Skip to main content

Ross Waterline Replacement

This project would involve installing 4,500 feet of high density polyethylene (HDPE) line in the Red Canyon recreation corridor. This includes the installation of components such as drains, valve boxes, air vents, and other water control devices.

Project Summary

Last Updated: 4/18/2025