Report Contents (click to jump to a section) : - Projects Occurring Nationwide - R9 - Eastern Region, Huron-Manistee National Forest, Occurring in more than one District (excluding Forestwide) - R9 - Eastern Region, Huron-Manistee National Forest, Baldwin/White Cloud Ranger District (excluding Projects occurring in more than one District) - R9 - Eastern Region, Huron-Manistee National Forest, Cadillac/Manistee Ranger District (excluding Projects occurring in more than one District) - R9 - Eastern Region, Huron-Manistee National Forest, Huron Shores Ranger District (excluding Projects occurring in more than one District) - R9 - Eastern Region, Huron-Manistee National Forest, Mio Ranger District (excluding Projects occurring in more than one District) | |||||
Projects Occurring Nationwide |
|||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
---|---|---|---|---|---|
Land Management Plan Direction for Old-Growth Forest Conditions Across the National Forest System EIS *UPDATED* |
- Land management planning | Cancelled | N/A | N/A |
Jennifer McRae 202-791-8488 SM.FS.NFSWONGA@usda.gov |
Description: Amend all land management plans for units of the National Forest System to include consistent direction to conserve and steward existing and recruit future old-growth forest conditions and to monitor their condition across planning areas of NFS.
Web Link: http://www.fs.usda.gov/project/?project=65356 |
|||||
Location: UNIT - All Districts-level Units. STATE - All States. COUNTY - All Counties. LEGAL - Not Applicable. National Forests and Grasslands (128 units). | |||||
Locatable Mining Rule - 36 CFR 228, subpart A. EIS |
- Regulations, Directives, Orders | On Hold | N/A | N/A |
Sarah Shoemaker 907-586-7886 sarahshoemaker@fs.fed.us |
Description: The U.S. Department of Agriculture proposes revisions to its regulations at 36 CFR 228, Subpart A governing locatable minerals operations on National Forest System lands.A draft EIS & proposed rule should be available for review/comment in late 2020
Web Link: http://www.fs.usda.gov/project/?project=57214 |
|||||
Location: UNIT - All Districts-level Units. STATE - All States. COUNTY - All Counties. LEGAL - Not Applicable. These regulations apply to all NFS lands open to mineral entry under the US mining laws. More Information is available at: https://www.fs.usda.gov/science-technology/geology/minerals/locatable-minerals/current-revisions. | |||||
Back To Top | |||||
Huron-Manistee National Forest, Occurring in more than one District (excluding Forestwide) |
R9 - Eastern Region | ||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
Kirtland's Warbler Habitat Management Plan EA |
- Wildlife, Fish, Rare plants - Vegetation management (other than forest products) |
In Progress: Comment Period Public Notice 04/24/2023 |
Expected:04/2025 |
05/2025 |
Eric Oneil 989-739-0728 comments-eastern-huron-manistee-huron-shores@usda.gov |
Description: The goal of this project is to determine a 15-year Kirtland's Warbler (KW) habitat management plan that will provide clearance for the Forest Service required 1,211-acre per year goal to create KW habitat accounting for site suitability.
Web Link: http://www.fs.usda.gov/project/?project=63976 |
|||||
Location: UNIT - Huron Shores Ranger District, Mio Ranger District. STATE - Michigan. COUNTY - Alcona, Crawford, Iosco, Oscoda. LEGAL - 26N05E, 26N04E, 26N03E, 25N01E, 24N07E, 23N07E, 25N03E, 25N07E, 25N02E, 26N02W, 26N01E, 25N01W, 25N04E, 24N06E, and 23N06E. The project blocks are dispersed between the Huron Shores and Mio districts on designated KW Essential Habitat. | |||||
Back To Top | |||||
Huron-Manistee National Forest, Baldwin/White Cloud Ranger District (excluding Projects occurring in more than one District) |
R9 - Eastern Region | ||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
ITC Permit Amendment Grant Township, Oceana County CE *UPDATED* |
- Special use management |
In Progress: Scoping Start 10/30/2024 |
Expected:03/2025 |
04/2025 |
Grace Taranko 231-233-7752 Grace.Taranko@usda.gov |
Description: Michigan Electric Transmission Company (ITC) is requesting an amendment to add an already constructed transmission line to their existing authorization. The line has pre-existing rights, but was never added to the previous authorization. | |||||
Location: UNIT - Baldwin/White Cloud Ranger District. STATE - Michigan. COUNTY - Oceana. LEGAL - T13N, R17W, Section 34. Grant Township, Oceana County. | |||||
Biewer Temporary Road Project CE *UPDATED* |
- Special use management | Completed | Actual: 12/04/2024 | 12/2024 |
Dylan Sliter 231-745-5855 Dylan.Sliter@usda.gov |
Description: Consumer's Energy has proposed using NFS lands to access their property for logging. The road would be about 1,584' long and 10-12' wide and is already established as an unauthorized trail. It will require tree trimming and minor vegetation removal. | |||||
Location: UNIT - Baldwin/White Cloud Ranger District. STATE - Michigan. COUNTY - Mecosta. LEGAL - T14N, R10W, Section 16. Mecosta County, Michigan. | |||||
Callen, Langlois, Bell Association Access and Gate CE *UPDATED* |
- Special use management | Completed | Actual: 01/08/2025 | 01/2025 |
Dylan Sliter 231-745-5855 Dylan.Sliter@usda.gov |
Description: The Callen, Langlois, Bell Association has requested that a permit be issued to authorize the use and maintenance of an existing non-system road to access private properties year-round.
Web Link: http://www.fs.usda.gov/project/?project=67081 |
|||||
Location: UNIT - Baldwin/White Cloud Ranger District. STATE - Michigan. COUNTY - Newaygo. LEGAL - T14N, R12W, Section 25. Off North Pine Avenue, Wilcox Township, Newaygo County. | |||||
Consumer's Energy Amendment 23 CE *UPDATED* |
- Special use management | Completed | Actual: 01/08/2025 | 01/2025 |
Dylan Sliter 231-745-5855 Dylan.Sliter@usda.gov |
Description: The addition of three underground powerlines as well as a switch cabinet at one of the sites on NFS lands. Only one of the areas would require the removal of 3-4 small trees.
Web Link: http://www.fs.usda.gov/project/?project=66399 |
|||||
Location: UNIT - Baldwin/White Cloud Ranger District. STATE - Michigan. COUNTY - Newaygo, Oceana. LEGAL - T13N, R16W, Sec 32, Otto Township, Oceana County; T12N, R12W, Sc. 28 and 34, Brooks Township, Newaygo County. Otto Township, Oceana County and Brooks Township, Newaygo County, Michigan. | |||||
Kieser Access Project CE *NEW LISTING* |
- Special use management |
Developing Proposal Est. Scoping Start 03/2025 |
Expected:04/2025 | 04/2025 |
Dylan Sliter 231-745-5855 Dylan.Sliter@usda.gov |
Description: Use and maintenance of Forest Road 6189, in total approximately 4,240 ft long X 12 ft Wide. Activities include grading, adding gravel, and snow plowing. Ground Disturbance limited to existing roadbed. No tree removal proposed. | |||||
Location: UNIT - Baldwin/White Cloud Ranger District. STATE - Michigan. COUNTY - Lake. LEGAL - T17N, R12W, Sections 14 and 23. Yates Township, Lake County. | |||||
MDOT Roadside Park Improvements - Baldwin-White Cloud District CE *UPDATED* |
- Special use management |
In Progress: Scoping Start 11/06/2024 |
Expected:03/2025 |
04/2025 |
Colette Boothman 231-745-5849 Colette.Boothman@usda.gov |
Description: The vault bathrooms are in need of replacement and upgrade. MDOT proposes replacement of all vault restrooms at their roadside parks. Three of their roadside parks fall on Forest Service property and have been maintained by MDOT in the past. | |||||
Location: UNIT - Baldwin/White Cloud Ranger District. STATE - Michigan. COUNTY - Lake, Newaygo. LEGAL - Not Applicable. 3 Locations: US10 west of M37 intersection; US10 east of Baldwin; and, M37 between White Cloud and Newaygo. | |||||
Marten Habitat Improvement Project CE *NEW LISTING* |
- Wildlife, Fish, Rare plants - Vegetation management (other than forest products) |
Developing Proposal Est. Scoping Start 04/2025 |
Expected:05/2025 | 06/2025 |
Morgan Smith 231-745-5863 morgan.smith3@usda.gov |
Description: Improving American marten habitat using: underplanting; browse control to protect plantings; mechanical mastication; cutting/piling of competing vegetation; girdling/felling, snag creation, and hardwood release; and, install roost and den structures. | |||||
Location: UNIT - Baldwin/White Cloud Ranger District. STATE - Michigan. COUNTY - Lake. LEGAL - Not Applicable. The location of this project is in the core habitat of the American Marten and adjacent stands along the Pere Marquette River corridor and the US-10 corridor within Lake County. | |||||
North Country Trail Reroutes Project CE *UPDATED* |
- Recreation management | Completed | Actual: 01/23/2025 | 04/2025 |
Steven Sawyer 231-745-5851 Steven.Sawyer@usda.gov |
Description: The project would reroute five sections of the North Country Trail during the 2024 field season. Reroutes would provide a higher quality, safer, and more sustainable hiking experience by moving the trail and using a more sustainable design. | |||||
Location: UNIT - Baldwin/White Cloud Ranger District. STATE - Michigan. COUNTY - Newaygo. LEGAL - T13N,R12W,Sec 32; T13N,R13W,Sec 2; T14N,R13W,Sec 26; T15N,R13W,Sec 35; T15N,R13W,Sec 6. Basswood/M37; Echo Drive; Cole Creek; 6 Mile Road; Nichols Lake. | |||||
North M20 Snowmobile Trail Re-route Project CE *UPDATED* |
- Recreation management | Completed | Actual: 01/24/2025 | 04/2025 |
Steven Sawyer 231-745-5851 Steven.Sawyer@usda.gov |
Description: This purpose of this project is to reroute 1 section of snowmobile trail before the 2024 riding season and includes the North M20 re-route. Two illegal roads and the old trail will be closed by berms and signed closed to motorized use. | |||||
Location: UNIT - Baldwin/White Cloud Ranger District. STATE - Michigan. COUNTY - Oceana. LEGAL - T14N R17W Section 25. Shelby Township, Oceana County, Michigan. | |||||
Otto-Grant Road and Recreation Improvement Project EA *UPDATED* |
- Recreation management - Road management |
Developing Proposal Est. Scoping Start 04/2025 |
Expected:09/2025 | 09/2025 |
Dave Jaunese 231-745-4631 Ext. 3122 David.Jaunese@usda.gov |
Description: FS lands in Otto-White River area have been heavily impacted from illegal offroading and extensive camping use. The road system would be managed by redesignating use, road closures, moving roads to a more sustainable route, and designating campsites.
Web Link: http://www.fs.usda.gov/project/?project=59717 |
|||||
Location: UNIT - Baldwin/White Cloud Ranger District. STATE - Michigan. COUNTY - Oceana. LEGAL - T13N, R17W, Sections 9-16, 21-28, and 33-36; T13N, R16W, Sections 7-36. The project area is in Grant and Otto Townships of Oceana County. The project area is bounded by Arthur Road (north), 160th Avenue (east), Skeels Road (south), and Oceana Road (west). | |||||
Sweetwater Rainbow Parking Expansion CE *UPDATED* |
- Recreation management - Facility management |
In Progress: Scoping Start 11/19/2024 |
Expected:04/2025 |
04/2025 |
Colette Boothman 231-745-5849 Colette.Boothman@usda.gov |
Description: Sweetwater Trail System: the current parking area will expand outward by removing brush and trees. Rainbow Rapids: dead trees will be cleared within the recreation site and parking will be expanded west. | |||||
Location: UNIT - Baldwin/White Cloud Ranger District. STATE - Michigan. COUNTY - Lake. LEGAL - Not Applicable. The Sweetwater activities will take place at the Sweetwater Non-motorized Winter Trail System and the Rainbow Rapids Boat Launch Access parking lots. | |||||
We Want the Land Coalition Access and Gate CE *UPDATED* |
- Special use management | Completed | Actual: 01/31/2025 | 02/2025 |
Dylan Sliter 231-745-5855 Dylan.Sliter@usda.gov |
Description: We Want the Land Coalition, LLC has requested that a permit be issued to authorize the use and maintenance of a closed forest road to access private property year-round. | |||||
Location: UNIT - Baldwin/White Cloud Ranger District. STATE - Michigan. COUNTY - Oceana. LEGAL - T16N, R16W, Section 1. Off of 156th Avenue, Crystal Township, Oceana County. | |||||
Back To Top | |||||
Huron-Manistee National Forest, Cadillac/Manistee Ranger District (excluding Projects occurring in more than one District) |
R9 - Eastern Region | ||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
Consumer's Energy Slagle Township Project CE *UPDATED* |
- Special use management |
In Progress: Scoping Start 10/21/2024 |
Expected:03/2025 |
04/2025 |
Andrea Tavegia 231-775-2421 x8764 andrea.b.tavegia@usda.gov |
Description: Consumers Energy is proposing to install a new buried electrical line to bring service to a private property. It will be located on the east shoulder of the road, approximately 40 to 50 feet from the centerline. | |||||
Location: UNIT - Cadillac/Manistee Ranger District. STATE - Michigan. COUNTY - Wexford. LEGAL - T22N, R12W, Sec 1. East shoulder of 13 Road, just north of the intersection of 28 1/2 Road, north of Harrietta. | |||||
M&M Trail Improvements Project CE *UPDATED* |
- Recreation management |
In Progress: Scoping Start 05/24/2024 |
Expected:03/2025 |
04/2025 |
Reese Borlin 231-848-7090 x 5553115 Reese.Borlin@usda.gov |
Description: The Cadillac/Manistee Ranger District, in collaboration with partner organizations, propose a series of improvements to two non-motorized trail systems: the MacKenzie Trail and Big M. | |||||
Location: UNIT - Cadillac/Manistee Ranger District. STATE - Michigan. COUNTY - Wexford, Manistee. LEGAL - Not Applicable. Mackenzie Trail is located just northwest of Caberfae ski area, Wexford County. Big M trail is located off of M55 between Manistee and Wellston, Manistee County, Michigan. | |||||
MacKenzie Groomer Barn Project CE *UPDATED* |
- Special use management | Completed | Actual: 10/04/2024 | 10/2024 |
Reese Borlin 231-848-7090 x 5553115 Reese.Borlin@usda.gov |
Description: The Friends of MacKenzie recreation organization will work with the USFS to build a 16' by 25' barn to store machinery used to groom and maintain the MacKenzie trails. The prefab shed would be placed on the gravel parking lot of the recreation site. | |||||
Location: UNIT - Cadillac/Manistee Ranger District. STATE - Michigan. COUNTY - Wexford. LEGAL - Not Applicable. The project will be located in the parking lot of the MacKenzie Cross-Country and Mountain Bike Trail recreation area. | |||||
Manistee West Fuelbreak Project CE *UPDATED* |
- Fuels management | Completed | Actual: 03/17/2025 | 04/2025 |
Mark Herberger 231-723-2211 mark.herberger@usda.gov |
Description: The primary purpose of the Manistee West Fuelbreak Project is to establish and maintain fuelbreaks along existing features to reduce long-term wildfire risk to private property and reduce the risk of high-intensity wildfires. | |||||
Location: UNIT - Cadillac/Manistee Ranger District. STATE - Michigan. COUNTY - Wexford, Lake, Manistee. LEGAL - Not Applicable. Various locations throughout Manistee, Lake, and Wexford Counties. | |||||
Nighthawk Wildlife Habitat Management Project CE *UPDATED* |
- Vegetation management (other than forest products) |
In Progress: Scoping Start 03/20/2025 |
Expected:04/2025 |
05/2025 |
Patrick Laarman 231-723-2211 ext. 3138 patrick.b.laarman@usda.gov |
Description: Objectives are to maintain and improve the condition of existing ecological remnants, provide resiliency for plant and animal populations, provide habitat for threatened or endangered species, and provide new opportunities for forest users. | |||||
Location: UNIT - Cadillac/Manistee Ranger District. STATE - Michigan. COUNTY - Manistee, Mason. LEGAL - Not Applicable. Throughout southern Manistee and northern Mason Counties, Michigan. | |||||
Sawdust Hole North Country Trail Reroute Project CE *UPDATED* |
- Recreation management | Completed | Actual: 10/15/2024 | 10/2024 |
Reese Borlin 231-848-7090 x 5553115 Reese.Borlin@usda.gov |
Description: The Cadillac/Manistee Ranger District, in partnership with the North Country Trail Association, proposes to reroute 4 sections of the North Country National Scenic Trail located west of the Sawdust Hole river access site. | |||||
Location: UNIT - Cadillac/Manistee Ranger District. STATE - Michigan. COUNTY - Manistee. LEGAL - T22N, R14W, Sec 26. West of the Sawdust Hole river access site. | |||||
Wallner Access And Gate Project CE *NEW LISTING* |
- Special use management |
Developing Proposal Est. Scoping Start 04/2025 |
Expected:04/2025 | 05/2025 |
Dylan Sliter 231-745-5855 Dylan.Sliter@usda.gov |
Description: Landowner has requested a permit to authorize the use and maintenance of an existing non-system road accessing his private property, and will perform regular road maintenance activities as approved in an operating plan. | |||||
Location: UNIT - Cadillac/Manistee Ranger District. STATE - Michigan. COUNTY - Mason. LEGAL - T20N, R15W, Section 34. Meade Township, Mason County. | |||||
Back To Top | |||||
Huron-Manistee National Forest, Huron Shores Ranger District (excluding Projects occurring in more than one District) |
R9 - Eastern Region | ||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
Pine River Branches Project EA |
- Special area management - Wildlife, Fish, Rare plants - Forest products - Vegetation management (other than forest products) - Fuels management |
On Hold | N/A | N/A |
Benjamin Daly 989 739 0728 comments-eastern-huron-manistee-huron-shores@usda.gov |
Description: Managing timber resources, maintaining early successional wildlife habitat (forest openings and alder), reducing wildfire potential through prescribed fire and hazardous fuelbreak management, suppressing or eliminating non-native plants.
Web Link: http://www.fs.usda.gov/project/?project=62959 |
|||||
Location: UNIT - Huron Shores Ranger District. STATE - Michigan. COUNTY - Alcona. LEGAL - 26N06E, Sec 13-15, 21-28, 34-36; 26N07E, Sec 1, 2,11-24; 26N08E, Sec 4-9, 16-18; 27N07E, Sec 35, 36; 27N08E, Sec 30-33. Hawes, Gustin, and Millen Townships of Alcona County, Michigan. | |||||
Pine River Channel Restoration Project CE |
- Watershed management |
In Progress: Scoping Start 08/04/2022 |
Expected:07/2025 |
07/2025 |
Luca Adelfio 907-424-4753 luca.adelfio@usda.gov |
Description: Removal of unneeded mid-channel concrete structures blocking fish passage, reducing habitat quality, and damaging a hiking trail.
Web Link: http://www.fs.usda.gov/project/?project=62629 |
|||||
Location: UNIT - Huron Shores Ranger District. STATE - Michigan. COUNTY - Alcona. LEGAL - Township 25N, Range 7E, Section 16. The project is located at the Pine River Recreation Area and Campground along the South Branch of the Pine River near Glennie in Millen Township. | |||||
Back To Top | |||||
Huron-Manistee National Forest, Mio Ranger District (excluding Projects occurring in more than one District) |
R9 - Eastern Region | ||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
2023 Mio Ranger District Openings Maintenance Project CE |
- Wildlife, Fish, Rare plants |
In Progress: Scoping Start 04/07/2023 |
Expected:01/2025 |
01/2025 |
Greyling Brandt 218-663-8084 greyling.brandt@usda.gov |
Description: We are proposing to maintain open and/or early successional habitat conditions in approximately 5,050 acres of established wildlife openings.
Web Link: http://www.fs.usda.gov/project/?project=63936 |
|||||
Location: UNIT - Mio Ranger District. STATE - Michigan. COUNTY - Alcona, Crawford, Ogemaw, Oscoda. LEGAL - Not Applicable. Mio Ranger District. | |||||
2024 Union Corners Project EA |
- Wildlife, Fish, Rare plants - Forest products - Fuels management |
In Progress: Scoping Start 09/18/2024 Est. Comment Period Public Notice 09/2025 |
Expected:01/2026 |
01/2026 |
Karlis Lazda 989-826-3252 karlis.lazda@usda.gov |
Description: This projects proposed actions address needs for reducing wildfire potential, managing timber resources, providing for Kirtland warbler breeding habitat, forest openings for wildlife, suppressing NNIS, managing old growth, and road maintenance.
Web Link: http://www.fs.usda.gov/project/?project=66914 |
|||||
Location: UNIT - Mio Ranger District. STATE - Michigan. COUNTY - Oscoda. LEGAL - Township Range will be T26N R1E S36; T26N R2E S31; T25N R1E S1,12,36; T25N R2E S1-5,7,10-16,18,2125,27-29,32-24. The project is southwest of Mio and southeast of Luzerne. | |||||
Consumers Energy Indian Lake Road Special Use Permit CE |
- Special use management |
In Progress: Scoping Start 02/16/2024 |
Expected:01/2025 |
01/2025 |
Katie Racey 231-745-4631 ex 3138 katie.racey@usda.gov |
Description: Consumers Energy wishes to install a buried electrical line and associated fiberglass cabinets just outside the existing right-of-way of Forest Roads 4880 and 4877 to provide new electrical service to a private property.
Web Link: http://www.fs.usda.gov/project/?project=65660 |
|||||
Location: UNIT - Mio Ranger District. STATE - Michigan. COUNTY - Oscoda. LEGAL - Not Applicable. Section 8 of T27N R4E, Oscoda county. | |||||
Red Creek Project EA |
- Wildlife, Fish, Rare plants - Forest products - Vegetation management (other than forest products) - Fuels management - Road management |
On Hold | N/A | N/A |
Karlis Lazda 989-826-3252 karlis.lazda@usda.gov |
Description: Proposed actions include reducing wildfire potential, managing timber resources, providing for Kirtlands warbler breeding habitat, maintaining early successional wildlife habitat, suppressing non-native plant species infestations, and road management
Web Link: http://www.fs.usda.gov/project/?project=62753 |
|||||
Location: UNIT - Mio Ranger District. STATE - Michigan. COUNTY - Crawford, Oscoda. LEGAL - Oscoda County-T25 N, R1 E, S4 thru 8,10,11,and 15.T26N R1E, S1 thru 3,10 thru23,and 26thru 34.T25N, R2E, S5 thru 8,and 18. Crawford County - T25N, R1W,S1, 2, 3, 9 thru 14, 24, 25, and 34 thru 36. The proposed actions are located on National Forest System lands in Big Creek Township in Oscoda County and South Branch Township in Crawford County, Michigan. | |||||
In accordance with Federal civil rights law and U.S. Department of Agriculture (USDA) civil rights regulations and policies, the USDA, its Agencies, offices, and employees, and institutions participating in or administering USDA programs are prohibited from discriminating based on race, color, national origin, religion, sex, gender identity (including gender expression), sexual orientation, disability, age, marital status, family/parental status, income derived from a public assistance program, political beliefs, or reprisal or retaliation for prior civil rights activity, in any program or activity conducted or funded by USDA (not all bases apply to all programs). Remedies and complaint filing deadlines vary by program or incident.
Persons with disabilities who require alternative means of communication for program information (e.g., Braille, large print, audiotape, American Sign Language, etc.) should contact the responsible Agency or USDA’s TARGET Center at (202) 720-2600 (voice and TTY) or contact USDA through the Federal Relay Service at (800) 877-8339. Additionally, program information may be made available in languages other than English. To file a program discrimination complaint, complete the USDA Program Discrimination Complaint Form, AD-3027, found online at http://www.ascr.usda.gov/complaint_filing_cust.html and at any USDA office or write a letter addressed to USDA and provide in the letter all of the information requested in the form. To request a copy of the complaint form, call (866) 632-9992. Submit your completed form or letter to USDA by: (1) mail: U.S. Department of Agriculture Office of the Assistant Secretary for Civil Rights 1400 Independence Avenue, SW Washington, D.C. 20250-9410; (2) fax: (202) 690-7442; or (3) email: program.intake@usda.gov. USDA is an equal opportunity provider, employer, and lender. |