Schedule of Proposed Actions (SOPA) |
|||||
This report contains the best available information at the time of publication. Questions may be directed to the Project Contact. | |||||
Report Contents (click to jump to a section) : - Projects Occurring Nationwide - R9 - Eastern Region, Chippewa National Forest, Forestwide (excluding Projects occurring in more than one Forest) - R9 - Eastern Region, Chippewa National Forest, Occurring in more than one District (excluding Forestwide) - R9 - Eastern Region, Chippewa National Forest, Blackduck Ranger District (excluding Projects occurring in more than one District) - R9 - Eastern Region, Chippewa National Forest, Deer River Ranger District (excluding Projects occurring in more than one District) - R9 - Eastern Region, Chippewa National Forest, Walker Ranger District (excluding Projects occurring in more than one District) | |||||
Projects Occurring Nationwide |
|||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
---|---|---|---|---|---|
Land Management Plan Direction for Old-Growth Forest Conditions Across the National Forest System EIS *UPDATED* |
- Land management planning |
In Progress: DEIS NOA in Federal Register 06/21/2024 Est. FEIS NOA in Federal Register 12/2024 |
Expected:01/2025 |
01/2025 |
Jennifer McRae 202-791-8488 SM.FS.NFSWONGA@usda.gov |
Description: Amend all land management plans for units of the National Forest System to include consistent direction to conserve and steward existing and recruit future old-growth forest conditions and to monitor their condition across planning areas of NFS.
Web Link: http://www.fs.usda.gov/project/?project=65356 |
|||||
Location: UNIT - All Districts-level Units. STATE - All States. COUNTY - All Counties. LEGAL - Not Applicable. National Forests and Grasslands (128 units). | |||||
Locatable Mining Rule - 36 CFR 228, subpart A. EIS |
- Regulations, Directives, Orders | On Hold | N/A | N/A |
Sarah Shoemaker 907-586-7886 sarahshoemaker@fs.fed.us |
Description: The U.S. Department of Agriculture proposes revisions to its regulations at 36 CFR 228, Subpart A governing locatable minerals operations on National Forest System lands.A draft EIS & proposed rule should be available for review/comment in late 2020
Web Link: http://www.fs.usda.gov/project/?project=57214 |
|||||
Location: UNIT - All Districts-level Units. STATE - All States. COUNTY - All Counties. LEGAL - Not Applicable. These regulations apply to all NFS lands open to mineral entry under the US mining laws. More Information is available at: https://www.fs.usda.gov/science-technology/geology/minerals/locatable-minerals/current-revisions. | |||||
Back To Top | |||||
Chippewa National Forest, Forestwide (excluding Projects occurring in more than one Forest) |
R9 - Eastern Region | ||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
Fire-dependent Ecosystem Restoration Project EA |
- Wildlife, Fish, Rare plants - Vegetation management (other than forest products) |
Developing Proposal Est. Scoping Start 09/2022 |
Expected:09/2023 | 04/2024 |
Mike Rice 218-547-1044 michael.rice@usda.gov |
Description: The use of prescribed fire and associated mechanical treatments to restore fire-dependent ecosystems and wildlife habitats on national forest system lands within the proclamation boundary of the Leech Lake Band of Ojibwe Indian Reservation.
Web Link: http://www.fs.usda.gov/project/?project=59126 |
|||||
Location: UNIT - Chippewa National Forest All Units. STATE - Minnesota. COUNTY - Beltrami, Cass, Itasca. LEGAL - Not Applicable. Approximately 150,000 acres of fire-dependent ecosystems on national forest system lands that are completely within the proclamation boundary of the Leech Lake Band of Ojibwe Indian Reservation. | |||||
Leech Lake Band of Ojibwe Reservation Restoration Act: Land Transfer Project CE |
- Land ownership management |
In Progress: Scoping Start 08/11/2023 |
Expected:11/2023 |
12/2023 |
Michael Stearly 218-335-8600 michael.stearly@usda.gov |
Description: The purpose of this project is to implement the direction established by the Leech Lake Band of Ojibwe Reservation Restoration Act. In the Act, Congress transfers approximately 11,760 acres of federal land to be held in trust by the BIA
Web Link: http://www.fs.usda.gov/project/?project=64623 |
|||||
Location: UNIT - Chippewa National Forest All Units. STATE - Minnesota. COUNTY - Cass. LEGAL - Not Applicable. Proposed transfer land parcels are located within the boundary of the Leech Lake Band of Ojibwe Reservation and within Cass County, MN. | |||||
Rare Plant Population Augmentation Project CE |
- Wildlife, Fish, Rare plants |
In Progress: Scoping Start 09/08/2023 |
Expected:10/2023 |
10/2023 |
Justin Tufts 218-355-8600 justin.tufts@usda.gov |
Description: Seed collection, propagation, and out-planting of rare plants within existing populations.
Web Link: http://www.fs.usda.gov/project/?project=64807 |
|||||
Location: UNIT - Chippewa National Forest All Units. STATE - Minnesota. COUNTY - Beltrami, Cass, Itasca. LEGAL - Not Applicable. Within 250 feet of existing rare plant populations as recorded in the Forest Service Natural Resource Manager (NRM) Threatened, Endangered, and Sensitive Species (TESP) database. | |||||
Rare Plant Population Augmentation Project CE |
- Wildlife, Fish, Rare plants |
In Progress: Scoping Start 09/12/2023 |
Expected:09/2023 |
10/2023 |
Justin Tufts 218-335-8600 justin.tufts@usda.gov |
Description: Seed collection, propagation, and out-planting of rare plants within existing populations. | |||||
Location: UNIT - Chippewa National Forest All Units. STATE - Minnesota. COUNTY - Beltrami, Cass, Itasca. LEGAL - Not Applicable. Within 250 feet of existing rare plant populations as recorded in the Forest Service Natural Resource Manager (NRM) Threatened, Endangered, and Sensitive Species (TESP) database. A shapefile is provided. | |||||
Back To Top | |||||
Chippewa National Forest, Occurring in more than one District (excluding Forestwide) |
R9 - Eastern Region | ||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
Winnie Sand Resource Management EA *UPDATED* |
- Recreation management - Wildlife, Fish, Rare plants - Forest products - Vegetation management (other than forest products) - Fuels management - Watershed management - Road management |
In Progress: Comment Period Public Notice 05/12/2024 |
Expected:10/2024 |
11/2024 |
Samuel Ainsley 218-246-2362 samuel.ainsley@usda.gov |
Description: This project will include vegetation management. The project is within the exterior boundary of the Leech Lake Band of Ojibwe reservation boundary.
Web Link: http://www.fs.usda.gov/project/?project=57340 |
|||||
Location: UNIT - Blackduck Ranger District, Deer River Ranger District. STATE - Minnesota. COUNTY - Itasca. LEGAL - Section within the following townships T146N/R26W, R27W; T147N/R26W, R27W; T148N/R26W, R27W, T28W; T149N/R26W,R27W;T150N/R27W, R28W. The project extends from the eastern side of the north shore of Lake Winnibigoshish and on up north in a narrow strip to the Forest boarder. | |||||
Back To Top | |||||
Chippewa National Forest, Blackduck Ranger District (excluding Projects occurring in more than one District) |
R9 - Eastern Region | ||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
Blackduck Oak Habitat Improvement Project CE |
- Wildlife, Fish, Rare plants |
Developing Proposal Est. Scoping Start 05/2023 |
Expected:07/2023 | 10/2023 |
Cory Mlodik 307-276-5808 cory.mlodik@usda.gov |
Description: Remove stems from multi-stemmed oaks by hand using a brush saw, chainsaw, or similar equipment. In stands where oak stump sprouts are competing with other deciduous trees, the competing saplings would also be cut to release the oak.
Web Link: http://www.fs.usda.gov/project/?project=64012 |
|||||
Location: UNIT - Blackduck Ranger District. STATE - Minnesota. COUNTY - Beltrami, Cass, Itasca. LEGAL - Not Applicable. T145N, R29-31W; T146N, R28-31W; T147N, R28-31W; T148N, R28-31W; T149N, R26-31W; T150N, R26-28W. | |||||
FR3334 Road Permit CE |
- Special use management |
In Progress: Scoping Start 05/09/2022 |
Expected:06/2022 |
06/2022 |
Ashley May klick 218-246-2124 ashley.n.may-klick@usda.gov |
Description: Issuing a special use road permit for construction, access, and maintenance of FR3334. Proposed road would cover approximately 1.3 acres.
Web Link: http://www.fs.usda.gov/project/?project=62177 |
|||||
Location: UNIT - Blackduck Ranger District. STATE - Minnesota. COUNTY - Itasca. LEGAL - T150N, R26W, Sec 9. East of Island Lake. | |||||
Lady Slipper Scenic Highway Interpretive Trail CE |
- Recreation management |
In Progress: Scoping Start 12/18/2023 |
Expected:01/2024 |
10/2024 |
Cole Van Beusekom 218-835-3113 Cole.VanBeusekom@usda.gov |
Description: .25-mile interpretive trail. The trails width of approximately 8ft would involve clearing brush and small trees. portions of the trail will be widened for Interpretive displays. Project will avoid sensitive areas involving Lady Slippers, or other spe
Web Link: http://www.fs.usda.gov/project/?project=65370 |
|||||
Location: UNIT - Blackduck Ranger District. STATE - Minnesota. COUNTY - Cass. LEGAL - T146, R30W, Section 15. T146, R30W, Section 15. | |||||
Noma Lake Tract Lot 4 Roof Replacement CE |
- Special use management |
Developing Proposal Est. Scoping Start 05/2023 |
Expected:06/2023 | 07/2023 |
Shelby Worel 218-407-5567 shelby.worel@usda.gov |
Description: New Roof on cabin, staining siding and painting trim | |||||
Location: UNIT - Blackduck Ranger District. STATE - Minnesota. COUNTY - Itasca. LEGAL - T149N, R26W, Sec 3. North Side of Noma Lake. | |||||
Norway Beach Resort Shoreline Stabilization CE |
- Watershed management | On Hold | N/A | N/A |
Christopher Worthington 218-335-8643 christopher.worthington@usda.gov |
Description: The project includes construction of 244 feet of rock riprap shoreline protection at the Norway Beach Resort along the shoreline of Cass Lake. The project is within the LLBO
Web Link: http://www.fs.usda.gov/project/?project=59167 |
|||||
Location: UNIT - Blackduck Ranger District. STATE - Minnesota. COUNTY - Cass. LEGAL - Not Applicable. The project site is in Cass County Minnesota; T145N, R30W, S8 at the Norway Beach Resort on FR2007AA. The nearest town is Cass Lake, MN. | |||||
Norway Bluff Lot 17- Staircase rebuild and shoreline stabilization CE *UPDATED* |
- Special use management | Completed | Actual: 02/28/2024 | 04/2024 |
Shelby Worel 218-407-5567 shelby.worel@usda.gov |
Description: Rebuilding stairway down to the lake and adding rock to the shoreline.
Web Link: http://www.fs.usda.gov/project/?project=65020 |
|||||
Location: UNIT - Blackduck Ranger District. STATE - Minnesota. COUNTY - Beltrami. LEGAL - T146N, R31W, Section 35. South west side of Star Island. | |||||
Norway Bluff Lot 2 Foundation and Roof Repair CE |
- Special use management |
In Progress: Scoping Start 08/21/2023 |
Expected:10/2023 |
12/2023 |
Ashley May klick 218-246-2124 ashley.n.may-klick@usda.gov |
Description: Foundation Repair and roof replacement
Web Link: http://www.fs.usda.gov/project/?project=64691 |
|||||
Location: UNIT - Blackduck Ranger District. STATE - Minnesota. COUNTY - Beltrami. LEGAL - T146N, R31W, Section 35. Located on the west side of Star Island. | |||||
Road Permit 2377 Forest Road - Ambrose CE |
- Special use management |
In Progress: Scoping Start 02/28/2024 |
Expected:04/2024 |
05/2024 |
Shelby Worel 218-407-5567 shelby.worel@usda.gov |
Description: Reissuing a road permit on an existing road to new permittees.
Web Link: http://www.fs.usda.gov/project/?project=65726 |
|||||
Location: UNIT - Blackduck Ranger District. STATE - Minnesota. COUNTY - Itasca. LEGAL - T. 58N, R.26W, Section 10. Southwest of Caribou Lake. | |||||
Timber Sale Access for 23-06-11 CE *NEW LISTING* |
- Special use management |
In Progress: Scoping Start 05/15/2024 |
Expected:05/2024 |
12/2024 |
Zachary Mclellan 218-335-8664 zachary.mclellan@usda.gov |
Description: wo temporary roads have been requested to access timber sale off of Forest Road 3312E . Approximate road locations are
depicted in the resource review form along with KML attached in folder.
Web Link: http://www.fs.usda.gov/project/?project=66249 |
|||||
Location: UNIT - Blackduck Ranger District. STATE - Minnesota. COUNTY - Itasca. LEGAL - T149N R28W Sec 3. Tassel Rd. | |||||
Back To Top | |||||
Chippewa National Forest, Deer River Ranger District (excluding Projects occurring in more than one District) |
R9 - Eastern Region | ||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
Cut Foot Sioux Inn Resort cabin 1 remodel and open-air pavilion CE |
- Special use management |
In Progress: Scoping Start 12/15/2023 |
Expected:05/2024 |
05/2024 |
Todd Armbruster 218-246-2124 Todd.Armbruster@usda.gov |
Description: Remodel cabin 1 with new siding, windows, deck and roof to match the other cabins on the resort. Reconfigure resort playground area by repositioning it and building a 20'x24' open-air pavilion with concrete floor.
Web Link: http://www.fs.usda.gov/project/?project=65373 |
|||||
Location: UNIT - Deer River Ranger District. STATE - Minnesota. COUNTY - Itasca. LEGAL - T147N, R27W, Section 25. On Reservation. East side of Highway 46, just south of Little Cut Foot Sioux Lake, 44394 State Hwy 46, Deer River Lat/Long (-94.044, 47.515). | |||||
Cut Foot Sioux Inn Resort cabin 1 remodel and open-air pavilion CE |
- Special use management |
In Progress: Scoping Start 12/15/2023 |
Expected:05/2024 |
05/2024 |
Todd Armbruster 218-246-2124 Todd.Armbruster@usda.gov |
Description: Remodel cabin 1 with new siding, windows, deck and roof to match the other cabins on the resort. Reconfigure resort playground area by repositioning it and building a 20'x24' open-air pavilion with concrete floor.
Web Link: http://www.fs.usda.gov/project/?project=65372 |
|||||
Location: UNIT - Deer River Ranger District. STATE - Minnesota. COUNTY - Itasca. LEGAL - T147N, R27W, Section 25. On Reservation. East side of Highway 46, just south of Little Cut Foot Sioux Lake, 44394 State Hwy 46, Deer River Lat/Long (-94.044, 47.515). | |||||
Eagle Nest Lodge Cabins 8, 9, and 10 Maintenance CE |
- Special use management |
In Progress: Scoping Start 09/29/2023 |
Expected:10/2023 |
11/2023 |
Todd Armbruster 218-246-2124 Todd.Armbruster@usda.gov |
Description: Replace 14 old windows in Cabins 8, 9, and 10 and reside all of Cabin 10 and all but the lakeside of Cabin 9 with 2x8 full log siding.
Web Link: http://www.fs.usda.gov/project/?project=64953 |
|||||
Location: UNIT - Deer River Ranger District. STATE - Minnesota. COUNTY - Itasca. LEGAL - T147N, R27W, Section 22. North side of Cutfoot Sioux Lake in East Seelye Bay, 58671 Eagle Nest Road. -94.087, 47.527 degrees. | |||||
Eagle Nest Lodge cabin #4 replacement and waterline replacement CE |
- Special use management |
In Progress: Scoping Start 08/18/2023 |
Expected:05/2024 |
06/2024 |
Todd Armbruster 218-246-2124 Todd.Armbruster@usda.gov |
Description: Cabin #4 replacement and waterline replacement. | |||||
Location: UNIT - Deer River Ranger District. STATE - Minnesota. COUNTY - Itasca. LEGAL - T147N, R27W, Section 22. North side of Cutfoot Sioux Lake in East Seelye Bay, 58671 Eagle Nest Road. -94.087, 47.527 degrees. | |||||
Enbridge Line 4 Leak Detection Sensor Install CE |
- Special use management |
In Progress: Scoping Start 03/04/2024 |
Expected:06/2024 |
07/2024 |
Joshua Krecklau 218-547-1044 Joshua.Krecklau@usda.gov |
Description: Enbridge would like to install additional leak detection sensors around the Line 4 (48in) valve site at mile post (MP) 986.44 (Lat: 47.322125, Long: -93.964499).
Web Link: http://www.fs.usda.gov/project/?project=65753 |
|||||
Location: UNIT - Deer River Ranger District. STATE - Minnesota. COUNTY - Cass. LEGAL - T144N, R26W, Sec. 4. West of Deer River off Hwy 2. | |||||
Goose Lake Pit Establishment CE *NEW LISTING* |
- Minerals and Geology - Special use management |
In Progress: Scoping Start 06/28/2024 |
Expected:08/2024 |
09/2024 |
Trapper Marshall 218-335-8657 Trapper.Marshall@usda.gov |
Description: Establishment of Goose Lake gravel pit near Mud/Goose Lake south of Ball Club Mn. Not on LLBO Reservation
Web Link: http://www.fs.usda.gov/project/?project=66492 |
|||||
Location: UNIT - Deer River Ranger District. STATE - Minnesota. COUNTY - Cass. LEGAL - SW 1/4 NW 1/4 S6, T143, R25N. From Ball Club Mn, Travel south on County Road 18 for 5.25 Miles. Where County Road 18 turns east, continue south on 72nd Ave. Travel south on 72nd Ave for 1.6 miles. Turn east on to FS2329 and travel for approximately1/4 mile ending at project site. | |||||
Great Rive Energy Soil Boring CE *NEW LISTING* |
- Special use management |
In Progress: Scoping Start 05/14/2024 |
Expected:08/2024 |
08/2024 |
Joshua Krecklau 218-547-1044 Joshua.Krecklau@usda.gov |
Description: geo-technical soil boring at 4 locations which will temporarily use 10,000 sq ft of land within existing utility corridors. 3" diameter and up to 50' down for boring holes. No waste material left on site. Holes backfilled with native soil.
Web Link: http://www.fs.usda.gov/project/?project=66237 |
|||||
Location: UNIT - Deer River Ranger District. STATE - Minnesota. COUNTY - Itasca. LEGAL - T147N, R25W, Sec. 12 & 24 and T146N, R25W Sec. 3. West of Deer River off Hwy 2. | |||||
Klarich Road Permit Reissue CE |
- Special use management |
Developing Proposal Est. Scoping Start 10/2022 |
Expected:11/2022 | 11/2022 |
Ashley May klick 218-229-8807 ashley.n.may-klick@usda.gov |
Description: Reissue a road permit to new private landowners. | |||||
Location: UNIT - Deer River Ranger District. STATE - Minnesota. COUNTY - Itasca. LEGAL - T147N, R25W, Sec. 34. Southeast of Bowstring Lake. | |||||
Lake Country Power Amendment 1 Bena CE *UPDATED* |
- Special use management | Completed | Actual: 05/22/2024 | 05/2025 |
Joshua Krecklau 218-547-1044 Joshua.Krecklau@usda.gov |
Description: Installation and maintenance of 1,625%u2019 of line to be installed using a directional bore. Trees will be cleared around the bore pit area where the cable will start and stop. Within reservation.
Web Link: http://www.fs.usda.gov/project/?project=65702 |
|||||
Location: UNIT - Deer River Ranger District. STATE - Minnesota. COUNTY - Cass. LEGAL - T145N, R28W, Sec. 25 and 26. Bena area. | |||||
Little Cut Foot Sioux Lot 5 Roof Repair CE |
- Special use management |
Developing Proposal Est. Scoping Start 08/2022 |
Expected:10/2022 | 10/2022 |
Joshua Krecklau 218-547-1044 Joshua.Krecklau@usda.gov |
Description: Replacement of roofing on cabin and garage. On Reservation.
Web Link: http://www.fs.usda.gov/project/?project=62635 |
|||||
Location: UNIT - Deer River Ranger District. STATE - Minnesota. COUNTY - Itasca. LEGAL - T147N, R27W, Section 36. Little Cut Foot Sioux Recreation Residence Tract, Lot 5. | |||||
North Country Trail Highway 6 Reroute CE *NEW LISTING* |
- Recreation management |
Developing Proposal Est. Scoping Start 09/2024 |
Expected:01/2025 | 06/2025 |
Scott Shipley 218-475-5109 scott.shipley@usda.gov |
Description: The trail reroute section is 10 miles. Decommission old NCT segments. Constructing two parking areas and two dispersed campsites, which will include fire grates, wilderness latrines, and tent pads.
Web Link: http://www.fs.usda.gov/project/?project=66429 |
|||||
Location: UNIT - Deer River Ranger District. STATE - Minnesota. COUNTY - Cass. LEGAL - West termini T 142N, R 25W, section 21. East termini T 143N, R 25W, section 25. The approximate location starts where the current NCT intersects State Highway 6, follows along State Highway 6, and ends at the forest boundary just north of Willow Lake. | |||||
People's - Amendment 13 Marcell CE |
- Special use management |
In Progress: Scoping Start 08/15/2023 |
Expected:10/2023 |
06/2024 |
Ashley May klick 218-246-2124 ashley.n.may-klick@usda.gov |
Description: Installation and maintenance of 97,838 feet of lie using a vibratory plow or directional bore under road and water ways. Much of the line is existing and is planned to be upgraded. Construction planned in 2024.
Web Link: http://www.fs.usda.gov/project/?project=64652 |
|||||
Location: UNIT - Deer River Ranger District. STATE - Minnesota. COUNTY - Itasca. LEGAL - Not Applicable. Marcell area. Outside of LLBO Reservation. | |||||
People's - Amendment 14 CE |
- Special use management |
In Progress: Scoping Start 08/15/2023 |
Expected:09/2024 |
09/2024 |
Ashley May klick 218-246-2124 ashley.n.may-klick@usda.gov |
Description: Installation and maintenance of 9,756 feet of line to be installed using a vibratory plow or directional bore under roadways and water ways.
Web Link: http://www.fs.usda.gov/project/?project=65667 |
|||||
Location: UNIT - Deer River Ranger District. STATE - Minnesota. COUNTY - Itasca. LEGAL - T148N, R25W. T59N, R26W. Marcell area. | |||||
Peoples Telephone Arvig - Amendment 15 Bigfork CE *NEW LISTING* |
- Special use management |
In Progress: Scoping Start 03/25/2024 |
Expected:09/2024 |
09/2024 |
Ashley May klick 218-246-2124 ashley.n.may-klick@usda.gov |
Description: Installation and maintenance of 18,226 feet of line to be installed using a vibratory plow or directional bore under roadways and water ways.
Web Link: http://www.fs.usda.gov/project/?project=65991 |
|||||
Location: UNIT - Deer River Ranger District. STATE - Minnesota. COUNTY - Itasca. LEGAL - T149N, R25W, Sec. 7, 8, 10, 11, 15, 17, & 21, T60N, R26W, Sec. 31 and T59N, R25W, Sec. 6. Bigfork area. | |||||
Road Permit 2377 Forest Road - Ambrose CE *NEW LISTING* |
- Special use management | Completed | Actual: 04/29/2024 | 05/2024 |
Shelby Worel 218-407-5567 shelby.worel@usda.gov |
Description: Reissuing a road permit on an existing road to new permittees. | |||||
Location: UNIT - Deer River Ranger District. STATE - Minnesota. COUNTY - Itasca. LEGAL - T. 58N, R.26W, Section 10. Southwest of Caribou Lake. | |||||
South Highbanks Lot 11 Septic System CE *NEW LISTING* |
- Special use management | Completed | Actual: 06/10/2024 | 07/2024 |
Todd Armbruster 218-246-2124 Todd.Armbruster@usda.gov |
Description: Replace failing septic system as part of requirements for cabin sale. New system will be placed where the existing system is located. Within LLBO reservation.
Web Link: http://www.fs.usda.gov/project/?project=66228 |
|||||
Location: UNIT - Deer River Ranger District. STATE - Minnesota. COUNTY - Itasca. LEGAL - T146N, R27W, Section 31. East shore of Lake Winnibigoshish approximately 2.5 miles south/southwest of Tamarack Point, 17081 South Highbanks Road NE. -94.145, 47.419 degrees. | |||||
South Highbanks Lot 11 Staircase Replacement CE |
- Special use management |
Developing Proposal Est. Scoping Start 12/2023 |
Expected:02/2024 | 05/2024 |
Todd Armbruster 218-246-2124 Todd.Armbruster@usda.gov |
Description: After the fact staircase installation to lakeshore at recreation residence cabin and removal of old staircase
Web Link: http://www.fs.usda.gov/project/?project=65284 |
|||||
Location: UNIT - Deer River Ranger District. STATE - Minnesota. COUNTY - Itasca. LEGAL - T146N, R27W, Section 31. East shore of Lake Winnibigoshish approximately 2.5 miles south/southwest of Tamarack Point, 17081 South Highbanks Road NE. -94.145, 47.419 degrees. | |||||
Winnie Dam Lot 5 Driveway Graveling CE |
- Special use management |
Developing Proposal Est. Scoping Start 09/2022 |
Expected:10/2022 | 10/2022 |
Joshua Krecklau 218-547-1044 Joshua.Krecklau@usda.gov |
Description: Addition of gravel to existing driveway
Web Link: http://www.fs.usda.gov/project/?project=62634 |
|||||
Location: UNIT - Deer River Ranger District. STATE - Minnesota. COUNTY - Itasca. LEGAL - T147N, R27W, Section 25. T147N, R27W, Section 25. | |||||
Winnie Dam Lot 8 Well and Waterline CE *NEW LISTING* |
- Special use management |
In Progress: Scoping Start 06/04/2024 |
Expected:09/2024 |
09/2024 |
Todd Armbruster 218-246-2124 Todd.Armbruster@usda.gov |
Description: Drill new well with yard spigot, remove existing well, and trench new waterline to cabin.
Web Link: http://www.fs.usda.gov/project/?project=66355 |
|||||
Location: UNIT - Deer River Ranger District. STATE - Minnesota. COUNTY - Itasca. LEGAL - T146N, R27W, Section 24. East shore of Lake Winnibigoshish. Directly south of winter lake access point, 39039 Plughat Point Rd, -94.054, 47.441 degrees. Within LLBO reservation. | |||||
Back To Top | |||||
Chippewa National Forest, Walker Ranger District (excluding Projects occurring in more than one District) |
R9 - Eastern Region | ||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
Big Rice Lake EAB Bundle 2024 CE *UPDATED* |
- Forest products - Vegetation management (other than forest products) |
Completed | Actual: 05/21/2024 | 06/2024 |
Douglas Putt 2185070960 Douglas.Putt@usda.gov |
Description: In response to EAB being detected at Big Rice Lake we are proposing a project that would include up to 250 acres of salvage harvests, up to 250 acres of sanitation harvests, planting of native species, and the release of parasidtoids.
Web Link: http://www.fs.usda.gov/project/?project=65481 |
|||||
Location: UNIT - Walker Ranger District. STATE - Minnesota. COUNTY - Cass. LEGAL - T141N R26W Sec 22 & 27. East side of Big Rice Lake. | |||||
East Ottertail Amend. 10 CE *NEW LISTING* |
- Special use management | Completed | Actual: 04/29/2024 | 06/2024 |
Joshua Krecklau 218-547-1044 Joshua.Krecklau@usda.gov |
Description: Installation and maintenance of 15,556 feet of fiber optic cable and pedestals using a vibratory plow or directional bore under roadways and water ways. Much of the line listed is existing and is planned to be upgraded to better meet the demands.
Web Link: http://www.fs.usda.gov/project/?project=66033 |
|||||
Location: UNIT - Walker Ranger District. STATE - Minnesota. COUNTY - Cass. LEGAL - T141N, R28W, Sec. 20, 29, 32, and 33, T142N, R28W, Sec. 27, 28, 29, and 34. Longville. | |||||
East Ottertail- Amendment 6 Longville CE |
- Special use management |
In Progress: Scoping Start 09/29/2023 |
Expected:12/2023 |
06/2024 |
Ashley May klick 218-246-2124 ashley.n.may-klick@usda.gov |
Description: Installation and maintenance of 53,211 ft of line to be installed using a vibratory plow or directional bore under roadways and water ways. Much of the line is existing and is to be upgraded to better meet demands. partly within reservation.
Web Link: http://www.fs.usda.gov/project/?project=64621 |
|||||
Location: UNIT - Walker Ranger District. STATE - Minnesota. COUNTY - Cass. LEGAL - Not Applicable. Longville Area. | |||||
East Ottertail- Amendment 7 Whipholt CE *UPDATED* |
- Special use management | Completed | Actual: 02/22/2024 | 06/2024 |
Ashley May klick 218-246-2124 ashley.n.may-klick@usda.gov |
Description: Installation and maintenance of 46,758 ft of line to be installed using a vibratory plow or directional bore under roadways and water ways. Much of the line is existing and is to be upgraded to meet demands. Partly within reservation.
Web Link: http://www.fs.usda.gov/project/?project=64622 |
|||||
Location: UNIT - Walker Ranger District. STATE - Minnesota. COUNTY - Cass. LEGAL - Not Applicable. Whipholt Area. | |||||
Harbor Dredging at Stony Point, Big Rock Lot 6 CE *NEW LISTING* |
- Special use management |
In Progress: Scoping Start 04/10/2024 |
Expected:09/2024 |
09/2024 |
Joshua Krecklau 218-547-1044 Joshua.Krecklau@usda.gov |
Description: Dredge the small harbor on Lot 6 of Big Rock recreation residence tract and deposit dredge material on FS land
Web Link: http://www.fs.usda.gov/project/?project=66034 |
|||||
Location: UNIT - Walker Ranger District. STATE - Minnesota. COUNTY - Cass. LEGAL - Not Applicable. Stony Point. | |||||
Harbor Dredging of Stony Point CE *UPDATED* |
- Special use management | Completed | Actual: 11/08/2023 | 12/2023 |
Shelby Worel 218-407-5567 shelby.worel@usda.gov |
Description: Dredge the Harbor and deposit dredge material on FS land. The deposit location for the dredging material is the same as a previous dredging project
Web Link: http://www.fs.usda.gov/project/?project=65154 |
|||||
Location: UNIT - Walker Ranger District. STATE - Minnesota. COUNTY - Cass. LEGAL - T142N, R30W, Section 10. Stony Point on Leech Lake. | |||||
Headquarters Bay Ricing Access FR 3110 CE *NEW LISTING* |
- Road management |
In Progress: Scoping Start 04/26/2024 |
Expected:05/2024 |
06/2024 |
Audrey Mays 218-547-5120 audrey.mays@usda.gov |
Description: Maintenance of FR3110 and the construction of four passing lanes and a turn around to increase accessibility to HQ Bay.
Web Link: http://www.fs.usda.gov/project/?project=66137 |
|||||
Location: UNIT - Walker Ranger District. STATE - Minnesota. COUNTY - Cass. LEGAL - Not Applicable. Near HQ Bay of Leech Lake. | |||||
Stony Point Campground Improvements CE |
- Recreation management - Facility management |
In Progress: Scoping Start 04/12/2022 |
Expected:05/2022 |
06/2022 |
Nicholas Edington 209-965-3434 x5125 nicholas.edington@usda.gov |
Description: replace large lighted fee board, restroom interior remodel, septic lift station replacement, well house replacement, septic system upgrade, RV dump station upgrades removal of sewer lagoon remnants, and campsite electric pedestal upgrade to 50 amp.
Web Link: http://www.fs.usda.gov/project/?project=61990 |
|||||
Location: UNIT - Walker Ranger District. STATE - Minnesota. COUNTY - Cass. LEGAL - T142N, R30W, S3/10. Campground is located on Leech Lake at the end of Stony Point Camp Road off of Onigum Road. | |||||
Walker Campground Bundle 2024 CE |
- Recreation management |
In Progress: Scoping Start 12/07/2023 |
Expected:01/2024 |
04/2024 |
David Johnson 218-547-5108 david.e.johnson3@usda.gov |
Description: Campground maintenance at South Pike, Stony Point and Mabel Lake consisting of campsite spur maintenance, gate removal and replacement and stump grinding. South Pike Day use site will have the vault toilet replaced.
Web Link: http://www.fs.usda.gov/project/?project=65309 |
|||||
Location: UNIT - Walker Ranger District. STATE - Minnesota. COUNTY - Cass. LEGAL - Mabel Lake: Township: 141, Range: 27, Section: 10-Stony Point: Township: 142, Range: 30, Section: 10 South Pike Bay: Township: 145, Range: 31, Section: 35. Mabel Lake Campground, South Pike Bay Campground, Stony Point Campground. | |||||
West Pike Bay Lot 3 Septic Replacement CE *NEW LISTING* |
- Special use management |
In Progress: Scoping Start 05/15/2024 |
Expected:07/2024 |
07/2024 |
Joshua Krecklau 218-547-1044 Joshua.Krecklau@usda.gov |
Description: Replacement of septic system at West Pike Bay Lot 3 recreation residence
Web Link: http://www.fs.usda.gov/project/?project=66244 |
|||||
Location: UNIT - Walker Ranger District. STATE - Minnesota. COUNTY - Cass. LEGAL - T142N, R30W, Section 10. West Pike Bay Rec Residences. | |||||
In accordance with Federal civil rights law and U.S. Department of Agriculture (USDA) civil rights regulations and policies, the USDA, its Agencies, offices, and employees, and institutions participating in or administering USDA programs are prohibited from discriminating based on race, color, national origin, religion, sex, gender identity (including gender expression), sexual orientation, disability, age, marital status, family/parental status, income derived from a public assistance program, political beliefs, or reprisal or retaliation for prior civil rights activity, in any program or activity conducted or funded by USDA (not all bases apply to all programs). Remedies and complaint filing deadlines vary by program or incident.
Persons with disabilities who require alternative means of communication for program information (e.g., Braille, large print, audiotape, American Sign Language, etc.) should contact the responsible Agency or USDA’s TARGET Center at (202) 720-2600 (voice and TTY) or contact USDA through the Federal Relay Service at (800) 877-8339. Additionally, program information may be made available in languages other than English. To file a program discrimination complaint, complete the USDA Program Discrimination Complaint Form, AD-3027, found online at http://www.ascr.usda.gov/complaint_filing_cust.html and at any USDA office or write a letter addressed to USDA and provide in the letter all of the information requested in the form. To request a copy of the complaint form, call (866) 632-9992. Submit your completed form or letter to USDA by: (1) mail: U.S. Department of Agriculture Office of the Assistant Secretary for Civil Rights 1400 Independence Avenue, SW Washington, D.C. 20250-9410; (2) fax: (202) 690-7442; or (3) email: program.intake@usda.gov. USDA is an equal opportunity provider, employer, and lender. |