Schedule of Proposed Actions (SOPA) |
|||||
This report contains the best available information at the time of publication. Questions may be directed to the Project Contact. | |||||
Report Contents (click to jump to a section) : - Projects Occurring Nationwide - R6 - Pacific Northwest Region, Occurring in more than one Forest (excluding Regionwide) - R6 - Pacific Northwest Region, Umatilla National Forest, Occurring in more than one District (excluding Forestwide) - R6 - Pacific Northwest Region, Umatilla National Forest, Heppner Ranger District (excluding Projects occurring in more than one District) - R6 - Pacific Northwest Region, Umatilla National Forest, North Fork John Day Ranger District (excluding Projects occurring in more than one District) - R6 - Pacific Northwest Region, Umatilla National Forest, Pomeroy Ranger District (excluding Projects occurring in more than one District) - R6 - Pacific Northwest Region, Umatilla National Forest, Walla Walla Ranger District (excluding Projects occurring in more than one District) | |||||
Projects Occurring Nationwide |
|||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
---|---|---|---|---|---|
Land Management Plan Direction for Old-Growth Forest Conditions Across the National Forest System EIS *UPDATED* |
- Land management planning | Cancelled | N/A | N/A |
Jennifer McRae 202-791-8488 SM.FS.NFSWONGA@usda.gov |
Description: Amend all land management plans for units of the National Forest System to include consistent direction to conserve and steward existing and recruit future old-growth forest conditions and to monitor their condition across planning areas of NFS.
Web Link: http://www.fs.usda.gov/project/?project=65356 |
|||||
Location: UNIT - All Districts-level Units. STATE - All States. COUNTY - All Counties. LEGAL - Not Applicable. National Forests and Grasslands (128 units). | |||||
Locatable Mining Rule - 36 CFR 228, subpart A. EIS |
- Regulations, Directives, Orders | On Hold | N/A | N/A |
Sarah Shoemaker 907-586-7886 sarahshoemaker@fs.fed.us |
Description: The U.S. Department of Agriculture proposes revisions to its regulations at 36 CFR 228, Subpart A governing locatable minerals operations on National Forest System lands.A draft EIS & proposed rule should be available for review/comment in late 2020
Web Link: http://www.fs.usda.gov/project/?project=57214 |
|||||
Location: UNIT - All Districts-level Units. STATE - All States. COUNTY - All Counties. LEGAL - Not Applicable. These regulations apply to all NFS lands open to mineral entry under the US mining laws. More Information is available at: https://www.fs.usda.gov/science-technology/geology/minerals/locatable-minerals/current-revisions. | |||||
Back To Top | |||||
R6 - Pacific Northwest Region, Occurring in more than one Forest (excluding Regionwide) |
|||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
Blue Mountains Forest Plan Revision EIS |
- Land management planning | On Hold | N/A | N/A |
Gene Yates 541-523-1290 gyates@fs.fed.us |
Description: The revised Land Management Plans (Forest Plans) for the Malheur, Umatilla, and Wallowa-Whitman National Forests (Blue Mountains) provide an updated framework to guide the management of approximately 5.5 million acres of National Forest System lands.
Web Link: http://www.fs.usda.gov/goto/BlueMountainForestPlanRevisionComments |
|||||
Location: UNIT - Malheur National Forest All Units, Wallowa Valley Ranger District, Eagle Cap Ranger District, La Grande Ranger District, Umatilla National Forest All Units, Whitman Ranger District. STATE - Oregon, Washington. COUNTY - Asotin, Columbia, Garfield, Walla Walla, Baker, Grant, Harney, Morrow, Umatilla, Union, Wallowa, Wheeler. LEGAL - Not Applicable. Forest-wide for Malheur, Umatilla, & Wallowa-Whitman (except for the HCNRA). | |||||
Blue Mountains Forest Plan Revision EIS *UPDATED* |
- Land management planning |
Developing Proposal Est. NOI in Federal Register 05/2025 |
Expected:07/2027 | 07/2027 |
Michael Neuenschwander 541-278-3716 sm.fs.bluesforests@usda.gov |
Description: Land Management Plan revision for the Malheur, Umatilla, and Wallowa-Whitman (excluding Hells Canyon NRA) National Forests, which will provide management direction on approximately 4.9 million acres of public lands.
Web Link: https://www.fs.usda.gov/project/?project=64157 |
|||||
Location: UNIT - Malheur National Forest All Units, Wallowa Valley Ranger District, Eagle Cap Ranger District, La Grande Ranger District, Umatilla National Forest All Units, Whitman Ranger District. STATE - Oregon, Washington. COUNTY - Asotin, Columbia, Garfield, Walla Walla, Baker, Crook, Grant, Harney, Malheur, Morrow, Umatilla, Union, Wallowa, Wheeler. LEGAL - Not Applicable. The Malheur, Umatilla and Wallowa-Whitman Forests in northeastern Oregon and southeastern Washington. | |||||
Region 6 Elite Tree Protection Project CE |
- Wildlife, Fish, Rare plants - Vegetation management (other than forest products) |
Developing Proposal Est. Scoping Start 04/2023 |
Expected:09/2023 | 09/2023 |
Claire Ellwanger 509-860-2463 claire.ellwanger@usda.gov |
Description: The Pacific Northwest Region is collaborating with nine Forests to develop a region-wide project to protect whitebark pine trees (Pinus albicaulis) that have a high level of white pine blister rust resistance.
Web Link: http://www.fs.usda.gov/project/?project=63727 |
|||||
Location: UNIT - Malheur National Forest All Units, Mt Baker-Snoqualmie National Forest All Units, Umpqua National Forest All Units, Wallowa-Whitman National Forest All Units, Okanogan-Wenatchee National Forest All Units, Deschutes National Forest All Units, Fremont-Winema National Forest All Units, Umatilla National Forest All Units, Colville National Forest All Units. STATE - Oregon, Washington. COUNTY - Chelan, Ferry, King, Kittitas, Okanogan, Pend Oreille, Skagit, Snohomish, Stevens, Whatcom, Yakima, Baker, Deschutes, Douglas, Grant, Jefferson, Klamath, Lake, Lane, Union, Wallowa. LEGAL - Not Applicable. National Forest units, typically high elevation, where blister-rust resistant white-bark pine trees have been identified or are in screening, and areas that are high priority for new selections. | |||||
Back To Top | |||||
Umatilla National Forest, Occurring in more than one District (excluding Forestwide) |
R6 - Pacific Northwest Region | ||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
Ellis Integrated Vegetation Project EIS |
- Recreation management - Forest products - Fuels management |
In Progress: DEIS NOA in Federal Register 03/04/2022 Est. FEIS NOA in Federal Register 02/2025 |
Expected:04/2025 |
04/2025 |
Kristen Marshall 541-676-2130 kristen.marshall@usda.gov |
Description: The Ellis Project is being developed to improve wildlife habitat, restore resiliency against insect/disease and wildfire, protect values at risk, provide timber products, and enhance public and traditional land uses.
Web Link: http://www.fs.usda.gov/project/?project=41350 |
|||||
Location: UNIT - Heppner Ranger District, North Fork John Day Ranger District. STATE - Oregon. COUNTY - Grant, Morrow, Wheeler. LEGAL - Township 4S, Range 28E, 29E, and 30E; Township 5S, Range 27E, 28E, 29E, and 30E; Township 6S, Range 2EE, 29E, and 30E; & Township 7S, Range 28E and 29E. Willamette meridian. Approximately 15 miles south east of Heppner and 7 miles west of Ukiah, Oregon. Within Upper Butter, Upper Willow,Rhea, Lower Camas, and Potamus Creek-North Fork John Day River 5th field watershed. | |||||
South Zone Timber Stand Improvement CE CE |
- Forest products - Vegetation management (other than forest products) |
On Hold | N/A | N/A |
Richard Occhiuto 541-676-2140 Richard.Occhiuto@usda.gov |
Description: Project objectives are to perform backlogged maintenance work on planted and/or naturally regenerated areas post harvest or burn activity across the South Zone of the Umatilla National Forest. | |||||
Location: UNIT - Heppner Ranger District, North Fork John Day Ranger District. STATE - Oregon. COUNTY - Grant, Morrow, Umatilla, Wheeler. LEGAL - Not Applicable. Across the Heppner Ranger District in previously treated stands including plantations and units that naturally generated following timber harvests or wildfires from 1980 to 2010. | |||||
Back To Top | |||||
Umatilla National Forest, Heppner Ranger District (excluding Projects occurring in more than one District) |
R6 - Pacific Northwest Region | ||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
Black Mountain Power Upgrade CE |
- Special use management | On Hold | N/A | N/A |
Kiyoshi Fujishin 509-522-6277 kiyoshi.fujisin@usda.gov |
Description: Upgrade a failing underground electrical line to the top of Black Mountain and installation of innerduct for fiber which would allow the communications network to be strengthened. | |||||
Location: UNIT - Heppner Ranger District. STATE - Oregon. COUNTY - Morrow. LEGAL - Beginning on Forest boundary of Section 14 T.4s., R.28E. Extending southerly across section 14 to Black Mountain electronic site located in SW1/4, SE1/4 of section 14 T4s. R28. Line Originates on the Northern Slope of Black Mountain and proceeds to the top of the Black Mountain. | |||||
Swale Creek Material Source Expansion CE |
- Minerals and Geology | On Hold | N/A | N/A |
Paul Gennett 541-427-5351 paul.gennett@usda.gov |
Description: Excavating, crushing, stockpiling, and removing rock for the maintenance of Road 21. There may be several repeating cycles of activity as the surface of the pit is lowered and expanded, growing the pit from about 6 acres to 10 acres. | |||||
Location: UNIT - Heppner Ranger District. STATE - Oregon. COUNTY - Morrow. LEGAL - TS6, R28E Sec.03. TS6, R28E Sec.03. Trucks and rock crushing equipment will access the pit from FS Road 21 (County Road 847, Western Route Road). | |||||
Tamarack Seismic Monitoring Sensor Installation CE |
- Special use management |
Developing Proposal Est. Scoping Start 11/2024 |
Expected:12/2024 | 06/2025 |
Kiyoshi Fujishin 509-522-6277 kiyoshi.fujisin@usda.gov |
Description: Installation of a seismic monitoring sensor adjacent to Tamarack Lookout.
Web Link: https://usdagcc.sharepoint.com/sites/fs-r06-unfnepa/sz/SitePages/Home.aspx?RootFolder=%2Fsites%2Ffs%2Dr06%2Dunfnepa%2Fsz%2FShared%20Documents%2Fsz%20Small%20NEPA%2F%5FSpecial%20Uses%2FhpSeismic%20Monitoring&FolderCTID=0x012000374DBDDC67D45546BEFAC645 |
|||||
Location: UNIT - Heppner Ranger District. STATE - Oregon. COUNTY - Grant. LEGAL - T.8S., R.26E., SEC 18. Tamarack Lookout off the FS-2470 040 road spur 3 miles off the FS-24 Road. | |||||
Top Road Fuel Break (CE) CE |
- Fuels management | On Hold | N/A | N/A |
Jeromy Wilson 541-676-2103 jeromy.wilson@usda.gov |
Description: Top Road Fuelbreak Project is located in the Lower Big Wall Creek and Cupper Canyon-North Fork John Day River watersheds. The constructed fuelbreak will run along roadways and existing fire break on National Forest Service lands.
Web Link: http://www.fs.usda.gov/project/?project=64201 |
|||||
Location: UNIT - Heppner Ranger District. STATE - Oregon. COUNTY - Grant. LEGAL - Not Applicable. The fuelbreak runs along the boundary of the Umatilla National Forest, Bureau of Land Management, and the private lands of the Top Road Firewise Community. The project intersects County Road 670. | |||||
Willow Creek Road Underground Line Renewal CE |
- Special use management |
In Progress: Scoping Start 03/29/2021 |
Expected:09/2024 |
09/2024 |
Kiyoshi Fujishin 509-522-6277 kiyoshi.fujisin@usda.gov |
Description: Re-issue SUP for Buried communications line along and within the existing Morrow County Road Right-of-Way of County Road 53, to provide telephone service to private landowners. | |||||
Location: UNIT - Heppner Ranger District. STATE - Oregon. COUNTY - Morrow. LEGAL - T4sR28e. Buried communications lines along and within the existing Morrow County Road Right-of-Way of the Willow Creek Road. Approximately 1 mile NW of Cutsforth Park. | |||||
Back To Top | |||||
Umatilla National Forest, North Fork John Day Ranger District (excluding Projects occurring in more than one District) |
R6 - Pacific Northwest Region | ||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
54 North Fuels Reduction and Huckleberry Restoration Project EA |
- Fuels management |
Developing Proposal Est. Scoping Start 03/2025 |
Expected:10/2025 | 12/2025 |
Leslie Taylor 541-427-5324 leslie.d.taylor@usda.gov |
Description: To restore resilience in dry upland forests by protecting old trees, reducing surface fuels, reducing overall forest density, and shifting composition from intolerant to fire tolerant species. Improve habitat for huckleberry.
Web Link: http://www.fs.usda.gov/project/?project=66947 |
|||||
Location: UNIT - North Fork John Day Ranger District. STATE - Oregon. COUNTY - Umatilla, Union. LEGAL - Not Applicable. The project is about 7 miles northeast of Ukiah in Umatilla and Union Counties. | |||||
54 Road Repair Project CE |
- Wildlife, Fish, Rare plants - Road management |
Developing Proposal Est. Scoping Start 12/2024 |
Expected:04/2025 | 06/2025 |
Ardin Hoyt 541-575-3316 ardin.hoyt@usda.gov |
Description: Repair, realign, and stabilize the 54 Road in response to past flooding and human activities to restore access to/from the National Forest on impacted sections of the 54 road.
Web Link: http://www.fs.usda.gov/project/?project=67338 |
|||||
Location: UNIT - North Fork John Day Ranger District. STATE - Oregon. COUNTY - Umatilla. LEGAL - Not Applicable. Project is located along NFSR-54 from milepost 0.0 to milepost 11.0 within Pearson Creek/East Birch Creek, Pilot Rock, Oregon. | |||||
55 Road Repair Project CE *NEW LISTING* |
- Road management | Completed | Actual: 03/13/2025 | 05/2025 |
Bradley Lathrop 541-427-5366 bradley.lathrop@usda.gov |
Description: An approximately 25 foot portion of the 55 Road shoulder failed during above average precipitation, resulting in a public safety hazard. The proposed action will widen the existing road by excavating into the hillslope approximately 8 to 10 feet.
Web Link: http://www.fs.usda.gov/project/?project=67736 |
|||||
Location: UNIT - North Fork John Day Ranger District. STATE - Oregon. COUNTY - Umatilla. LEGAL - Not Applicable. On USFS Road 55 at Township 06S Range 32E Section 32. | |||||
Battle and Bruin (EA) EA |
- Forest products - Fuels management |
Developing Proposal Est. Scoping Start 09/2025 |
Expected:03/2026 | 06/2026 |
Brien Park 702-262-9047 brien.park@usda.gov |
Description: Project is in early developmental stages and was initially identified as potential project area because of forest health issues related to insect and disease. Objective would be to increase forest resilience to large-scale wildfire, insect and diseas | |||||
Location: UNIT - North Fork John Day Ranger District. STATE - Oregon. COUNTY - Grant. LEGAL - Township 7, 8, 9 South; Range 32, 33, 34 East; Section 1-36. Less than one mile east of Dale, Oregon. Project extends southeast along the 10 road. | |||||
ODOT Weather Traffic Camera (HW 244 and NF-5160) CE |
- Special use management |
In Progress: Scoping Start 02/15/2023 |
Expected:11/2023 |
12/2023 |
Kiyoshi Fujishin 509-522-6277 kiyoshi.fujisin@usda.gov |
Description: Special Use Permit to allow the installation and continued maintenance of a roadside weather station to gather real-lime weather and traffic condition information to improve safety for the traveling public.
Web Link: http://www.fs.usda.gov/project/?project=65188 |
|||||
Location: UNIT - North Fork John Day Ranger District. STATE - Oregon. COUNTY - Union. LEGAL - Not Applicable. southeast corner of the HW244 intersection with forest road 5160 (Lat, Long: 45.183679, -118.530170). | |||||
ODOT Weather Traffic Camera (HW 244 and NF-5160) CE |
- Special use management |
In Progress: Scoping Start 02/15/2023 |
Expected:11/2023 |
12/2023 |
Kiyoshi Fujishin 509-522-6277 kiyoshi.fujisin@usda.gov |
Description: Special Use Permit to allow the installation and continued maintenance of a roadside weather station to gather real-lime weather and traffic condition information to improve safety for the traveling public. | |||||
Location: UNIT - North Fork John Day Ranger District. STATE - Oregon. COUNTY - Union. LEGAL - Not Applicable. southeast corner of the HW244 intersection with forest road 5160 (Lat, Long: 45.183679, -118.530170). | |||||
Pearson Pond Removal CE |
- Watershed management |
In Progress: Scoping Start 03/18/2024 |
Expected:10/2024 |
10/2024 |
Curtis Booher 541-426-5536 curtis.booher@usda.gov |
Description: Restore area, which has been negatively affected by unauthorized alteration of terrain, to desired natural conditions by selective contouring, pipe removal and reseeding with native plants and grasses.
Web Link: http://www.fs.usda.gov/project/?project=66952 |
|||||
Location: UNIT - North Fork John Day Ranger District. STATE - Oregon. COUNTY - Umatilla. LEGAL - Not Applicable. Pearson Recreation Residence Tract, Township 6S, Range 33E. | |||||
Whitebark Pine Protection and Recovery CE CE *NEW LISTING* |
- Vegetation management (other than forest products) | Completed | Actual: 03/13/2025 | 03/2025 |
Diane Shirley 541-427-5315 diane.shirley@usda.gov |
Description: Protection of Whitebark Pine stands from wildfire, disease, and insect infestation by pruning, thinning, and creating a 500ft buffer around extant stands. Promote species recovery by planting WBP seedlings in optimal NFJD RD habitat locations.
Web Link: http://www.fs.usda.gov/project/?project=67737 |
|||||
Location: UNIT - North Fork John Day Ranger District. STATE - Oregon. COUNTY - Grant, Umatilla. LEGAL - Not Applicable. Vinegar Hill, Desolation Butte, Tower Mountain, Summit Camp. | |||||
Back To Top | |||||
Umatilla National Forest, Pomeroy Ranger District (excluding Projects occurring in more than one District) |
R6 - Pacific Northwest Region | ||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
Cottonwood Water Tank CE |
- Grazing management |
In Progress: Scoping Start 02/10/2023 |
Expected:06/2023 |
06/2023 |
Angela Druffel 509-843-4672 angela.druffel@usda.gov |
Description: Place a 6,000 gal. water storage tank and associated water trough in Cottonwood pasture. Permittee will haul water to the storage tank during grazing season to discourage cattle movement beyond the pasture boundary. | |||||
Location: UNIT - Pomeroy Ranger District. STATE - Washington. COUNTY - Asotin. LEGAL - T 9 N, R 43 E, Sec. 13. Cottonwood Pasture, just inside Forest boundary above Cottonwood Barn, Lick Creek. | |||||
FSR 47 ERFO Chipseal CE *UPDATED* |
- Road management |
In Progress: Scoping Start 03/14/2025 |
Expected:04/2025 |
06/2025 |
John Manderscheid 509-522-6041 john.manderscheid@usda.gov |
Description: There is a need to complete repairs initiated after the 2020 flood and resurfacing the existing 8 miles of asphalt pavement to provide a smooth-running surface for the portion of NFSR 47 that accesses the Forest Service land.
Web Link: http://www.fs.usda.gov/project/?project=67067 |
|||||
Location: UNIT - Pomeroy Ranger District. STATE - Washington. COUNTY - Columbia. LEGAL - T9N, R41E, Sec. 2-3, 10-11, 15-16, 20-21, 29-30. 14.5 miles south of Pomeroy, WA. | |||||
Mt. Misery Snowshelter Relocation CE |
- Recreation management |
Developing Proposal Est. Scoping Start 12/2024 |
Expected:12/2024 | 03/2025 |
William Marquardt 509-843-4658 wiilliam.marquardt@usda.gov |
Description: Mt. Misery Snowshelter proposed to be moved to reduce ongoing impacts and comply with NHPA. | |||||
Location: UNIT - Pomeroy Ranger District. STATE - Washington. COUNTY - Garfield. LEGAL - Not Applicable. Mt. Misery Snowshelter Site, FS Road 40, Umatilla National Forest. | |||||
Phase II - PRD Maint. NCT & Prescribed Fire CE |
- Fuels management |
In Progress: Scoping Start 09/01/2023 |
Expected:02/2025 |
06/2025 |
Eric Crawford 509-843-4634 eric.crawford@usda.gov |
Description: Up to 3600 acres of non-commerical thinning and 7300 acres of prescribed fire.
Web Link: http://www.fs.usda.gov/project/?project=64506 |
|||||
Location: UNIT - Pomeroy Ranger District. STATE - Washington. COUNTY - Garfield. LEGAL - T. 8 N, R. 42 E, sec. 4-5. T. 9 N, R. 42 E, sec. 1-4, 9-12, 14-17, 20-22, 27-29, 32-33. The project is located between Forest roads 4000 (Mountian Road) and 4200 (Iron Springs. | |||||
Back To Top | |||||
Umatilla National Forest, Walla Walla Ranger District (excluding Projects occurring in more than one District) |
R6 - Pacific Northwest Region | ||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
Bluewood Lift Replacement and On-Mountain Projects CE |
- Recreation management |
In Progress: Comment Period Public Notice 08/22/2024 |
Expected:11/2024 |
11/2024 |
Andrew Steele 509-522-6276 andrew.steele@usda.gov |
Description: Bluewood proposes to enhance their user experience through replacement of an aging lift, lodge renovations, overnight lodging development, mountain bike trail development, ski run improvements and construction, and snowmaking installation.
Web Link: http://www.fs.usda.gov/project/?project=66791 |
|||||
Location: UNIT - Walla Walla Ranger District. STATE - Washington. COUNTY - Columbia. LEGAL - Not Applicable. The project is within the existing Special Use Permit boundary of Bluewood Ski Area. | |||||
Burnt Cabin Trail Bridge Replacement CE |
- Recreation management |
In Progress: Scoping Start 02/19/2021 |
Expected:04/2021 |
07/2021 |
Andrew Steele 509-522-6276 andrewtsteele@fs.fed.us |
Description: This project will replace in kind the damaged Burnt Cabin Trail Bridge, removed in October 2020 due to imminent safety concerns. The replacement bridge will cross the SF Walla Walla River in the same footprint.
Web Link: http://www.fs.usda.gov/project/?project=59372 |
|||||
Location: UNIT - Walla Walla Ranger District. STATE - Oregon. COUNTY - Umatilla. LEGAL - T4N, R38E, S9. The bridge will be replaced where Burnt Cabin Trail #3226 crosses the South Fork Walla Walla River. | |||||
Focused Steep Slope Logging Study, Thomas Creek and High Buck Areas CE *UPDATED* |
- Forest products | Cancelled | N/A | N/A |
Brien Park 702-262-9047 brien.park@usda.gov |
Description: Propose to change steep slope logging system activities previously analyzed for skyline logging to a cable assist system for the identified harvest units.
Web Link: http://www.fs.usda.gov/project/?project=63987 |
|||||
Location: UNIT - Walla Walla Ranger District. STATE - Oregon. COUNTY - Umatilla, Union. LEGAL - Not Applicable. Various steep slopes in Umatilla and Union Counties in the Umatilla National Forest, Walla Walla District. | |||||
Summit Road Fuels Reduction CE *NEW LISTING* |
- Vegetation management (other than forest products) - Fuels management |
In Progress: Scoping Start 03/26/2025 |
Expected:06/2025 |
07/2025 |
Joseph Sciarrino 509-522-6283 joseph.sciarrino@usda.gov |
Description: The project would reduce fuels and improve forest health along the strategic control features of Forest Roads 31 (Summit Road) and 32 (Dry Creek).
Web Link: http://www.fs.usda.gov/project/?project=67399 |
|||||
Location: UNIT - Walla Walla Ranger District. STATE - Oregon, Washington. COUNTY - Columbia, Walla Walla, Umatilla, Wallowa. LEGAL - T1S R37E Sec1; T1S R38E Sec6,7;T1N R38E Sec5,6,18,19,30,31; T1N R37E Sec1,2,13-15,22-24,25-26, 36; T2N R37E Sec 13,14,23,24,25,26,35,36; T2N R38E Sec 9,18,19,30,31. The project area is located approximately 9 miles West of Elgin, Oregon and encompasses 14.6 miles of Forest Service Road 31 known as Summit Road. | |||||
Tiger-Mill EA *UPDATED* |
- Vegetation management (other than forest products) - Fuels management - Watershed management |
Completed | Actual: 02/26/2025 | 06/2025 |
Joseph Sciarrino 509-522-6283 joseph.sciarrino@usda.gov |
Description: The Tiger-Mill Project is being proposed to protect the Mill Creek Municipal Watershed and restore ecosystem processes and functions that foster landscape diversity and achieve desired vegetation conditions.
Web Link: http://www.fs.usda.gov/project/?project=62658 |
|||||
Location: UNIT - Walla Walla Ranger District. STATE - Oregon, Washington. COUNTY - Columbia, Walla Walla, Umatilla, Wallowa. LEGAL - Not Applicable. The project area is east of the City of Walla Walla situated on the west slope of the Blue Mountains and encompasses the Mill Creek Municipal Watershed . | |||||
In accordance with Federal civil rights law and U.S. Department of Agriculture (USDA) civil rights regulations and policies, the USDA, its Agencies, offices, and employees, and institutions participating in or administering USDA programs are prohibited from discriminating based on race, color, national origin, religion, sex, gender identity (including gender expression), sexual orientation, disability, age, marital status, family/parental status, income derived from a public assistance program, political beliefs, or reprisal or retaliation for prior civil rights activity, in any program or activity conducted or funded by USDA (not all bases apply to all programs). Remedies and complaint filing deadlines vary by program or incident.
Persons with disabilities who require alternative means of communication for program information (e.g., Braille, large print, audiotape, American Sign Language, etc.) should contact the responsible Agency or USDA’s TARGET Center at (202) 720-2600 (voice and TTY) or contact USDA through the Federal Relay Service at (800) 877-8339. Additionally, program information may be made available in languages other than English. To file a program discrimination complaint, complete the USDA Program Discrimination Complaint Form, AD-3027, found online at http://www.ascr.usda.gov/complaint_filing_cust.html and at any USDA office or write a letter addressed to USDA and provide in the letter all of the information requested in the form. To request a copy of the complaint form, call (866) 632-9992. Submit your completed form or letter to USDA by: (1) mail: U.S. Department of Agriculture Office of the Assistant Secretary for Civil Rights 1400 Independence Avenue, SW Washington, D.C. 20250-9410; (2) fax: (202) 690-7442; or (3) email: program.intake@usda.gov. USDA is an equal opportunity provider, employer, and lender. |