Report Contents (click to jump to a section) : - Projects Occurring Nationwide - R9 - Eastern Region, White Mountain National Forest, Forestwide (excluding Projects occurring in more than one Forest) - R9 - Eastern Region, White Mountain National Forest, Androscoggin Ranger District (excluding Projects occurring in more than one District) - R9 - Eastern Region, White Mountain National Forest, Pemigewasset Ranger District (excluding Projects occurring in more than one District) - R9 - Eastern Region, White Mountain National Forest, Saco Ranger District (excluding Projects occurring in more than one District) | |||||
Projects Occurring Nationwide |
|||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
---|---|---|---|---|---|
Land Management Plan Direction for Old-Growth Forest Conditions Across the National Forest System EIS |
- Land management planning |
In Progress: DEIS NOA in Federal Register 06/21/2024 Est. FEIS NOA in Federal Register 12/2024 |
Expected:01/2025 |
01/2025 |
Jennifer McRae 202-791-8488 SM.FS.NFSWONGA@usda.gov |
Description: Amend all land management plans for units of the National Forest System to include consistent direction to conserve and steward existing and recruit future old-growth forest conditions and to monitor their condition across planning areas of NFS.
Web Link: http://www.fs.usda.gov/project/?project=65356 |
|||||
Location: UNIT - All Districts-level Units. STATE - All States. COUNTY - All Counties. LEGAL - Not Applicable. National Forests and Grasslands (128 units). | |||||
Locatable Mining Rule - 36 CFR 228, subpart A. EIS |
- Regulations, Directives, Orders | On Hold | N/A | N/A |
Sarah Shoemaker 907-586-7886 sarahshoemaker@fs.fed.us |
Description: The U.S. Department of Agriculture proposes revisions to its regulations at 36 CFR 228, Subpart A governing locatable minerals operations on National Forest System lands.A draft EIS & proposed rule should be available for review/comment in late 2020
Web Link: http://www.fs.usda.gov/project/?project=57214 |
|||||
Location: UNIT - All Districts-level Units. STATE - All States. COUNTY - All Counties. LEGAL - Not Applicable. These regulations apply to all NFS lands open to mineral entry under the US mining laws. More Information is available at: https://www.fs.usda.gov/science-technology/geology/minerals/locatable-minerals/current-revisions. | |||||
Back To Top | |||||
White Mountain National Forest, Forestwide (excluding Projects occurring in more than one Forest) |
R9 - Eastern Region | ||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
Appalachian Trail Legacy Restoration Fund: shelters, privies, campsites, bridges & parking areas CE *UPDATED* |
- Recreation management - Facility management |
In Progress: Scoping Start 09/30/2024 |
Expected:09/2025 |
10/2025 |
Stanley Carte 603-536-6245 stanley.carte@usda.gov |
Description: NPS proposed projects on the AT to address deferred maintenance. Maintenance work would occur at shelters, privies, parking areas, campsites, and trail bridges across the forest.
Web Link: http://www.fs.usda.gov/project/?project=67029 |
|||||
Location: UNIT - White Mountain National Forest All Units. STATE - New Hampshire. COUNTY - Coos, Grafton. LEGAL - Not Applicable. along AT in Coos and Grafton Counties. | |||||
Grafton County Fiber Optic Special Use Permit CE |
- Special use management |
In Progress: Scoping Start 09/30/2024 |
Expected:04/2025 |
05/2025 |
Jennifer Burnett 603-536-6237 jennifer.burnett2@usda.gov |
Description: Grafton County proposes to install about 9.5 miles of fiber optic line, about 7.2 miles aerially on existing utility poles and about 2.3 miles in new buried conduit.
Web Link: http://www.fs.usda.gov/project/?project=66950 |
|||||
Location: UNIT - White Mountain National Forest All Units. STATE - New Hampshire. COUNTY - Grafton. LEGAL - Not Applicable. Project is in the towns of Landaff, Waterville Valley, Benton, Easton, and Orford, Grafton County, New Hampshire. | |||||
Wilderness Standard Forest Plan Amendment-Trail Management EA *UPDATED* |
- Land management planning - Recreation management - Projects that may affect Wilderness (for mailing list contacts) |
In Progress: Scoping Start 03/02/2023 Est. Comment Period Public Notice 03/2025 |
Expected:10/2025 |
10/2025 |
Theresa Corless 603-536-6135 theresa.corless@usda.gov |
Description: Amending the Forest Plan to enable relocations of trails in Wilderness and addition of existing travel corridors to the National Forest Trail System when for resource protection purposes.
Web Link: http://www.fs.usda.gov/project/?project=63551 |
|||||
Location: UNIT - White Mountain National Forest All Units. STATE - Maine, New Hampshire. COUNTY - Oxford, Carroll, Coos, Grafton. LEGAL - Not Applicable. all designated Wilderness on the White Mountain National Forest. | |||||
Back To Top | |||||
White Mountain National Forest, Androscoggin Ranger District (excluding Projects occurring in more than one District) |
R9 - Eastern Region | ||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
Eversource S-136 Transmission Line Rebuild Project CE *UPDATED* |
- Special use management - Facility management |
Completed | Actual: 12/04/2024 | 12/2024 |
Marianne Leberman 603-466-2713 ext216 marianne.leberman@usda.gov |
Description: Eversource, permit holder for utility lines across the WMNF, has identified 214 existing structures that need to be replaced within the existing right of way (ROW) of the S-136 transmission line in Whitefield, Jefferson, Randolph, and Gorham NH.
Web Link: http://www.fs.usda.gov/project/?project=65419 |
|||||
Location: UNIT - Androscoggin Ranger District. STATE - New Hampshire. COUNTY - Coos. LEGAL - Not Applicable. About seven miles of the Whitefield to Berlin (S-136) transmission line in Jefferson, Randolph, and Gorham; Coos County, New Hampshire. | |||||
Great Glen Libby Trace Mountain Bike Spur Trail Construction CE *UPDATED* |
- Recreation management - Special use management |
Developing Proposal Est. Scoping Start 04/2025 |
Expected:06/2025 | 10/2025 |
Erica Dickerman 603-536-6100 erica.dickerman@usda.gov |
Description: Construction of a new 0.4 of a mile long single-track mountain bike spur trail about 24 inches wide at Great Glen Outdoors Center.
Web Link: http://www.fs.usda.gov/project/?project=67027 |
|||||
Location: UNIT - Androscoggin Ranger District. STATE - New Hampshire. COUNTY - Coos. LEGAL - Not Applicable. Great Glen Outdoors Center, Greens Grant, base of Mount Washington, Route 16. | |||||
Hermit Lake Complex Shelters
CE *UPDATED* |
- Recreation management - Special use management |
In Progress: Scoping Start 03/29/2024 |
Expected:04/2025 |
04/2025 |
Travis Pellerin 303-567-3016 travis.pellerin@usda.gov |
Description: Removal of one Adirondack shelter, rehabilitation of two shelters, construction of three tent platforms and construction of a five-bay composting toilet system.
Web Link: http://www.fs.usda.gov/project/?project=65417 |
|||||
Location: UNIT - Androscoggin Ranger District. STATE - New Hampshire. COUNTY - Coos. LEGAL - Not Applicable. Pinkham Notch, about two and a half miles up the Tuckerman Ravine Trail from AMC Pinkham Notch Visitor Center on Route sixteen. | |||||
Huntington Ravine Winter Access Trail Bridge Replacements CE |
- Recreation management |
In Progress: Scoping Start 09/30/2024 |
Expected:03/2025 |
10/2025 |
Bryanne Thompson 603-536-6257 Bryanne.Thompson@usda.gov |
Description: Replace 5 bridges at the end of their lifespan along Huntington Ravine Water Access Trail. The trail network is used for winter recreation and is an admin route as it is used for rescues and winter avalanche forecasting.
Web Link: http://www.fs.usda.gov/project/?project=67033 |
|||||
Location: UNIT - Androscoggin Ranger District. STATE - New Hampshire. COUNTY - Coos. LEGAL - Not Applicable. Huntington Ravine Winter Access Trail connects Tuckerman Ravine Trail with the base of Huntington Ravine. Eastern flank of Mt Washington 1.6 miles from Pinkham Notch Visitor Center. | |||||
Mount Moriah Trail Bog Bridge Replacements CE *UPDATED* |
- Recreation management |
Developing Proposal Est. Scoping Start 04/2025 |
Expected:10/2025 | 10/2025 |
Nathan Peters 603-466-2713 nathan.peters@usda.gov |
Description: AMC proposes to replace up to 12 deteriorating bog bridges in kind along the Mount Moriah trail (AT). There are four project sites. Existing waterbars in the area will be improved. Materials will be airlifted and then carried to the sites.
Web Link: http://www.fs.usda.gov/project/?project=67026 |
|||||
Location: UNIT - Androscoggin Ranger District. STATE - New Hampshire. COUNTY - Coos. LEGAL - Not Applicable. Mount Moriah Trail, Gorham. | |||||
One Mile Lonesome Ridge Integrated Resource Project EA |
- Recreation management - Wildlife, Fish, Rare plants - Forest products - Watershed management - Road management |
In Progress: Scoping Start 09/12/2024 Est. Comment Period Public Notice 06/2025 |
Expected:12/2025 |
09/2026 |
Scott Hall 603-536-6226 scott.hall@usda.gov |
Description: The Androscoggin Ranger District is developing a proposal for watershed, wildlife habitat, vegetation management, and recreation management actions in the One Mile Lonesome Ridge habitat management unit.
Web Link: http://www.fs.usda.gov/project/?project=65064 |
|||||
Location: UNIT - Androscoggin Ranger District. STATE - New Hampshire. COUNTY - Coos. LEGAL - Not Applicable. The One Mile Lonesome Ridge habitat management unit along the Kilkenny Loop Road in Berlin, New Hampshire. | |||||
Pinkham Notch Visitor Center Accessible Trail Establishment CE *UPDATED* |
- Recreation management |
Developing Proposal Est. Scoping Start 04/2025 |
Expected:09/2025 | 10/2025 |
Nathan Peters 603-466-2713 nathan.peters@usda.gov |
Description: Create an accessible trail, meeting Forest Service Trail Accessibility Guidelines(FSTAG), at the Pinkham Notch Visitor Center.
Web Link: http://www.fs.usda.gov/project/?project=67025 |
|||||
Location: UNIT - Androscoggin Ranger District. STATE - New Hampshire. COUNTY - Coos. LEGAL - Not Applicable. Pinkham Notch Visitors Center, Gorham. | |||||
Success Pond Ingalls Valley Road Culvert Removal CE *UPDATED* |
- Wildlife, Fish, Rare plants - Watershed management |
In Progress: Scoping Start 09/30/2024 |
Expected:10/2025 |
10/2025 |
William Oneill 603-466-2713 x1231 william.oneill@usda.gov |
Description: The Androscoggin Ranger District proposes the removal of three culverts on the dead-end Ingalls Valley Road located off Success Pond Road.
Web Link: http://www.fs.usda.gov/project/?project=65961 |
|||||
Location: UNIT - Androscoggin Ranger District. STATE - New Hampshire. COUNTY - Coos. LEGAL - Not Applicable. The Success Trailhead sign on Ingalls Valley Road just off Success Pond Road in Success Township, Coos County, New Hampshire. | |||||
Back To Top | |||||
White Mountain National Forest, Pemigewasset Ranger District (excluding Projects occurring in more than one District) |
R9 - Eastern Region | ||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
AMC Galehead Hut Solar Hot Water Panel Installation CE *UPDATED* |
- Special use management |
In Progress: Scoping Start 12/20/2024 |
Expected:04/2025 |
05/2025 |
Marianne Leberman 603-466-2713 ext216 marianne.leberman@usda.gov |
Description: EMC proposes to install 6 flat-plate style solar thermal collectors on the roof of the Galehead Hut to reduce propane used to heat water.
Web Link: http://www.fs.usda.gov/project/?project=67012 |
|||||
Location: UNIT - Pemigewasset Ranger District. STATE - New Hampshire. COUNTY - Grafton. LEGAL - Not Applicable. AMC Galehead Hut in Lincoln, New Hampshire. | |||||
Campton Dam Conveyance CE *UPDATED* |
- Land ownership management - Facility management |
In Progress: Scoping Start 03/29/2024 |
Expected:10/2025 |
10/2025 |
James Detzel 603-536-6250 james.detzel@usda.gov |
Description: Project focus would be to convey the dam, which will result in a similar land use and alleviate the maintenance burden from the Forest Service. This would be a direct sale to the permittee of the special use permit.
Web Link: http://www.fs.usda.gov/project/?project=65605 |
|||||
Location: UNIT - Pemigewasset Ranger District. STATE - New Hampshire. COUNTY - Grafton. LEGAL - Not Applicable. Campton Dam, Town of Campton, Grafton County, New Hampshire (NH) Mad River, NH Route 49, Pond Road. | |||||
Eversource X-178-1 Transmission Line Rebuild CE *UPDATED* |
- Special use management |
In Progress: Scoping Start 03/29/2024 |
Expected:01/2025 |
01/2025 |
Marianne Leberman 603-466-2713 ext216 marianne.leberman@usda.gov |
Description: The Eversource Energy company proposes to replace five wooden H-frame structures with new, steel H-frame structures along 0.28 of a mile of the Right-Of-Way within the White Mountain National Forest.
Web Link: http://www.fs.usda.gov/project/?project=65963 |
|||||
Location: UNIT - Pemigewasset Ranger District. STATE - New Hampshire. COUNTY - Grafton. LEGAL - Not Applicable. About one quarter of a mile of the established Beebe to North Woodstock transmission line going through Campton, Thornton, and Woodstock, Grafton County, New Hampshire. | |||||
Eversource X-178-2 Transmission Line Rebuild and Optical Ground Wire Installation CE *UPDATED* |
- Special use management |
Developing Proposal Est. Scoping Start 04/2025 |
Expected:10/2025 | 10/2025 |
Marianne Leberman 603-536-6236 marianne.leberman@usda.gov |
Description: Eversource proposes replacing about 140 wooden utility poles (i.e. structures) with steel pole equivalents in the existing ROW, as well as installing about 102,000 linear feet of Optical Ground Wire.
Web Link: http://www.fs.usda.gov/project/?project=67011 |
|||||
Location: UNIT - Pemigewasset Ranger District. STATE - New Hampshire. COUNTY - Grafton. LEGAL - Not Applicable. Towns of Woodstock, Lincoln, and Easton in Grafton County. | |||||
Fabyans Cabin Rental Development CE *UPDATED* |
- Recreation management |
In Progress: Scoping Start 09/30/2024 |
Expected:07/2025 |
07/2025 |
Ryan Twomey 603-536-6102 ryan.twomey@usda.gov |
Description: The Pemigewasset Ranger District proposes to redevelop Fabyans cabin into a rental camp, along with additional administrative uses.
Web Link: http://www.fs.usda.gov/project/?project=65964 |
|||||
Location: UNIT - Pemigewasset Ranger District. STATE - New Hampshire. COUNTY - Grafton. LEGAL - Not Applicable. Fabyans Cabin off Old Cherry Mountain Road in Carroll, Grafton County, New Hampshire. | |||||
Falling Waters Trail Relocation CE *UPDATED* |
- Recreation management | Completed | Actual: 10/17/2024 | 04/2025 |
Michael Mosley 603-536-6107 michael.mosley@usda.gov |
Description: Relocate about 5100 feet of the Falling Waters trail to a more sustainable grade and location, along with construction of a new 1900-foot spur trail to Cloudland Falls. Work would be done by the Appalachian Mountain Club.
Web Link: http://www.fs.usda.gov/project/?project=66490 |
|||||
Location: UNIT - Pemigewasset Ranger District. STATE - New Hampshire. COUNTY - Grafton. LEGAL - Not Applicable. Falling Waters Trail off Franconia Notch State Park along Interstate 93 in the town of Franconia. | |||||
Lincoln Woods Trail Reconstruction 2021 CE *UPDATED* |
- Recreation management |
In Progress: Scoping Start 12/30/2021 |
Expected:07/2025 |
07/2025 |
Brett Durham 603-536-6251 Brett.Durham@usda.gov |
Description: Installation of slope stability measures and a retaining wall along eight hundred feet of the Lincoln Woods Trail.
Web Link: http://www.fs.usda.gov/project/?project=61348 |
|||||
Location: UNIT - Pemigewasset Ranger District. STATE - New Hampshire. COUNTY - Grafton. LEGAL - Not Applicable. Eight hundred feet of the Lincoln Woods Trail starting about one-half mile from the Lincoln Woods Trailhead in Lincoln, Grafton County, New Hampshire. | |||||
Lost River Integrated Resource Project EA *UPDATED* |
- Recreation management - Wildlife, Fish, Rare plants - Forest products - Road management |
In Progress: Scoping Start 03/31/2023 Est. Comment Period Public Notice 01/2025 |
Expected:08/2025 |
08/2025 |
Scott Hall 603-536-6226 scott.hall@usda.gov |
Description: The Pemigewasset Ranger District of the White Mountain National Forest proposes recreation, transportation, vegetation, and wildlife habitat management activities within the Lost River project area, Woodstock, Grafton County, New Hampshire.
Web Link: http://www.fs.usda.gov/project/?project=63401 |
|||||
Location: UNIT - Pemigewasset Ranger District. STATE - New Hampshire. COUNTY - Grafton. LEGAL - Not Applicable. The project is focused on the Lost River and Franconia Habitat Management Units in Woodstock and Lincoln, Grafton County, New Hampshire. | |||||
Russell Pond Campground Vegetation Management Project CE *UPDATED* |
- Vegetation management (other than forest products) |
In Progress: Scoping Start 03/29/2024 |
Expected:09/2025 |
10/2025 |
Benjamin Farina 603-536-6131 benjamin.farina@usda.gov |
Description: Harvest white ash and other hazard trees within one tree length to campsites and common areas at the Russell Pond Campground.
Web Link: http://www.fs.usda.gov/project/?project=65966 |
|||||
Location: UNIT - Pemigewasset Ranger District. STATE - New Hampshire. COUNTY - Grafton. LEGAL - Not Applicable. The immediate vicinity of Russell Pond Campground up to 100 feet outside the perimeter, off Russell Pond Road accessed via Tripoli Road in Woodstock and Thornton, Grafton County, New Hampshire. | |||||
Waterville Vallely Resort Proposed Expansion EIS *NEW LISTING* |
- Land management planning - Recreation management - Special use management - Facility management |
Developing Proposal Est. NOI in Federal Register 04/2025 |
Expected:10/2027 | 12/2027 |
Matthew Loscalzo 720-908-1213 Matthew.Loscalzo@usda.gov |
Description: Waterville Valley Resort proposes expansion of its special use permit boundary; installation of a village to summit lift system; ski terrain areas; facilities; new snowmaking infrastructure; parking; and amendments to the White Mountain Forest Plan. | |||||
Location: UNIT - Pemigewasset Ranger District. STATE - New Hampshire. COUNTY - Grafton. LEGAL - Not Applicable. Waterville Valley Resort and adjacent land. | |||||
Waterville Valley Resort Uphill Route Construction CE |
- Special use management |
Developing Proposal Est. Scoping Start 07/2025 |
Expected:08/2025 | 10/2025 |
Erica Dickerman 603-536-6100 erica.dickerman@usda.gov |
Description: Waterville Valley Resort [proposes to construct a new uphill route about 0.8 miles long and three feet wide through trees to move the existing uphill route awayfrom an existing downhill route.
Web Link: http://www.fs.usda.gov/project/?project=67014 |
|||||
Location: UNIT - Pemigewasset Ranger District. STATE - New Hampshire. COUNTY - Grafton. LEGAL - Not Applicable. Waterville Valley Resort. | |||||
Waterville Valley Ski Resort Red Feathers Cross-Country Ski Trail Construction CE *UPDATED* |
- Recreation management |
In Progress: Scoping Start 12/20/2024 |
Expected:04/2025 |
04/2025 |
Erica Dickerman 603-536-6100 erica.dickerman@usda.gov |
Description: Waterville Valley Ski Resort proposes to construct the 2130-foot Red Feathers Nordic ski trail that will connect the Livermore and Moose Run Nordic ski trails as part of the Waterville Valley Ski Resort Nordic ski trail network.
Web Link: http://www.fs.usda.gov/project/?project=65636 |
|||||
Location: UNIT - Pemigewasset Ranger District. STATE - New Hampshire. COUNTY - Grafton. LEGAL - Not Applicable. Within the Waterville Valley Resort special use permit boundary on National Forest System lands in Waterville Valley, Grafton County, New Hampshire. | |||||
Back To Top | |||||
White Mountain National Forest, Saco Ranger District (excluding Projects occurring in more than one District) |
R9 - Eastern Region | ||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
Albany Wildfire Resiliency Project CE *UPDATED* |
- Fuels management | Completed | Actual: 12/03/2024 | 12/2024 |
Nicholas Jeros 603-536-6261 nicholas.jeros@usda.gov |
Description: Apply fire to 725 acres across five units and conduct about 235 acres of timber harvesting across thirteen units to reduce fuel loads.
Web Link: http://www.fs.usda.gov/project/?project=64861 |
|||||
Location: UNIT - Saco Ranger District. STATE - New Hampshire. COUNTY - Carroll. LEGAL - Not Applicable. About 750 acres of the Wildland-Urban Interface on National Forest System lands in Albany and Hales Location, New Hampshire. | |||||
Government Pit Mineral Site Designation EA *UPDATED* |
- Minerals and Geology |
Developing Proposal Est. Scoping Start 02/2025 |
Expected:12/2025 | 01/2026 |
James Innes 603-447-5448 x 5102 james.innes@usda.gov |
Description: Cutting about 50 red pine trees over three inch or larger diameter at breast height and removing fill in about a 100 by 100-foot area on the north side of the pit to establish the Government Pit mineral collection site. | |||||
Location: UNIT - Saco Ranger District. STATE - New Hampshire. COUNTY - Carroll. LEGAL - Not Applicable. Off High Street, just past High Street Cemetary in Albany, Carroll County, New Hampshire. | |||||
Hales Location Wildfire Resiliency Project CE *UPDATED* |
- Fuels management | Completed | Actual: 12/03/2024 | 12/2024 |
Nicholas Jeros 603-536-6261 nicholas.jeros@usda.gov |
Description: Apply fire to 913 acres across two units in Albany and Hales Location to reduce hazardous fuel loading and remove suppressed or overstocked tree species. Hazard trees would be identified during site preparation and removed before burning begins.
Web Link: http://www.fs.usda.gov/project/?project=63301 |
|||||
Location: UNIT - Saco Ranger District. STATE - New Hampshire. COUNTY - Carroll. LEGAL - Not Applicable. Saco Ranger District, located west of Forest roads 227 and 380 and east of high School Loop and Tent Boulder bike trails in Albany and Hales Location, Carroll County, New Hampshire. | |||||
Jackson Ski Touring Center Bengt Trail Bridge Replacement and Trail Reroute CE *UPDATED* |
- Special use management |
Developing Proposal Est. Scoping Start 04/2025 |
Expected:07/2025 | 07/2025 |
Erica Dickerman 603-536-6100 erica.dickerman@usda.gov |
Description: This project proposes two bridge replacements. If the current locations are not suitable, new locations nearby will be considered, and a small trail reroute to tie the new bridges to the existing trail may be necessary.
Web Link: http://www.fs.usda.gov/project/?project=67019 |
|||||
Location: UNIT - Saco Ranger District. STATE - New Hampshire. COUNTY - Carroll. LEGAL - Not Applicable. Jackson Ski Touring Center Bengt Trail between the Ellis River Trail South Branch and the South Hall Trail. | |||||
Kancamagus Highway and Conway Oak and Ash Salvage CE *UPDATED* |
- Forest products - Vegetation management (other than forest products) |
Completed | Actual: 12/10/2024 | 12/2024 |
Rick Alimi 603-447-5448 x103 Richard.Alimi@usda.gov |
Description: in 2020 spongy moth caused heavy mortality in Conway and Albany. Dead oaks near the road in the Moat area and in the Blackberry Crossing Campground are a hazard and need to be removed. This project will remove ash trees from Covered Bridge Campground
Web Link: http://www.fs.usda.gov/project/?project=67020 |
|||||
Location: UNIT - Saco Ranger District. STATE - New Hampshire. COUNTY - Carroll. LEGAL - Not Applicable. Three locations: one location at Blackberry Crossing Campground and Covered Bridge parking lot and Covered Bridge Campground along the Kancamagus Highway, as well as along the Conway burn units. | |||||
NHDOT Chatham Storage Building Replacement CE *UPDATED* |
- Special use management - Facility management |
In Progress: Scoping Start 06/30/2022 |
Expected:10/2025 |
10/2025 |
Jennifer Burnett 603-536-6237 jennifer.burnett2@usda.gov |
Description: New Hampshire DoT requests the White Mountain National Forest authorize the replacement of a 70 year old storage building and construction of a new salt storage building.
Web Link: http://www.fs.usda.gov/project/?project=62438 |
|||||
Location: UNIT - Saco Ranger District. STATE - New Hampshire. COUNTY - Carroll. LEGAL - Not Applicable. Storage area off of Butler Hill Rd., Chatham, Carroll County, New Hampshire. | |||||
Sawyer River 2 Bridge Replacement and Project-Specific Forest Plan Amendment EA *UPDATED* |
- Land management planning - Road management |
In Progress: Objection Period Legal Notice 11/07/2024 |
Expected:02/2025 |
05/2025 |
Bryanne Thompson 603-536-6257 Bryanne.Thompson@usda.gov |
Description: Replace the Sawyer River 2 bridge with a similar bridge type. A project-specific forest plan amendment is needed to exempt the bridge from the standard on page 2-31 of the forest plan.
Web Link: http://www.fs.usda.gov/project/?project=63025 |
|||||
Location: UNIT - Saco Ranger District. STATE - New Hampshire. COUNTY - Carroll. LEGAL - Not Applicable. Sawyer River 2 bridge along Sawyer River Road, off route 302 in Bartlett, Carroll County, New Hampshire. | |||||
In accordance with Federal civil rights law and U.S. Department of Agriculture (USDA) civil rights regulations and policies, the USDA, its Agencies, offices, and employees, and institutions participating in or administering USDA programs are prohibited from discriminating based on race, color, national origin, religion, sex, gender identity (including gender expression), sexual orientation, disability, age, marital status, family/parental status, income derived from a public assistance program, political beliefs, or reprisal or retaliation for prior civil rights activity, in any program or activity conducted or funded by USDA (not all bases apply to all programs). Remedies and complaint filing deadlines vary by program or incident.
Persons with disabilities who require alternative means of communication for program information (e.g., Braille, large print, audiotape, American Sign Language, etc.) should contact the responsible Agency or USDA’s TARGET Center at (202) 720-2600 (voice and TTY) or contact USDA through the Federal Relay Service at (800) 877-8339. Additionally, program information may be made available in languages other than English. To file a program discrimination complaint, complete the USDA Program Discrimination Complaint Form, AD-3027, found online at http://www.ascr.usda.gov/complaint_filing_cust.html and at any USDA office or write a letter addressed to USDA and provide in the letter all of the information requested in the form. To request a copy of the complaint form, call (866) 632-9992. Submit your completed form or letter to USDA by: (1) mail: U.S. Department of Agriculture Office of the Assistant Secretary for Civil Rights 1400 Independence Avenue, SW Washington, D.C. 20250-9410; (2) fax: (202) 690-7442; or (3) email: program.intake@usda.gov. USDA is an equal opportunity provider, employer, and lender. |