Portland General Electric (PGE) Utility Line Tree Detachment Project
PGE is legislatively mandated to remove power line attached to trees. Therefore, PGE is proposing to remove approximately 250 electrical distribution lines from trees. This activity would require modification to the existing right of way.
Project Summary
Location Summary:
Recreation residence tract on the Zigzag Ranger District.
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 03/13/2025 |
Decision | 04/2025 (Estimated) |
Implementation | 05/2025 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (2), 36 Cfr 220.6(E)(2)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Zigzag Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Electric Transmission; Special Use Authorizations
Current Status:
Completed
Project Decision Information
Portland General Electric (PGE) Utility Line Tree Detachment Project
Decision Signed Date: 04/08/2025
Forests:
Mt. Hood National Forest
Districts:
Zigzag Ranger District
States:
Oregon
Counties:
Clackamas
Legal Land Description:
Not Applicable
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Jay Martin
70220 E. Highway 26
Zigzag, OR 97049
503-668-1476
Jay.Martin3@usda.gov
Last Updated: 4/22/2025