October 1998
2300
9823–2343–MTDC
Privacy | Legal
Back | Next | Cover Page
Home

Fee Deposit Tube Fabrication Drawing

Image of the plans for the fee deposit tube.

Manufacture and Procurement

The fabrication drawings provide the option of using a local fabricator to construct the fee tube, lowering unit costs. For example, the Boise National Forest uses a local Job Corps Center to fabricate its design. The cost of materials is estimated at $40 per vault. This does not include costs for handling, delivery, and installation. Even after these additional costs are considered, this method is less costly than purchasing most commercially made vaults.

Several commercial manufacturers produce fee vaults and collection equipment. Contact Gary Hoshide, Recreation Program Leader at MTDC, for information on commercially available vaults.

Acknowledgments

Special thanks to Ken Waugh, Boise National Forest, for submitting the project proposal and to Diane Herzberg, P.E., Mechanical Engineer, who led the initial project work at MTDC.


USDA Forest Service logo

mailbox icon  E-mail: wo_mtdc_webmaster@fs.fed.us

Back

Home
Forest Service Technology & Development logo
Missoula Technology &
Development Center


Visitor design graphic design graphic design graphic design graphic design graphic design graphic since April 24, 2003