Keddie Ridge Communication Site Generator Installation
Installation of an emergency backup propane 50kw generator on a new 4 ft.by 10 ft. concrete pad and a 500 gallon propane tank on a new 5ft.by 12 ft. concrete pad.
Project Summary
Location Summary:
Keddie Ridge
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 07/02/2013 |
Comment Period | 07/02/2013 |
Decision | 08/2013 (Estimated) |
Implementation | 09/2013 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (3), 36 Cfr 220.6(E)(3)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Eagle Lake Ranger District
Notice and Comment Regulation:
215
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations
Current Status:
Completed
Project Decision Information
Keddie Ridge Communication Site Generator Installation Project
Decision Signed Date: 08/02/2013
Legal Notice Date: 08/20/2013
Forests:
Lassen National Forest
Districts:
Eagle Lake Ranger District
States:
California
Counties:
Lassen
Legal Land Description:
T27N, R9E, section 6
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Nancy Barrera
477-050 Eagle Lake Road
Susanville, CA 96130
530-258-5107
nbarrera@fs.fed.us
Last Updated: 8/27/2013