Report Contents (click to jump to a section) : - Projects Occurring Nationwide - R8 - Southern Region, Cherokee National Forest, Forestwide (excluding Projects occurring in more than one Forest) - R8 - Southern Region, Cherokee National Forest, Occurring in more than one District (excluding Forestwide) - R8 - Southern Region, Cherokee National Forest, Ocoee - Hiwassee Ranger District (excluding Projects occurring in more than one District) - R8 - Southern Region, Cherokee National Forest, Tellico Ranger District (excluding Projects occurring in more than one District) - R8 - Southern Region, Cherokee National Forest, Unaka Ranger District (excluding Projects occurring in more than one District) - R8 - Southern Region, Cherokee National Forest, Watauga Ranger District (excluding Projects occurring in more than one District) | |||||
Projects Occurring Nationwide |
|||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
---|---|---|---|---|---|
Locatable Mining Rule - 36 CFR 228, subpart A. EIS |
- Regulations, Directives, Orders | On Hold | N/A | N/A |
Sarah Shoemaker 907-586-7886 sarahshoemaker@fs.fed.us |
Description: The U.S. Department of Agriculture proposes revisions to its regulations at 36 CFR 228, Subpart A governing locatable minerals operations on National Forest System lands.A draft EIS & proposed rule should be available for review/comment in late 2020
Web Link: http://www.fs.usda.gov/project/?project=57214 |
|||||
Location: UNIT - All Districts-level Units. STATE - All States. COUNTY - All Counties. LEGAL - Not Applicable. These regulations apply to all NFS lands open to mineral entry under the US mining laws. More Information is available at: https://www.fs.usda.gov/science-technology/geology/minerals/locatable-minerals/current-revisions. | |||||
Back To Top | |||||
Cherokee National Forest, Forestwide (excluding Projects occurring in more than one Forest) |
R8 - Southern Region | ||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
Southern Appalachian Watershed Resiliency Project EA |
- Wildlife, Fish, Rare plants - Vegetation management (other than forest products) - Watershed management - Road management - Projects that may affect Wilderness (for mailing list contacts) |
In Progress: Scoping Start 07/01/2024 Est. Comment Period Public Notice 11/2024 |
Expected:05/2025 |
06/2025 |
Jessie Howard 540-492-1728 jessie.howard@usda.gov |
Description: The Southern Appalachian Forests(Cherokee National Forest, George Washington and Jefferson National Forests, National Forests in North Carolina and Chattahoochee - Oconee National Forest seek to implement large landscape watershed resiliency efforts.
Web Link: https://www.fs.usda.gov/r08/cherokee/projects/66473 |
|||||
Location: UNIT - Cherokee National Forest All Units. STATE - Tennessee. COUNTY - Carter, Cocke, Greene, Johnson, McMinn, Monroe, Polk, Sullivan, Unicoi, Washington. LEGAL - Not Applicable. The entirety of the Cherokee National Forest. | |||||
Back To Top | |||||
Cherokee National Forest, Occurring in more than one District (excluding Forestwide) |
R8 - Southern Region | ||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
Red Spruce Restoration Project EA |
- Wildlife, Fish, Rare plants - Forest products - Vegetation management (other than forest products) - Watershed management - Road management - Projects that may affect Wilderness (for mailing list contacts) - Climate Change Adaptation - Carbon Stewardship |
In Progress: Scoping Start 08/06/2024 Est. Comment Period Public Notice 01/2025 |
Expected:07/2025 |
09/2025 |
Jessie Howard 540-492-1728 jessie.howard@usda.gov |
Description: The Cherokee National Forest, George Washington and Jefferson National Forests, Monongahela National Forest, and the National Forests in North Carolina seek to implement large landscape red spruce - fir ecosystem restoration.
Web Link: https://www.fs.usda.gov/r08/cherokee/projects/66547 |
|||||
Location: UNIT - Nolichucky Ranger District, Tellico Ranger District. STATE - Tennessee. COUNTY - Carter, Monroe, Unicoi. LEGAL - Not Applicable. High elevation red spruce-fir systems on the Cherokee National Forest. | |||||
Back To Top | |||||
Cherokee National Forest, Ocoee - Hiwassee Ranger District (excluding Projects occurring in more than one District) |
R8 - Southern Region | ||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
2025 RallyUSA Rally Car Race Project CE *NEW LISTING* |
- Special use management |
In Progress: Scoping Start 05/09/2025 |
Expected:06/2025 |
09/2025 |
Mary Vinson 423-338-3300 Mary.Vinson@usda.gov |
Description: Project is for a late summer 2025 rally car race and potential future rally car races through December 2030. A rally car race is a timed motorsport event where vehicles do not race side by side but are timed for overall time.
Web Link: http://www.fs.usda.gov/project/?project=68148 |
|||||
Location: UNIT - Ocoee - Hiwassee Ranger District. STATE - Tennessee. COUNTY - McMinn, Polk. LEGAL - Not Applicable. Project is located in multiple locations in Polk and McMinn Counties. | |||||
FY25 Prescribed Fire Project- Ocoee Ranger District CE *UPDATED* |
- Vegetation management (other than forest products) - Fuels management |
Completed | Actual: 04/04/2025 | 08/2025 |
Justin Feeman 423-397-8405 justin.feeman@usda.gov |
Description: The FY 2025 South Zone Prescribed Fire- Ocoee Ranger District Project would conduct prescribed fire on approximately 13,332 acres on 8 burn units on the Ocoee/Hiwassee Ranger District.
Web Link: https://www.fs.usda.gov/r08/cherokee/projects/66618 |
|||||
Location: UNIT - Ocoee - Hiwassee Ranger District. STATE - Tennessee. COUNTY - McMinn, Polk. LEGAL - Not Applicable. Project is located in multiple areas on the Ocoee Ranger District. See project maps for more detailed location information. | |||||
Ocoee Hiwassee Admin Site Area Release CE |
- Vegetation management (other than forest products) - Fuels management |
In Progress: Scoping Start 09/05/2019 |
Expected:11/2019 |
01/2020 |
Stephanie Medlin 423-476-9740 sm.fs.r8chertelcom@usda.gov |
Description: Treatments would include the severing of selected stems (chainsaw/manual), application of herbicide, and the use of prescribed fire within the designated unit (212 acres.
Web Link: https://www.fs.usda.gov/r08/cherokee/projects/archive/56628 |
|||||
Location: UNIT - Ocoee - Hiwassee Ranger District. STATE - Tennessee. COUNTY - Polk. LEGAL - Not Applicable. Around the Ocoee/Hiwassee District Office. | |||||
South Zone Trail Maintenance Project CE |
- Recreation management |
In Progress: Scoping Start 02/02/2022 |
Expected:03/2022 |
04/2022 |
Justin Feeman 423-397-8405 SM.FS.r8chertelcom@usda.gov |
Description: This project would allow routine maintenance on existing trails on the south zone of the Cherokee National Forest and minor reroutes where ground disturbance from natural events, such as tree windfall or landslide, are causing resource damage.
Web Link: https://www.fs.usda.gov/r08/cherokee/projects/61551 |
|||||
Location: UNIT - Ocoee - Hiwassee Ranger District. STATE - Tennessee. COUNTY - McMinn, Monroe, Polk. LEGAL - Not Applicable. Project includes all existing trails on the south zone of the Cherokee National Forest. | |||||
Starr Mountain Land Purchase CE |
- Land acquisition |
In Progress: Scoping Start 02/24/2022 |
Expected:03/2022 |
06/2022 |
Justin Feeman (423) 338-3300 SM.FS.r8cherococom@usda.gov |
Description: The project would acquire approximately 153 acres on Starr Mountain in McMinn County, TN. The parcel is adjacent to Gee Creek Wilderness and would be managed under the 7.B Scenic Corridor/Sensitive Viewsheds prescription.
Web Link: https://www.fs.usda.gov/r08/cherokee/projects/archive/61680 |
|||||
Location: UNIT - Ocoee - Hiwassee Ranger District. STATE - Tennessee. COUNTY - McMinn. LEGAL - Not Applicable. The project is located approximately 4 miles south of Etowah, TN. | |||||
Stephens Access Road CE |
- Special use management | On Hold | N/A | N/A |
Terinda Whisenant 423-338-3300 fs-comments-southern-cherokee-ocoee-hiwassee@fs.fed.us |
Description: Applicant has requested access across NFS lands to an inholding that is completely surrounded. An existing route at the end of NFSR 366C is in place but has grown up and is not drivable. Heavy equipment would be used to clear this 150 ft. | |||||
Location: UNIT - Ocoee - Hiwassee Ranger District. STATE - Tennessee. COUNTY - Polk. LEGAL - Not Applicable. East of Hwy 30 and North of Hwy 64 in the Vicinity of the 4-H camp. | |||||
Back To Top | |||||
Cherokee National Forest, Tellico Ranger District (excluding Projects occurring in more than one District) |
R8 - Southern Region | ||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
Caney Branch Prescribed Fire Interpretive Trail CE *NEW LISTING* |
- Recreation management | Completed | Actual: 05/14/2025 | 08/2025 |
Justin Feeman 423-397-8405 justin.feeman@usda.gov |
Description: The project would construct a 36-48 inch wide, 1.1-mile-long, native surface trail in the Buck Branch burn unit. The trail would include viewing areas, fire interpretive kiosks,native plantings, selective tree removal, and trail signs.
Web Link: https://www.fs.usda.gov/r08/cherokee/projects/67973 |
|||||
Location: UNIT - Tellico Ranger District. STATE - Tennessee. COUNTY - Monroe. LEGAL - Not Applicable. The project is located east of Tellico Plains, TN near the Tellico Ranger Station and the Caney Branch Overlook. | |||||
FY25 Citico Trail Management Project CE |
- Recreation management - Watershed management |
In Progress: Scoping Start 10/23/2024 |
Expected:12/2024 |
02/2025 |
Justin Feeman 423-397-8405 justin.feeman@usda.gov |
Description: The FY25 Citico Trail Management Project would conduct trail reconstruction, trail reroutes, trail closures, and complete trail removal/recontouring on Little Citico Horse Trails 3 and 4 and Tavern Branch Trail.
Web Link: https://www.fs.usda.gov/r08/cherokee/projects/67173 |
|||||
Location: UNIT - Tellico Ranger District. STATE - Tennessee. COUNTY - Monroe. LEGAL - Not Applicable. The project is located in east of Tellico Plains, TN in Monroe County. | |||||
Indian Boundary Recreation Area Administrative Site and Overflow Camping Area Project CE *UPDATED* |
- Recreation management | Completed | Actual: 05/14/2025 | 04/2026 |
Justin Feeman 423-397-8405 justin.feeman@usda.gov |
Description: The project would remove the current administration sites at the existing administration area, construct a new administration area, and construct defined camping sites in the overflow camping area.
Web Link: https://www.fs.usda.gov/r08/cherokee/projects/67528 |
|||||
Location: UNIT - Tellico Ranger District. STATE - Tennessee. COUNTY - Monroe. LEGAL - Not Applicable. The project is located approximately 16 miles east of Tellico Plains, TN. | |||||
K-1635 Sandy Branch Land Acquisition Project CE *NEW LISTING* |
- Land acquisition | Completed | Actual: 05/14/2025 | 06/2025 |
Justin Feeman 423-397-8405 justin.feeman@usda.gov |
Description: The project would acquire a parcel of land in Monroe County, TN that is approximately 341 acres. The parcel would be managed under the Prescription 9.H Management, Maintenance, and Restoration of Plant Associations to their Ecological Potential.
Web Link: https://www.fs.usda.gov/r08/cherokee/projects/67971 |
|||||
Location: UNIT - Tellico Ranger District. STATE - Tennessee. COUNTY - Monroe. LEGAL - Not Applicable. The project is located approximately 20 miles north of Tellico Plains, TN in Monroe County. | |||||
Panther Branch Bridge Replacement Project CE *NEW LISTING* |
- Facility management | Completed | Actual: 05/02/2025 | 06/2025 |
Jesse English 423-476-9748 jesse.r.english@usda.gov |
Description: The bridge would be replaced with a structure similar to the existing bridge, constructed within the Area of Potential Effect in the attached map. The existing bridge would be removed from the site and disposed of at a suitable location off forest.
Web Link: http://www.fs.usda.gov/project/?project=68112 |
|||||
Location: UNIT - Tellico Ranger District. STATE - Tennessee. COUNTY - Monroe. LEGAL - Not Applicable. Project is located east of Tellico Plains, TN on the Tellico River. | |||||
Restoration of Dry Forest Communities- Bell Mountain EA *UPDATED* |
- Wildlife, Fish, Rare plants - Forest products - Vegetation management (other than forest products) |
Completed | Actual: 06/30/2025 | 06/2025 |
Justin Feeman 423-397-8405 justin.feeman@usda.gov |
Description: The project would conduct forest restoration and improvement actions under the programmatic environmental assessment, Restoration of Dry Forest Communities. Additional actions in the project area would include road improvements and prescribed fire.
Web Link: https://www.fs.usda.gov/r08/cherokee/projects/66641 |
|||||
Location: UNIT - Tellico Ranger District. STATE - Tennessee. COUNTY - Monroe. LEGAL - Not Applicable. The project area is located north and east of Tellico Plains, TN in Monroe County. | |||||
Sugar Mountain Project EA *NEW LISTING* |
- Wildlife, Fish, Rare plants - Forest products - Vegetation management (other than forest products) |
In Progress: Scoping Start 06/16/2025 Est. Comment Period Public Notice 08/2025 |
Expected:12/2025 |
01/2026 |
Justin Feeman 423-397-8405 justin.feeman@usda.gov |
Description: The Sugar Mountain Project would utilize commercial timber harvest, wildlife opening enhancements, timber stand improvements, prescribed fire, and other associated actions to increase early successional habitat and improve forest health.
Web Link: http://www.fs.usda.gov/project/?project=68353 |
|||||
Location: UNIT - Tellico Ranger District. STATE - Tennessee. COUNTY - Monroe. LEGAL - Not Applicable. Project is located approximately 18 miles east of Tellico Plains, TN in Monroe County. | |||||
Tellico Hatchery Bridge Replacement Project CE *NEW LISTING* |
- Facility management | Completed | Actual: 04/02/2025 | 06/2025 |
Jesse English 423-476-9748 jesse.r.english@usda.gov |
Description: The bridge would be replaced with a structure similar to the existing bridge. The existing bridge would be removed from the site and disposed of at a suitable location off of the forest. The new bridge would be constructed in the disturbed area.
Web Link: https://www.fs.usda.gov/r08/cherokee/projects/67938 |
|||||
Location: UNIT - Tellico Ranger District. STATE - Tennessee. COUNTY - Monroe. LEGAL - Not Applicable. The project is located on Tellico River Road approximately 20 miles east of Tellico Plains, TN. | |||||
Back To Top | |||||
Cherokee National Forest, Unaka Ranger District (excluding Projects occurring in more than one District) |
R8 - Southern Region | ||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
Horse Creek Campground Improvement Project CE |
- Recreation management |
In Progress: Scoping Start 08/02/2024 |
Expected:01/2025 |
03/2025 |
Seong Hopkins 706-338-2935 seong.hopkins@usda.gov |
Description: The Forest Service have developed a proposal to make improvements to the campground and associated infrastructure at the Horse Creek Recreation Area. The reconfiguration would increase accessibility for recreational vehicle camping.
Web Link: https://www.fs.usda.gov/r08/cherokee/projects/66702 |
|||||
Location: UNIT - Unaka Ranger District. STATE - Tennessee. COUNTY - Greene. LEGAL - Not Applicable. The Horse Creek Recreation Area is located in Greene County, TN on the Unaka Ranger District of the Cherokee National Forest. | |||||
Iron Mountain Gap Appalachian National Scenic Trail Temporary Reroute Project CE |
- Recreation management |
In Progress: Scoping Start 01/08/2025 |
Expected:03/2025 |
04/2025 |
Seong Hopkins 423-638-4109 seong.hopkins@usda.gov |
Description: The Cherokee National Forest is proposing a temporary reroute of the Appalachian National Scenic Trail near Iron Mountain Gap due to impacts from Hurricane Helene. The reroute would last until projects that restore connectivity are complete.
Web Link: https://www.fs.usda.gov/r08/cherokee/projects/archive/67730 |
|||||
Location: UNIT - Unaka Ranger District. STATE - Tennessee. COUNTY - Unicoi. LEGAL - Not Applicable. This project would take place near Iron Mountain Gap on the Unaka Ranger District of the Cherokee National Forest in Unicoi County, Tennessee. | |||||
Margarette Falls Trail #189 - Relocation Project CE |
- Recreation management |
In Progress: Scoping Start 03/17/2023 |
Expected:04/2023 |
05/2023 |
Seong Hopkins 423-782-2400 seong.hopkins@usda.gov |
Description: This project is proposing to relocate approximately a 50 ft long section of trail #189. Waterbars would also be installed to limit stormwater runoff and continued damage to the trail.
Web Link: https://www.fs.usda.gov/r08/cherokee/projects/63721 |
|||||
Location: UNIT - Unaka Ranger District. STATE - Tennessee. COUNTY - Greene, Unicoi. LEGAL - Not Applicable. Margarette Falls Trail #189. | |||||
North Zone Large Tracts Amendment CE |
- Land management planning | On Hold | N/A | N/A |
Jonathan Lampley 423-783-2416 jonathan.lampley@usda.gov |
Description: The proposed forest plan amendment would address the need to assign management prescriptions to four tracts of land that were previously acquired.
Web Link: https://www.fs.usda.gov/r08/cherokee/projects/62033 |
|||||
Location: UNIT - Unaka Ranger District. STATE - Tennessee. COUNTY - Carter, Johnson, Unicoi, Washington. LEGAL - Not Applicable. North Zone Cherokee National Forest. | |||||
Temple Hill U-1638 Land Acquisition Project CE |
- Land acquisition |
In Progress: Scoping Start 12/04/2024 |
Expected:01/2025 |
01/2025 |
Jay Chapman 423-476-9782 jay.chapman@usda.gov |
Description: The Temple Hill U-1638 Land Acquisition Project would acquire approximately 65.5 acres of land near the Temple Hill Elementary School on Tipton Olsen Drive. The parcel would be managed under the 7.E Dispersed Recreation areas- Suitable.
Web Link: https://www.fs.usda.gov/r08/cherokee/projects/67354 |
|||||
Location: UNIT - Unaka Ranger District. STATE - Tennessee. COUNTY - Unicoi. LEGAL - Not Applicable. This project is on the Unaka Ranger District of the Cherokee National Forest. | |||||
Walnut Mountain Shelter Decommissioning Project CE |
- Recreation management |
In Progress: Scoping Start 08/12/2024 |
Expected:01/2025 |
03/2025 |
Seong Hopkins 706-338-2935 seong.hopkins@usda.gov |
Description: The Carolina Mountain Club have proposed to decommission and remove the Walnut Mountain shelter and associated infrastructure from national forest system lands.
Web Link: https://www.fs.usda.gov/r08/cherokee/projects/66731 |
|||||
Location: UNIT - Unaka Ranger District. STATE - Tennessee. COUNTY - Cocke. LEGAL - Not Applicable. The Walnut Mountain shelter is located on the Unaka Ranger District of the Cherokee National Forest in Cocke County, Tennessee. | |||||
Back To Top | |||||
Cherokee National Forest, Watauga Ranger District (excluding Projects occurring in more than one District) |
R8 - Southern Region | ||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
Dennis Cove U-1640 Land Acquisition Project CE |
- Land acquisition |
In Progress: Scoping Start 12/04/2024 |
Expected:01/2025 |
01/2025 |
Jay Chapman 423-476-9782 jay.chapman@usda.gov |
Description: The Dennis Cove U-1640 Land Acquisition Project would acquire approximately 129.5 acres of adjoining the Pond Mountain Wilderness. The parcel would be managed under the 4.A Appalachian Trail Corridor management prescription.
Web Link: https://www.fs.usda.gov/r08/cherokee/projects/archive/67369 |
|||||
Location: UNIT - Watauga Ranger District. STATE - Tennessee. COUNTY - Carter. LEGAL - Not Applicable. Project is located on Dennis Cove Road in Hampton, TN. | |||||
Pond Mountain Project EA |
- Wildlife, Fish, Rare plants - Forest products - Vegetation management (other than forest products) - Fuels management - Road management |
In Progress: Scoping Start 01/18/2023 Est. Comment Period Public Notice 05/2023 |
Expected:09/2023 |
01/2024 |
Jonathan Lampley 404-347-5264 jlampley@fs.fed.us |
Description: The project would provide early successional forest for wildlife, restore forest and wetland comm., release mast-producing trees, improve forest health, provide wildlife habitat components, and manage NFS system and non-system roads
Web Link: https://www.fs.usda.gov/r08/cherokee/projects/63431 |
|||||
Location: UNIT - Watauga Ranger District. STATE - Tennessee. COUNTY - Sullivan. LEGAL - Not Applicable. The project is located in Carter County, TN. The area is bounded by the Walnut Mountain Road on the eastern side, Laurel Fork Road on the Northern edge and the Appalachian Trail on the west and south. | |||||
Watauga Hazardous Fuels Reduction Project CE *NEW LISTING* |
- Vegetation management (other than forest products) - Fuels management |
Completed | Actual: 06/13/2025 | 06/2025 |
Terence Rose 575-885-7407 terence.j.rose@usda.gov |
Description: The Watauga Ranger District of the Cherokee National Forest is proposing a series of fuel reduction treatments within the wildland-urban interface to improve forest resiliency to wildfire post-Hurricane Helene.
Web Link: https://www.fs.usda.gov/r08/cherokee/projects/67960 |
|||||
Location: UNIT - Watauga Ranger District. STATE - Tennessee. COUNTY - Carter, Johnson, Sullivan, Unicoi. LEGAL - Not Applicable. Project units are located throughout the Watauga Ranger District within Johnson, Carter, Sullivan and Unicoi Counties. | |||||
White Rocks Horse Trail Connector Project CE |
- Recreation management |
In Progress: Scoping Start 08/21/2024 |
Expected:01/2025 |
04/2025 |
Chad Ingle 270-924-2028 chadwick.ingle@usda.gov |
Description: Backcountry Horsemen of East Tennessee have submitted a new proposal to build a connector trail between FSR303 and FSR530211 in Carter County, TN.
Web Link: https://www.fs.usda.gov/r08/cherokee/projects/66795 |
|||||
Location: UNIT - Watauga Ranger District. STATE - Tennessee. COUNTY - Carter. LEGAL - Not Applicable. This project is located in the White Rocks/Walnut Mountain area of the Watauga Ranger District. | |||||
In accordance with Federal civil rights law and U.S. Department of Agriculture (USDA) civil rights regulations and policies, the USDA, its Agencies, offices, and employees, and institutions participating in or administering USDA programs are prohibited from discriminating based on race, color, national origin, religion, sex, gender identity (including gender expression), sexual orientation, disability, age, marital status, family/parental status, income derived from a public assistance program, political beliefs, or reprisal or retaliation for prior civil rights activity, in any program or activity conducted or funded by USDA (not all bases apply to all programs). Remedies and complaint filing deadlines vary by program or incident.
Persons with disabilities who require alternative means of communication for program information (e.g., Braille, large print, audiotape, American Sign Language, etc.) should contact the responsible Agency or USDA’s TARGET Center at (202) 720-2600 (voice and TTY) or contact USDA through the Federal Relay Service at (800) 877-8339. Additionally, program information may be made available in languages other than English. To file a program discrimination complaint, complete the USDA Program Discrimination Complaint Form, AD-3027, found online at http://www.ascr.usda.gov/complaint_filing_cust.html and at any USDA office or write a letter addressed to USDA and provide in the letter all of the information requested in the form. To request a copy of the complaint form, call (866) 632-9992. Submit your completed form or letter to USDA by: (1) mail: U.S. Department of Agriculture Office of the Assistant Secretary for Civil Rights 1400 Independence Avenue, SW Washington, D.C. 20250-9410; (2) fax: (202) 690-7442; or (3) email: program.intake@usda.gov. USDA is an equal opportunity provider, employer, and lender. |