Puget Sound Energy (PSE) Powerline Reconstruction I-90
Issue PSE a 5-year special use permit to temporarily re-locate their power distribution lines that will be impacted for the duration of WSDOT's I-90 construction. PSE would reinstall a currently decommissioned single-phase overhead power line.
Project Summary
Location Summary:
South of I-90 milepost 61.5, line would run west to east from U-Fish road (FS-4823) approximately 200 feet north of the existing BPA transmission corridor.
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 05/10/2021 |
Decision | 09/2021 (Estimated) |
Implementation | 09/2021 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (2), 36 Cfr 220.6(E)(2)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Okanogan-Wenatchee National Forest All Units
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations
Current Status:
Completed
Project Decision Information
Puget Sound Energy (PSE) Powerline Reconstruction I-90
Decision Signed Date: 09/01/2021
Forests:
Okanogan-Wenatchee National Forest
Districts:
Cle Elum Ranger District
States:
Washington
Counties:
Kittitas
Legal Land Description:
Not Applicable
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Kimberly Larned
215 Melody Lane
Wenatchee, WA 98801
509-852-1062
klarned@fs.fed.us
Last Updated: 9/1/2021