Skip to main content

Citipower Gas Pipeline Special Use Permit Amendment #1

Construction of a 2-inch gas pipeline approximately 10,946 feet long with a right-of-way width of 10 feet wide equaling 2.5 acres. The pipeline would be buried within the existing roadways at a depth of 24 inches.

Project Summary

Last Updated: 11/15/2021