Collection: | Penobscot Experimental Forest Historical Photo Archive |
Keywords: |
MU90 MU91 MU92 MU93 Cutting Practice Level Study selection system commercial clearcut diameter-limit cut study results |
Location: | Penobscot Experimental Forest; Maine |
Description: | A graph depicting 30-year net production in MUs 90 through 93 after different treatments applied in the Cutting Practice Level Study |
Date: | 1980 |
Collection: | Penobscot Experimental Forest Historical Photo Archive |
Keywords: |
MU1 Cutting Practice Level Study diameter-limit cut |
Location: | Penobscot Experimental Forest; Maine |
Description: | Fair cutting practice (diameter-limit cutting) before cutting, in the Cutting Practice Level Study, in MU1 on August 20 1951 |
Date: | 8/20/1951 |