Fish Passage Case Studies
Bridge

Flash Player Link The Flash player is required to properly view each case study

Case Studies .: About .:. Evaluate

20 Mile Creek Link

20 Mile Creek Bridge Replacement with Step-Pools

   

Bridge with step-pool channel for grade control

Janes Creek Link

Janes Creek Roughened Channel over Dam

   

Roughened channel with prefabricated bridge to provide passage over dam and preserve impounded wetland

Cross Creek Link

Malibu Creek Submersible Bridge

   

Stream Simulation, submersible bridge with collapsible railings

Red Butte Bridge Link

Red Butte Creek Bridge Step-Pool Stream Simulation

   

Pre-Cast Concrete Bridge with Boulder Steps on Steep Stream

Toketa Creek Link

Tule Creek Bridge

   

Bridge Built with Precast Pre-stressed Concrete Beams

Wee Bridge Creek Link

Wee Burn Creek Modular Bridge

   

Stream Simulation with Modular Bridge