El Paso Natural Gas Company Standby Generator Installation
Authorize the construction of a new 6' x 6' cement pad for the installation of a 20kW propane generator to provide backup power during winter power outages to the existing communication facility.
Project Summary
Location Summary:
Located approximately 0.18 miles southwest of the Peaks Administrative office for the Flagstaff Ranger District and west of Highway 89.
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 11/25/2014 |
Decision | 12/2014 (Estimated) |
Implementation | 01/2015 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (3), 36 Cfr 220.6(E)(3)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Flagstaff Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations
Current Status:
Completed
Project Decision Information
El Paso Natural Gas Company Standby Generator Installation
Decision Signed Date: 12/15/2014
Forests:
Coconino National Forest
Districts:
Flagstaff Ranger District
States:
Arizona
Counties:
Coconino
Legal Land Description:
Section 6, T.21N., R.8E., G&SRM
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Steve Martinet
5075 N. Highway 89
Flagstaff, AZ 86005
928-527-3418
smartinet@fs.fed.us
Last Updated: 12/23/2014