Locating Your Trail Bridge for Longevity
Appendix D—Hydraulic Structure Initial Site Examination Form
HYDRAULIC STRUCTURE INITIAL SITE EXAMINATION FORM (DATA SHEET FOR FORDS, BRIDGES, AND CULVERTS) (INCLUDE SITE SURVEY, LONGITUDINAL PROFILE, AND CROSS-SECTIONS) |
|||
---|---|---|---|
FOREST: | ROAD (TRAIL) NAME: | ||
STRUCTURE NAME: | STREAM NAME: | ||
STRUCTURE NUMBER: | LOCATION: | ||
SECTION: | TOWNSHIP: | RANGE: | |
A. HYDROLOGIC & HYDRAULIC DATA | |||
1. SHOW DRAINAGE AREA ON A 15 MINUTE TOPOGRAPHIC MAP | 2. NAME OF CLOSEST GAGING STATION and DISTANCE IN MILES: | ||
3A. MANNING'S ROUGHNESS COEFFICIENT (N): | 3B. AVERAGE STREAMBED SLOPE: | ||
500' UPSTREAM: | 500' DOWNSTREAM: | ||
4. DESCRIBE CHARACTER OF STREAM BED MATERIAL AND STREAM BANKS WITHIN THE 1000-FOOT AREA: |
|||
5A. AMOUNT OF DEBRIS IN CHANNEL: | 5B. TYPE OF DEBRIS: | ||
6. WATER ELEVATONS: | |||
6A. DATE AND FLOW DEPTH AT TIME OF SURVEY: | 6B. EST. BASE FLOW DEPTH OCCURS "MONTH": | 6C. EST. EXTREME HIGH WATER DEPTH (HOW DETERMINED?): | |
6D. CAUSE AND SEASON OF FLOODS: |
|||
B. OTHER CHANNEL CHARACTERISTICS | |||
1. NOTE EVIDENCE OF INSTABILITY OF BANKS OR SCOUR: | |||
2A. STRAIGHT CHANNEL, OR NOTE DEGREE OF SINUOUSITY: |
2B. HIGH FLOW ANGLE OF APPROACH (PARALLEL OR IMPINGING?): | ||
3. CHANNEL STABILITY (AGGRADATION, DOWNCUTTING, LATERAL CHANNEL MIGRATION, ETC): | |||
4. CHANNEL CLASSIFICATION (ROSGEN OR OTHER): | |||
5. CHANNEL ENTRENCHMENT (RATIO = FLOOD-PRONE/BANKFULL WIDTH): | |||
6. UPSTREAM/DOWNSTREAM STRUCTURES AFFECTING SITE (DAMS, BRIDGES, ETC.): | |||
7. OTHER SITE ASSESSMENT FACTORS: | |||
C. FOUNDATION CONDITIONS | |||
1. CHARACTER OF SURFACE OR LOCAL MATERIALS: | |||
2. ESTIMATED DEPTH TO BEDROCK FEET: | 2A. BEDROCK TYPE & CONDITION: | ||
3. ANY SPECIAL FOUNDATION CONDITIONS? INVESTIGATION NEEDED? EXPLAIN: |
|||
D. EXISTING STRUCTURE | |||
1. TYPE OF EXISTING STRUCTURE: | 1A. NO & LENGTH OF SPANS: |
1B. TYPE OF CULVERT: | 1C. SIZE: |
2. WATERWAY OPENING (FEET WIDE OR SQUARE FEET): |
2A. WATERWAY ADEQUATE? Yes/No | ||
3. STRUCTURE AFFECTED BY: Debris/Ice/Damage/Scour | 4. DOES STRUCTURE CONSTRICT THE NATURAL CHANNEL: Yes/No | ||
5. CONDITION OF EXISTING STRUCTURE: | |||
E. PROPOSED STRUCTURE | |||
1. BRIDGE OR LOW-WATER CROSSING TYPE: | 1A. LOADING (JUSTIFY IF OTHER THEN HS 20): | ||
1B. WIDTH: | 1C. SUBSTRUCTURE OR SPECIAL NEEDS: | ||
2. TYPE OF CULVERT: | 2A. SIZE: | ||
2B. CULVERT DESIGN ISSUES? | |||
2C. CORROSION OR ABRASION CONCERNS? | 2D. TYPE OF FILL MATERIAL TO BE USED: | ||
F. MISCELLANEOUS DATA | |||
1. TIME AND DURATION OF CONSTRUCTION SEASON: |
2. RIPRAP IS AVAILABLE: Yes/No | 2A. DISTANCE FROM SITE: Yes/No | |
2B. DESCRIPTION OF RIPRAP MATERIAL: |
|||
3. TRAFFIC CONTROL AND SAFETY NEEDS: |
|||
4. ROADWAY ALIGNMENT AND GRADE (ADEQUATE?): | |||
5. CHANNEL OR STRUCTURE ALIGNMENT CHANGES RECOMMENDED (SHOW ON COPY OF SITE PLAN): |
|||
6. ARE DIKES OR BANK PROTECTION REQUIRED TO CONTROL FLOW (SHOW ON COPY OF SITE PLAN): |
|||
7. DESCRIPTION OF ON-SITE CONSTRUCTION MATERIAL TO BE USED: |
|||
8. STORAGE AND/OR WASTE AREAS AVAILABLE FOR CONSTRUCTION (LOCATION, SIZE, AND DESCRIPTION): |
|||
9. WHAT IS THE MAXIMUM LENGTH (FEET) OF GIRDERS THAT CAN BE HAULED TO THE SITE? | |||
10. METHOD OF CONSTRUCTION: Contract/Force Account/Timber Purchaser | |||
11. OTHER REMARKS AND SPECIAL RECOMMENDATIONS: |
|||
G. FISH AND OTHER WILDLIFE PASSAGE CONSIDERATIONS | |||
1A. IS FISH PASSAGE REQUIRED? Yes/No | 1B. IF YES, WHAT SPECIES AND LIFE STAGES? | 2. IS PASSAGE FOR OTHER SPECIES REQUIRED? (TERRESTRIAL, CRAWLING, SWIMMING) Yes/No/Which? | |
3. SPECIAL/IMPORTANT CONSIDERATIONS FOR HABITAT PROTECTION? | |||
4. FOREST BIOLOGIST RECOMMENDATIONS: |
|||
PREPARED BY: |
DATE: | FOREST ENGINEER REVIEW: | DATE: |
FIELD SITE SKETCH, LONGITUDINAL PROFILE, AND CROSS-SECTIONS |