Skip to main content

Grayson RECC Route 519 Distribution Line Upgrade Project

The project will involve granting a special use permit to Grayson RECC to upgrade the existing single-phase distribution line to a three-phase, 7200-volt line and rerouting the line from the existing right-of-way (ROW) to the State Route 519 corridor

Project Summary

Last Updated: 3/23/2010