New Buildings Work Item Screen Features
- Legacy Tasks
- Easily identified by Cost Factor = 1
- Direction to close out all legacy tasks after one 5-year survey
cycle
- Check "Complete" box to close task
- Delete tasks that are converted to new condition survey form
tasks
- Delete tasks that are no longer needed or do not match new
Basic or Standard condition survey work items
- "Actual Dollars " and "Actual Finish" fields
are optional for local cost tracking
- Must populate "Estimated Travel Time" field on main
building form for correct Remoteness Factor to be applied to work
items
|