Alger Delta - Sekol Inholding Powerline Install

Installation of underground electric beginning at an existing underground pedestal on the North side of Co Rd 440. From the pedestal via vibratory plow to 2 residents along an existing road right of way.

Project Summary

Last Updated: 6/30/2025