Fish Passage Case Studies
Low Water Crossing

Flash Player Link The Flash player is required to properly view each case study

Case Studies .: About .:. Evaluate

Consumes River Link

Consumes River Low-Water Crossing

   

Low-water crossing with added low-flow culvert

East Armuchee Planks Link

East Armuchee Creek Low-Water Crossing with Concrete Planks

   

Low-Water Crossing with Concrete Planks Buttressed by Concrete Median Barriers and Rock Weir

East Armuchee Cells Link

East Armuchee Creek Low-Water Crossing with Geocells

   

Low-Water Crossing Using Stone Filled Geocells

Weaver Creek Link

Malibu Creek Submersible Bridge

   

Stream Simulation, submersible bridge with collapsible railings

Mill Creek Link

Mill Creek Low Water Crossing with Embedding Box Culverts

   

Vented ford using three embedded box culverts sized to match bankfull width and depth.

Rocky Creek Link

Rocky Creek Low Water Crossing using Box Culverts

   

Vented Ford Using Three Box Culverts Sized to Match Bankfull Width and Depth