letter all of the information requested in the form. To request a copy of the complaint form, call (866) 632-9992. Submit your completed form or letter to USDA by:

(1) mail: U.S. Department of Agriculture
Office of the Assistant Secretary for Civil Rights
1400 Independence Avenue, SW
Washington, D.C. 20250-9410;

(2) fax: (202) 690-7442; or

(3) email: program.intake@usda.gov.

USDA is an equal opportunity provider, employer, and lender.