Erosion Control Structure
Installation of erosion control structures to mitigate erosion, increase water infiltration into the soil, and retain sediment to which would promote herbaceous plant production.
Project Summary
Location Summary:
Miners Camp drainage is located off Forest Road 1013, off the 645-loop road; and Bear Canyon drainage located near the end of Forest Road 2326, north from Globe.
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 06/05/2025 |
Decision | 07/2025 (Estimated) |
Implementation | 10/2025 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (18), 36 Cfr 220.6(E)(18)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Globe Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Watershed Management
Project Activity:
Watershed Improvements
Current Status:
In Progress
Forests:
Tonto National Forest
Districts:
Globe Ranger District
States:
Arizona
Counties:
Gila
Legal Land Description:
Township 4N, Range 15.5E Section 4; Township 3N, Range 17E, Section 10.
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Andrea Wages
768 S. Sixshooter Canoyon Rd.
Globe, AZ 85501
928-402-6222
andrea.wages@usda.gov