The Schedule of Proposed Actions (SOPA) contains a list of proposed actions for Idaho Panhandle National Forests that will soon begin or are currently undergoing environmental analysis and documentation. It provides information so that you can become aware of and indicate your interest in specific proposals. We encourage your early and ongoing involvement in any proposals of interest to you.

Sort by:

Idaho Panhandle National Forests Projects

Two temporary drill pads would be constructed to delineate a known mineral deposit. Drill pads would be 50' X 50' and would each include a 10'x10'x5' sump. The Auxer Mine portal would also be reestablished to facilitate future underground work.

Project will be designed to improve ecological/social conditions, including but not limited to improved forest health, reduced potential for high-intensity wildfires, improved watershed conditions, and sustainable recreation opportunities.

The project proposes to increase the application of prescribed fire across landscapes to reduce the risk of uncharacteristically severe and large wildfires, promote forest resiliency, and reduce impact risk on local communities and valued resources.

The proposed project would include the excavation of 10 exploratory trenches, 20' x 20', on the claim, the removal of the excavated material to an off-site location for testing and then backfilling and reclaiming each trench once testing is complete.

To reduce the risk of uncharacteristically severe wildfire and influence how wildfire and other disturbances shape the landscape the Forest Service proposes to authorize prescribed burns on up to 10,000 acres over the next 10 years.

Management of non-native invasive plant species utilizing herbicides, biological control agents, cultural and mechanical methods for weed control.

Reduce hazardous fuels and address the concerns of our communities and partners; the IPNF is considering activities that will create fuel breaks along private land, infrastructure, and egress routes adjacent to priority firesheds.

Vegetation management activities, including timber harvest, road construction, prescribed burning and tree planting.

The Comprehensive Plan will develop administrative and management goals, objectives and practices for public lands in Forest Service Regions 1 and Regions 6.

The project would replace a bridge, remove a road and bridge to improve habitat for Bull Trout

Reduce hazardous fuels through fuels and vegetation treatment in the vicinity of communities and values at risk to move forest health and ecological functions towards desired conditions and objectives identified in the 2015 Idaho Plan.

Daycon Minerals proposes to drill/core 4 holes on their mining claims on the Coeur d'Alene River Ranger District, using low-impact, environmentally friendly drilling techniques. Expected timeframe for operations is 3 months.

The Forest Service (FS) is considering a land exchange with Western Pacific Timber. The FS would receive approx. 40,000 acres of WPT land in the upper Lochsa River drainage and WPT would recieve an equal value of Forest Service land in north Idaho.