Schedule of Proposed Actions (SOPA) |
|||||
This report contains the best available information at the time of publication. Questions may be directed to the Project Contact. | |||||
Report Contents (click to jump to a section) : - Projects Occurring Nationwide - Projects Occurring in more than one Region (excluding Nationwide) - R5 - Pacific Southwest Region, Lake Tahoe Basin Mgt Unit, Forestwide (excluding Projects occurring in more than one Forest) | |||||
Projects Occurring Nationwide |
|||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
---|---|---|---|---|---|
Land Management Plan Direction for Old-Growth Forest Conditions Across the National Forest System EIS *UPDATED* |
- Land management planning |
In Progress: NOI in Federal Register 12/20/2023 Est. DEIS NOA in Federal Register 06/2024 |
Expected:01/2025 |
01/2025 |
Jennifer McRae 505-377-3145 Jennifer.McRae@usda.gov |
Description: Amend all land management plans for units of the National Forest System to include consistent direction to conserve and steward existing and recruit future old-growth forest conditions and to monitor their condition across planning areas of NFS.
Web Link: http://www.fs.usda.gov/project/?project=65356 |
|||||
Location: UNIT - All Districts-level Units. STATE - All States. COUNTY - All Counties. LEGAL - Not Applicable. National Forests and Grasslands (128 units). | |||||
Locatable Mining Rule - 36 CFR 228, subpart A. EIS |
- Regulations, Directives, Orders | On Hold | N/A | N/A |
Sarah Shoemaker 907-586-7886 sarahshoemaker@fs.fed.us |
Description: The U.S. Department of Agriculture proposes revisions to its regulations at 36 CFR 228, Subpart A governing locatable minerals operations on National Forest System lands.A draft EIS & proposed rule should be available for review/comment in late 2020
Web Link: http://www.fs.usda.gov/project/?project=57214 |
|||||
Location: UNIT - All Districts-level Units. STATE - All States. COUNTY - All Counties. LEGAL - Not Applicable. These regulations apply to all NFS lands open to mineral entry under the US mining laws. More Information is available at: https://www.fs.usda.gov/science-technology/geology/minerals/locatable-minerals/current-revisions. | |||||
Nationwide Aerial Application of Fire Retardant on National Forest System Land. EIS *UPDATED* |
- Regulations, Directives, Orders | Completed | Actual: 02/06/2024 | 02/2024 |
Laura Conway 406-802-4317 laura.conway@usda.gov |
Description: Programmatic Supplemental EIS for the Nationwide Aerial Application of Fire Retardant on National Forest System Land.
Web Link: http://www.fs.usda.gov/project/?project=60450 |
|||||
Location: UNIT - All Districts-level Units. STATE - All States. COUNTY - All Counties. LEGAL - Not Applicable. The direction in the SEIS will apply to use of aerially delivered fire retardant on all National Forest System land. . | |||||
Back To Top | |||||
Projects Occurring in more than one Region (excluding Nationwide) |
|||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
Tahoe 200 Events CE |
- Recreation management - Special use management |
In Progress: Scoping Start 05/01/2022 |
Expected:07/2022 |
08/2022 |
Kimberly Felton 530/543-2651 kimberly.felton@usda.gov |
Description: Authorize a 3-part foot-race event surrounding Lake Tahoe Basin on existing roads and trails through a special use permit. | |||||
Location: UNIT - Pacific Ranger District, Placerville Ranger District, Truckee Ranger District, Lake Tahoe Basin Mgt Unit, Carson Ranger District. STATE - California, Nevada. COUNTY - Alpine, El Dorado, Placer, Douglas, Washoe, Carson City (city). LEGAL - Not Applicable. Around the Lake Tahoe Basin using system roads and trails. Uses Tahoe Rim Trail. | |||||
Back To Top | |||||
Lake Tahoe Basin Mgt Unit, Forestwide (excluding Projects occurring in more than one Forest) |
R5 - Pacific Southwest Region | ||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
AT&T New Communication Site SUP CE |
- Special use management |
In Progress: Scoping Start 12/01/2021 |
Expected:03/2022 |
04/2022 |
Lindsay Gusses 530-543-2637 lindsay.gusses@usda.gov |
Description: AT&T has proposed to construct a new cellular communications site. The site would include a 140-foot tower and an equipment shed.
Web Link: http://www.fs.usda.gov/project/?project=58443 |
|||||
Location: UNIT - Lake Tahoe Basin Mgt Unit. STATE - California. COUNTY - Placer. LEGAL - Not Applicable. The communications site would be located off Bald Eagle Drive in Tahoma, CA. | |||||
Basin Wide Trails Analysis Project EA *UPDATED* |
- Recreation management |
In Progress: Comment Period Public Notice 09/29/2023 |
Expected:08/2024 |
09/2024 |
Michael Gabor 530-543-2642 michael.gabor@usda.gov |
Description: Project would alter trail system map to allow Class 1 e-bikes on specific trails and clarify trails where motorized access is permitted. Also would upgrade road/trail crossings over streams and wet areas, and upgrade trailhead parking areas.
Web Link: http://www.fs.usda.gov/project/?project=54566 |
|||||
Location: UNIT - Lake Tahoe Basin Mgt Unit. STATE - California. COUNTY - El Dorado. LEGAL - Not Applicable. Forest Service trails throughout the Lake Tahoe Basin Management Unit. | |||||
Burke Creek Restoration Project CE |
- Watershed management |
In Progress: Scoping Start 02/21/2023 |
Expected:02/2024 |
05/2024 |
Theresa Cody 530-543-2788 theresa.cody@usda.gov |
Description: Restoration of Burke Creek through Rabe Meadow to the mouth at Lake Tahoe. Existing Jennings Pond will be returned to a natural floodplain meadow. A new channel and mouth will be constructed adjacent to the campground. Fill Kahle ditch.
Web Link: http://www.fs.usda.gov/project/?project=63070 |
|||||
Location: UNIT - Lake Tahoe Basin Mgt Unit. STATE - Nevada. COUNTY - Douglas. LEGAL - Not Applicable. Stateline, NV. | |||||
Caldor Restoration Project EA |
- Wildlife, Fish, Rare plants - Vegetation management (other than forest products) - Fuels management - Watershed management - Special use management - Road management - Projects that may affect Wilderness (for mailing list contacts) |
Developing Proposal Est. Scoping Start 01/2024 |
Expected:09/2024 | 10/2024 |
Brian Garrett 530-543-2617 brian.garrett@usda.gov |
Description: The Caldor Fire affected lands within the Lake Tahoe Basin Management Unit. This project would seek to remove hazard trees, remove burned material, and restore soils/streams/meadows within the project area. New roads may be needed.
Web Link: http://www.fs.usda.gov/project/?project=65228 |
|||||
Location: UNIT - Lake Tahoe Basin Mgt Unit. STATE - California. COUNTY - El Dorado. LEGAL - Not Applicable. Within and adjacent to areas burned by the Caldor Fire on the Lake Tahoe Basin Management Unit. | |||||
El Dorado County - Renew Erosion Control SUP CE |
- Special use management |
In Progress: Scoping Start 09/30/2020 |
Expected:02/2022 |
03/2022 |
Karen Kuentz 530-543-2774 karen.kuentz@usda.gov |
Description: The special use permits for El Dorado County have expired and an application for their renewal has been submitted. The permits authorize erosion control improvements on National Forest System lands.
Web Link: http://www.fs.usda.gov/project/?project=58464 |
|||||
Location: UNIT - Lake Tahoe Basin Mgt Unit. STATE - California. COUNTY - El Dorado. LEGAL - Not Applicable. Many locations throughout El Dorado County. | |||||
IVGID Dog Park CE |
- Special use management | On Hold | N/A | N/A |
Karen Kuentz 530-721-9599 karen.kuentz@usda.gov |
Description: The Incline Village General Improvement District requests a special use permit to construct a dog park with fencing, parking, trails, and restrooms on approx. 3 acres of a 13-acre parcel.
Web Link: http://www.fs.usda.gov/project/?project=61089 |
|||||
Location: UNIT - Lake Tahoe Basin Mgt Unit. STATE - Nevada. COUNTY - Washoe. LEGAL - Not Applicable. Incline Village, NV, on parcel APN 131-110-04, adjacent to Village Blvd. | |||||
Lake Tahoe West EA |
- Wildlife, Fish, Rare plants - Forest products - Vegetation management (other than forest products) - Fuels management - Watershed management |
In Progress: Scoping Start 04/10/2020 Est. Comment Period Public Notice 03/2024 |
Expected:09/2024 |
10/2024 |
Brian Garrett 530-543-2617 brian.garrett@usda.gov |
Description: Healthy Forests and Watershed planning at a landscape scale on the West Shore of Lake Tahoe
Web Link: http://www.fs.usda.gov/project/?project=52975 |
|||||
Location: UNIT - Lake Tahoe Basin Mgt Unit. STATE - California. COUNTY - El Dorado, Placer. LEGAL - Not Applicable. West Shore of Lake Tahoe. | |||||
Lakewide Control of Aquatic Invasive Plants EA |
- Wildlife, Fish, Rare plants - Vegetation management (other than forest products) - Watershed management |
On Hold | N/A | N/A |
Sarah Muskopf 530-543-2835 sarah.muskopf@usda.gov |
Description: Conduct aquatic plant control and management throughout suitable habitat areas in Lake Tahoe, California and Nevada and the Truckee River. Partners with Tahoe Resource Conservation District and Tahoe Regional Planning Agency.
Web Link: http://www.fs.usda.gov/project/?project=58124 |
|||||
Location: UNIT - Lake Tahoe Basin Mgt Unit. STATE - California, Nevada. COUNTY - El Dorado, Placer, Douglas, Washoe, Carson City (city). LEGAL - Not Applicable. Suitable habitat areas within Lake Tahoe Basin including the Lake itself, tributaries and adjacent marshes of Lake Tahoe and the Truckee River as it flows into and out of Lake Tahoe. | |||||
Lakewide Control of Warm Water Fish CE |
- Wildlife, Fish, Rare plants | On Hold | N/A | N/A |
Sarah Muskopf 530-543-2835 sarah.muskopf@usda.gov |
Description: Use mechanical methods for control of target invasive fish in the Lake Tahoe regions. Target invasive fish species are species that contribute to declines in native and desirable recreational non-native fish.
Web Link: http://www.fs.usda.gov/project/?project=58447 |
|||||
Location: UNIT - Lake Tahoe Basin Mgt Unit. STATE - California, Nevada. COUNTY - El Dorado, Placer, Douglas, Washoe, Carson City (city). LEGAL - Not Applicable. Marsh areas and shallow water tributaries to Lake Tahoe on National Forest System land. | |||||
Marlette Creek Restoration and State Route 28 Crossing Improvement Project CE |
- Watershed management |
Developing Proposal Est. Scoping Start 01/2024 |
Expected:05/2024 | 07/2024 |
Theresa Cody 530-543-2788 theresa.cody@usda.gov |
Description: Restoration of Marlette Creek upstream and downstream of the Highway 28 culvert crossing, and along the South Fork of Marlette Creek upstream of the highway crossing. The culvert will be retrofitted to improve fish passage conditions.
Web Link: http://www.fs.usda.gov/project/?project=63071 |
|||||
Location: UNIT - Lake Tahoe Basin Mgt Unit. STATE - Nevada. COUNTY - Washoe. LEGAL - Not Applicable. Marlette Creek on East Shore of Lake Tahoe. | |||||
Meeks Bay Restoration EIS *UPDATED* |
- Recreation management - Heritage resource management - Wildlife, Fish, Rare plants - Watershed management - Facility management |
In Progress: DEIS NOA in Federal Register 06/10/2022 Est. FEIS NOA in Federal Register 04/2024 |
Expected:07/2024 |
04/2025 |
Ashley Sibr 530-543-2615 ashley.sibr@usda.gov |
Description: Restoration of Meeks Creek in Meeks Marina, remove marina, reconstruct Meeks campground, BMPs, pedestrian bridge over Meeks Creek, pathways, beach access, parking improvements, utility upgrades, alternatives for a pier
Web Link: http://www.fs.usda.gov/project/?project=52971 |
|||||
Location: UNIT - Lake Tahoe Basin Mgt Unit. STATE - California. COUNTY - El Dorado. LEGAL - Not Applicable. Meeks Bay Resort and Meeks Bay Campground east of SR89, as well as a short portion of Meeks Creek west of SR89. | |||||
Placer County North Tahoe Bike Trail Segment 1 CE |
- Special use management |
In Progress: Scoping Start 03/01/2022 |
Expected:05/2024 |
06/2024 |
Kimberly Felton 530/543-2651 kimberly.felton@usda.gov |
Description: Process special use permit application for construction of Segment 1 (1.7 miles; 2.88ac. on federal lands) of paved, non-motorized, multi-use North Tahoe Regional Trail connecting Kings Beach and Tahoe City.
Web Link: http://www.fs.usda.gov/project/?project=60221 |
|||||
Location: UNIT - Lake Tahoe Basin Mgt Unit. STATE - California. COUNTY - Placer. LEGAL - Not Applicable. Approx 1.7 miles length from the North Tahoe Regional Park in Tahoe Vista to Carnelian Bay Ave., Carnelian Bay, CA. | |||||
SR 28 Secret Harbor Parking Lot Determination of NEPA Adequacy EA(DNA) |
- Recreation management |
Developing Proposal Est. Scoping Start 12/2023 |
Expected:02/2024 | 05/2024 |
Michael Gabor 530-543-2642 michael.gabor@usda.gov |
Description: Determination of NEPA Adequacy to move the proposed location of the SR 28 Secret Harbor Parking lot to the south along FS Road in the location of a previous fuels project landing on NFS road 1556 ---DNA associated project number: 52969 Web Link: http://www.fs.usda.gov/project/?project=65222 |
|||||
Location: UNIT - Lake Tahoe Basin Mgt Unit. STATE - Nevada. COUNTY - Carson City (city). LEGAL - Not Applicable. SR 28 Secret Harbor Parking Lot on East Shore of Lake Tahoe. | |||||
South Tahoe Public Utility District - Angora Road SUP renewal CE |
- Special use management |
In Progress: Scoping Start 09/30/2020 |
Expected:03/2022 |
05/2022 |
Lindsay Gusses 530-543-2637 lindsay.gusses@usda.gov |
Description: Renew the special use permit (SUP) for the expired Angora water tank access road. The application proposes that the road be added via amendment to an existing SUP that authorizes all STPUD water system improvements.
Web Link: http://www.fs.usda.gov/project/?project=58445 |
|||||
Location: UNIT - Lake Tahoe Basin Mgt Unit. STATE - California. COUNTY - El Dorado. LEGAL - Not Applicable. The access road extends from the end of Michael Court to the STPUD water tank in South Lake Tahoe, CA. | |||||
Truckee River First Four Mile Stream Stabilization and Restoration CE |
- Vegetation management (other than forest products) - Watershed management |
On Hold | N/A | N/A |
Joey Keely 530-543-2661 joseph.keely@usda.gov |
Description: The proposed project will protect and restore approximately 900 lineal feet of stream bank, riparian and wet meadow habitat. It will also provide conservation and protection for approximately 2,000 lineal feet of river.
Web Link: http://www.fs.usda.gov/project/?project=55024 |
|||||
Location: UNIT - Lake Tahoe Basin Mgt Unit. STATE - California. COUNTY - Placer. LEGAL - Not Applicable. The project is on NFS lands in four sites along the Truckee River from approximately 1.3 miles below Lake Tahoe Dam to just upstream of Alpine Meadows Road. | |||||
Upper Bijou Park Creek Restoration and Water Quality Improvement Project CE |
- Watershed management |
Developing Proposal Est. Scoping Start 11/2022 |
Expected:02/2023 | 07/2023 |
Theresa Cody 530-543-2788 theresa.cody@usda.gov |
Description: Project will construct erosion control improvements in the urban area of the Upper Bijou Park Creek, addressing flooding issues and needed roadway improvements. Creek channel will also be restored upstream and downstream of Pioneer Trail | |||||
Location: UNIT - Lake Tahoe Basin Mgt Unit. STATE - California. COUNTY - El Dorado. LEGAL - Not Applicable. South Lake Tahoe, CA. | |||||
Urban Forest Defense Zone Fuels Reduction Project CE |
- Vegetation management (other than forest products) - Fuels management |
In Progress: Scoping Start 08/06/2021 |
Expected:12/2021 |
01/2022 |
Brian Garrett 530-543-2617 brian.garrett@usda.gov |
Description: Programmatic treatments to address ongoing fuels and forest health needs on NFS urban forest parcels and within WUI Defense Zone.
Web Link: http://www.fs.usda.gov/project/?project=48788 |
|||||
Location: UNIT - Lake Tahoe Basin Mgt Unit. STATE - California, Nevada. COUNTY - Alpine, El Dorado, Placer, Douglas, Washoe, Carson City (city). LEGAL - Not Applicable. LTBMU wide. | |||||
Winter Recreation and Over Snow Vehicle Travel Management EA |
- Land management planning - Recreation management - Facility management - Road management |
In Progress: Scoping Start 09/20/2019 Est. Comment Period Public Notice 10/2023 |
Expected:06/2024 |
10/2024 |
Ashley Sibr 530-543-2615 ashley.sibr@usda.gov |
Description: Designate roads, trails, and areas where OSV use is in accordance with Subpart C of the Travel Management Rule. Create snow-play areas, expand parking lots, and groom motorized and non-motorized trails. Add a Forest Plan Amendment.
Web Link: http://www.fs.usda.gov/project/?project=47342 |
|||||
Location: UNIT - Lake Tahoe Basin Mgt Unit. STATE - California, Nevada. COUNTY - Alpine, El Dorado, Placer, Douglas, Washoe, Carson City (city). LEGAL - Not Applicable. Lake Tahoe Basin. | |||||
Zephyr Cove Resort Pier Health and Safety Expansion EA *UPDATED* |
- Facility management |
Developing Proposal Est. Scoping Start 09/2024 |
Expected:05/2025 | 11/2025 |
Daniel Cressy 530-543-2857 daniel.cressy@usda.gov |
Description: Expand the existing pier at Zephyr Cove Resort to provide facilities for public health and safety agencies in and around Douglas County that utilize boats to fulfill their missions. | |||||
Location: UNIT - Lake Tahoe Basin Mgt Unit. STATE - Nevada. COUNTY - Douglas. LEGAL - Not Applicable. Zephyr Cove Resort in Zephyr Cove, NV. | |||||
In accordance with Federal civil rights law and U.S. Department of Agriculture (USDA) civil rights regulations and policies, the USDA, its Agencies, offices, and employees, and institutions participating in or administering USDA programs are prohibited from discriminating based on race, color, national origin, religion, sex, gender identity (including gender expression), sexual orientation, disability, age, marital status, family/parental status, income derived from a public assistance program, political beliefs, or reprisal or retaliation for prior civil rights activity, in any program or activity conducted or funded by USDA (not all bases apply to all programs). Remedies and complaint filing deadlines vary by program or incident.
Persons with disabilities who require alternative means of communication for program information (e.g., Braille, large print, audiotape, American Sign Language, etc.) should contact the responsible Agency or USDA’s TARGET Center at (202) 720-2600 (voice and TTY) or contact USDA through the Federal Relay Service at (800) 877-8339. Additionally, program information may be made available in languages other than English. To file a program discrimination complaint, complete the USDA Program Discrimination Complaint Form, AD-3027, found online at http://www.ascr.usda.gov/complaint_filing_cust.html and at any USDA office or write a letter addressed to USDA and provide in the letter all of the information requested in the form. To request a copy of the complaint form, call (866) 632-9992. Submit your completed form or letter to USDA by: (1) mail: U.S. Department of Agriculture Office of the Assistant Secretary for Civil Rights 1400 Independence Avenue, SW Washington, D.C. 20250-9410; (2) fax: (202) 690-7442; or (3) email: program.intake@usda.gov. USDA is an equal opportunity provider, employer, and lender. |