Schedule of Proposed Actions (SOPA) |
|||||
This report contains the best available information at the time of publication. Questions may be directed to the Project Contact. | |||||
Report Contents (click to jump to a section) : - Projects Occurring Nationwide - R3 - Southwestern Region, Carson National Forest, Forestwide (excluding Projects occurring in more than one Forest) - R3 - Southwestern Region, Carson National Forest, Camino Real Ranger District (excluding Projects occurring in more than one District) - R3 - Southwestern Region, Carson National Forest, Canjilon Ranger District (excluding Projects occurring in more than one District) - R3 - Southwestern Region, Carson National Forest, El Rito Ranger District (excluding Projects occurring in more than one District) - R3 - Southwestern Region, Carson National Forest, Jicarilla Ranger District (excluding Projects occurring in more than one District) - R3 - Southwestern Region, Carson National Forest, Questa Ranger District (excluding Projects occurring in more than one District) | |||||
Projects Occurring Nationwide |
|||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
---|---|---|---|---|---|
Locatable Mining Rule - 36 CFR 228, subpart A. EIS |
- Regulations, Directives, Orders | On Hold | N/A | N/A |
Sarah Shoemaker 907-586-7886 sarahshoemaker@fs.fed.us |
Description: The U.S. Department of Agriculture proposes revisions to its regulations at 36 CFR 228, Subpart A governing locatable minerals operations on National Forest System lands.A draft EIS & proposed rule should be available for review/comment in late 2020
Web Link: http://www.fs.usda.gov/project/?project=57214 |
|||||
Location: UNIT - All Districts-level Units. STATE - All States. COUNTY - All Counties. LEGAL - Not Applicable. These regulations apply to all NFS lands open to mineral entry under the US mining laws. More Information is available at: https://www.fs.usda.gov/science-technology/geology/minerals/locatable-minerals/current-revisions. | |||||
Nationwide Aerial Application of Fire Retardant on National Forest System Land. EIS *UPDATED* |
- Regulations, Directives, Orders |
In Progress: NOI in Federal Register 08/08/2020 Est. DEIS NOA in Federal Register 02/2022 |
Expected:06/2022 |
07/2022 |
Laura Conway 406-802-4317 laura.conway@usda.gov |
Description: Programmatic Supplemental EIS for the Nationwide Aerial Application of Fire Retardant on National Forest System Land.
Web Link: http://www.fs.usda.gov/project/?project=60450 |
|||||
Location: UNIT - All Districts-level Units. STATE - All States. COUNTY - All Counties. LEGAL - Not Applicable. The direction in the SEIS will apply to use of aerially delivered fire retardant on all National Forest System land. . | |||||
Back To Top | |||||
Carson National Forest, Forestwide (excluding Projects occurring in more than one Forest) |
R3 - Southwestern Region | ||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
Carson National Forest Revision of Land and Resource Management Plan EIS |
- Land management planning |
In Progress: Objection Period Legal Notice 09/02/2021 |
Expected:02/2022 |
03/2022 |
Peter Rich 575-758-6277 prich@fs.fed.us |
Description: Revision of the 1986 Carson National Forest Land and Resource Management Plan to update plan direction
Web Link: http://www.fs.usda.gov/goto/carsonforestplan |
|||||
Location: UNIT - Carson National Forest All Units. STATE - New Mexico. COUNTY - Colfax, Mora, Rio Arriba, Taos. LEGAL - Not Applicable. Carson National Forest. | |||||
Back To Top | |||||
Carson National Forest, Camino Real Ranger District (excluding Projects occurring in more than one District) |
R3 - Southwestern Region | ||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
Access Route and Maintenance for Encinal and La Sierra Acequia Users CE *NEW LISTING* |
- Special use management |
In Progress: Scoping Start 02/01/2022 |
Expected:03/2022 |
03/2022 |
Raul Hurtado 575-758-6344 raul.e.hurtado@usda.gov |
Description: This project will be for the authorization of an access route for the acequia group. The access route will be approximately .5 miles in length with the sole purpose of having an authorized route on file for getting to and from the headgate(s).
Web Link: http://www.fs.usda.gov/project/?project=61535 |
|||||
Location: UNIT - Camino Real Ranger District. STATE - New Mexico. COUNTY - Mora. LEGAL - T21N., R14E., Sections 16 and 17. The project will take place on the Camino Real Ranger District at the headgate of the acequia and stretch 0.5 miles to improve the access for users during irrigation season. | |||||
Acequia Madre del Rio Grande del Rancho and Acequia Finado Francisco Martinez Diversion Replacement CE *NEW LISTING* |
- Special use management |
In Progress: Scoping Start 02/17/2022 |
Expected:03/2022 |
04/2022 |
Raul Hurtado 575-758-6344 raul.e.hurtado@usda.gov |
Description: The proposed action includes a Special Use Permit that allows for the installation of a diversion dam, underground siphon, and foot bridge.
Web Link: http://www.fs.usda.gov/project/?project=61765 |
|||||
Location: UNIT - Camino Real Ranger District. STATE - New Mexico. COUNTY - Taos. LEGAL - Not Applicable. Township 24 N., Range 13E., Section 8. | |||||
Acequias de Las Trampas Diversion Dam Project CE *NEW LISTING* |
- Special use management |
In Progress: Scoping Start 02/17/2022 |
Expected:03/2022 |
04/2022 |
Raul Hurtado 575-758-6344 raul.e.hurtado@usda.gov |
Description: This project includes the installation of a diversion dam which will serve as a ditch head gate to capture water from the Las Trampas River and channel it to a ditch used by residents of the north side of the Las Trampas community for land irrigation
Web Link: http://www.fs.usda.gov/project/?project=61764 |
|||||
Location: UNIT - Camino Real Ranger District. STATE - New Mexico. COUNTY - Rio Arriba. LEGAL - Not Applicable. Township 22 N., Range 11E., Section 22. | |||||
Chapman Land Exchange CE *NEW LISTING* |
- Special use management |
In Progress: Scoping Start 02/01/2022 |
Expected:03/2022 |
03/2022 |
Paul Schilke 928-339-5052 paul.schilke@usda.gov |
Description: On the western edge of the community of Las Mochas, exchange a small piece of National Forest System land from the north side of a house, and receive land from west side of the same house.
Web Link: http://www.fs.usda.gov/project/?project=61539 |
|||||
Location: UNIT - Camino Real Ranger District. STATE - New Mexico. COUNTY - Taos. LEGAL - T.22N., R.13E., Sections 4 and 9. The project will take place on the Camino Real Ranger District on the western edge of the community of Las Mochas. | |||||
Holman Hill Fiber Optic Installation CE |
- Special use management | On Hold | N/A | N/A |
Paul Schilke 575-587-2255 comments-southwestern-carson-caminoreal@fs.fed.us |
Description: The Carson National Forest proposes to issue a special use permit to La Jicarita Rural Telephone Cooperative for installation of app. 1/4 mile of fiber optic cable, buried in a trench measuring app. 12" by 36", with a maintenance Right-of-Way of 15'.
Web Link: http://www.fs.usda.gov/project/?project=55792 |
|||||
Location: UNIT - Camino Real Ranger District. STATE - New Mexico. COUNTY - Mora, Taos. LEGAL - T 21N, R 14E, Section 10, NMPM. Just south of Highway 518, staddling the Taos and Mora county lines. | |||||
Luna Fire Reforestation Research Proposal CE *NEW LISTING* |
- Special use management |
In Progress: Scoping Start 02/01/2022 |
Expected:03/2022 |
03/2022 |
Gabriel Romero 575-587-2255 gabriel.romero@usda.gov |
Description: The purpose of this project is to implement and assess the use of artificial regeneration techniques to best identify silvicultural practices that will improve the establishment of aspen and ponderosa pine seedlings on post-fire forest sites.
Web Link: http://www.fs.usda.gov/project/?project=61547 |
|||||
Location: UNIT - Camino Real Ranger District. STATE - New Mexico. COUNTY - Mora. LEGAL - T23N R15E sections 4-5, 8-10, 15-17 & 21-22. T23N R15E Sections 4-5, 8-10, 15-17 & 21-22. | |||||
McGaffey Forest and Rio Grande del Rancho Watershed Restoration EA |
- Vegetation management (other than forest products) - Fuels management - Watershed management |
In Progress: Scoping Start 01/24/2018 Est. Comment Period Public Notice 03/2022 |
Expected:06/2022 |
07/2022 |
Gabriel Romero 575-587-2255 comments-southwestern-carson-caminoreal@fs.fed.us |
Description: Part of Taos Valley Watershed Coalition's Landscape Restoration Strategy, the project proposes to re-establish fire-adapted forests, reduce the threat of severe effects from wildfire, provide wood products to communities, and improve wildlife habitat
Web Link: http://www.fs.usda.gov/project/?project=52579 |
|||||
Location: UNIT - Camino Real Ranger District. STATE - New Mexico. COUNTY - Taos. LEGAL - T23N R12E sections 1, 11-14, &23-24; T23N R13E sections 2-11, 14-23, & 26-29; T24N R12E sections 13, 24-45, & 36; and T24N R13E sections 8-9 & 16-36; NMPM. Located on both side of Highway 518, from the National Forest boundary on the north to US. Hill on the south and from Miranda Arroyo on the west to Bear Wallow Ridge and Maestas Ridge on the east. | |||||
Tomas Martinez Road Access CE *NEW LISTING* |
- Special use management |
In Progress: Scoping Start 02/01/2022 |
Expected:03/2022 |
03/2022 |
Ricardo Leon 575-758-8678 ricardo.leon@usda.gov |
Description: The purpose of this project will allow the private landowner to reconstruct and maintain 0.25 miles of existing road to access their private land.
Web Link: http://www.fs.usda.gov/project/?project=61536 |
|||||
Location: UNIT - Camino Real Ranger District. STATE - New Mexico. COUNTY - Taos. LEGAL - T22N, R14E, Sec 11. The project will take place on the Camino Real Ranger District. | |||||
Back To Top | |||||
Carson National Forest, Canjilon Ranger District (excluding Projects occurring in more than one District) |
R3 - Southwestern Region | ||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
NORA 69 KV Line Upgrade and Permit Renewal CE *UPDATED* |
- Special use management | Completed | Actual: 01/19/2022 | 02/2022 |
Ricardo Leon 575-758-8678 ricardo.leon@usda.gov |
Description: The proposed action is to increase the right-of-way to 50 feet from the centerline of the existing utility infrastructure and allow for the replacement of approximately 10.5 miles of 69 kilovolt (kV).
Web Link: http://www.fs.usda.gov/project/?project=60865 |
|||||
Location: UNIT - Canjilon Ranger District. STATE - New Mexico. COUNTY - Rio Arriba. LEGAL - T.24N., R.4E., 23 Sections 10, 9, 4 and T.25N., R.4E., 23 Sections 3, 28, 27, 22, 15, 14, 11, 1 and T.26N., R.4E., 23 Sections 25, 4, 13, 12, 1 and T.27N., R.4E., 23 Section 35. The project would occur on the Canjilon Ranger District within the current existing right-of-way, which parallels U.S. Highway 84 from Cebolla to Ghost Ranch. | |||||
Back To Top | |||||
Carson National Forest, El Rito Ranger District (excluding Projects occurring in more than one District) |
R3 - Southwestern Region | ||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
Vallecitos West Acequia Headgate Installation CE *NEW LISTING* |
- Special use management |
In Progress: Scoping Start 02/01/2022 |
Expected:03/2022 |
03/2022 |
Raul Hurtado 575-758-6344 raul.e.hurtado@usda.gov |
Description: This project will be to authorize the installation of a new headgate system in the river to help with controlling the flow and level of water getting in and out of the Vallecitos West acequia.
Web Link: http://www.fs.usda.gov/project/?project=61530 |
|||||
Location: UNIT - El Rito Ranger District. STATE - New Mexico. COUNTY - Rio Arriba. LEGAL - T26N., R8E., Section 5 and 6. The project will take place on the El Rito Ranger District at the existing headgate location of the Vallecitos West Acequia. | |||||
Back To Top | |||||
Carson National Forest, Jicarilla Ranger District (excluding Projects occurring in more than one District) |
R3 - Southwestern Region | ||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
Jicarilla Ponderosa Pine Restoration CE |
- Wildlife, Fish, Rare plants - Fuels management - Watershed management |
On Hold | N/A | N/A |
Cynthia Campbell 505-632-2956 cicampbell@fs.fed.us |
Description: The Jicarilla RD is proposing to treat, mechanically or with prescribed fire approximately 33,292 acres of predominately Ponderosa pine to restore healthy timber stands, improve wildlife habitat, and reduce fire danger.
Web Link: http://www.fs.usda.gov/project/?project=54490 |
|||||
Location: UNIT - Jicarilla Ranger District. STATE - New Mexico. COUNTY - Rio Arriba. LEGAL - Not Applicable. Carson National Forest, Jicarilla Ranger District. Proposed project is spread throughout the district within Ponderosa pine ecosystems. | |||||
Valencia Wildlife Tank Project CE |
- Wildlife, Fish, Rare plants | Completed | Actual: 10/14/2021 | 10/2021 |
Willis Sylvest 505-632-2956 willis.sylvest@usda.gov |
Description: Proposed project would construct an earthen tank to provide water for wildlife. The proposed tank would be approximately .75 acres in size, with an approximately 2.8 acre construction zone around the tank built by mechanized equipment.
Web Link: http://www.fs.usda.gov/project/?project=60794 |
|||||
Location: UNIT - Jicarilla Ranger District. STATE - New Mexico. COUNTY - Rio Arriba. LEGAL - Township 28 North, Range 11 W, Section 4. Located on the Jicarilla Ranger District of the Carson National Forest, adjacent to Forest Road 314 within the Ciruelas Canyon-Arroyo Companero watershed. | |||||
Williams Four Corners, LLC (WFC) Special Use Authorization, Oil and Gas Pipeline CE |
- Special use management |
In Progress: Scoping Start 04/08/2013 |
Expected:12/2021 |
01/2022 |
Jon Miller 505-632-2956x77240 jjmiller@fs.fed.us |
Description: The Forest Service is proposing to approve an application for a special use authorization, submitted by WFC. The special use authorization would allow WFC to operate and maintain an existing natural gas pipeline and associated infrastructure system.
Web Link: http://www.fs.usda.gov/project/?project=41925 |
|||||
Location: UNIT - Jicarilla Ranger District. STATE - New Mexico. COUNTY - Rio Arriba. LEGAL - Township (T) 27 N, Range (R) 4 W; T28N, R4W; T29N, R4W; T29N, R5W; T30N, R4W; T30N, R5W; T31N, R4W; T31N, R5W; and T32N, R5W. Jicarilla Ranger District. | |||||
Back To Top | |||||
Carson National Forest, Questa Ranger District (excluding Projects occurring in more than one District) |
R3 - Southwestern Region | ||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
Ponil Creek Watershed Collaborative Landscape Restoration EA |
- Vegetation management (other than forest products) - Fuels management |
On Hold | N/A | N/A |
George Long 575-586-0520 comments-southwestern-carson-questa@fs.fed.us |
Description: Landscape restoration on up to 64,528 acres in Colfax County, in order to promote conditions that are resilient to uncharacteristic disturbances from wildfire, insects, disease, and climatic variability.
Web Link: http://www.fs.usda.gov/project/?project=52158 |
|||||
Location: UNIT - Questa Ranger District. STATE - New Mexico. COUNTY - Colfax. LEGAL - T28N R16E 1-4, 9-11, 15-16; R17E: 2-6, 9-11, 14-15; T29N R16E: 1-4, 10-15, 21-29, 32-36; R17E: 1-24, 26-35; R18E: 4-9, 18-19; T30N R16E: 2-3, 9-11, 14-16, 21-28, 33-36; R17E: 19-23, 25-36; R18E: 31-32. Project would occur on 58,954 acres of NFS lands on the eastern half of the Valle Vidal, and on 5,574 acres of the Elliot Barker Wildlife Area, administered by NM Department of Game & Fish. | |||||
Taos Ski Valley Gondola and Other Improvements EA *NEW LISTING* |
- Recreation management - Special use management |
Developing Proposal Est. Scoping Start 04/2022 |
Expected:12/2022 | 04/2023 |
Paul Schilke 928-339-5052 paul.schilke@usda.gov |
Description: Taos Ski Valley proposes a new gondola, on-mountain restaurant, water storage, booster station, snowmaking pipe, Nordic trails, snowshoe trails, and a support facility. Lift 2, Lift 8, and a relocated Whistlestop Cafe are proposed to be replaced.
Web Link: http://www.fs.usda.gov/project/?project=61390 |
|||||
Location: UNIT - Questa Ranger District. STATE - New Mexico. COUNTY - Taos. LEGAL - Not Applicable. Taos Ski Valley, New Mexico. | |||||
Town of Red River Water System and Sewer Line Installation for Tall Pines CE *NEW LISTING* |
- Special use management |
In Progress: Scoping Start 02/01/2022 |
Expected:03/2022 |
03/2022 |
Raul Hurtado 575-758-6344 raul.e.hurtado@usda.gov |
Description: The proposed improvements consist of new water and sewer lines. It will connect to residents that currently have private wells and septic systems to the Town of Red River's utilities.
Web Link: http://www.fs.usda.gov/project/?project=61538 |
|||||
Location: UNIT - Questa Ranger District. STATE - New Mexico. COUNTY - Taos. LEGAL - T28N., R15E., Sections 6 and 7. The project will take place on the Questa Ranger District in the Town of Red River. | |||||
In accordance with Federal civil rights law and U.S. Department of Agriculture (USDA) civil rights regulations and policies, the USDA, its Agencies, offices, and employees, and institutions participating in or administering USDA programs are prohibited from discriminating based on race, color, national origin, religion, sex, gender identity (including gender expression), sexual orientation, disability, age, marital status, family/parental status, income derived from a public assistance program, political beliefs, or reprisal or retaliation for prior civil rights activity, in any program or activity conducted or funded by USDA (not all bases apply to all programs). Remedies and complaint filing deadlines vary by program or incident.
Persons with disabilities who require alternative means of communication for program information (e.g., Braille, large print, audiotape, American Sign Language, etc.) should contact the responsible Agency or USDA’s TARGET Center at (202) 720-2600 (voice and TTY) or contact USDA through the Federal Relay Service at (800) 877-8339. Additionally, program information may be made available in languages other than English. To file a program discrimination complaint, complete the USDA Program Discrimination Complaint Form, AD-3027, found online at http://www.ascr.usda.gov/complaint_filing_cust.html and at any USDA office or write a letter addressed to USDA and provide in the letter all of the information requested in the form. To request a copy of the complaint form, call (866) 632-9992. Submit your completed form or letter to USDA by: (1) mail: U.S. Department of Agriculture Office of the Assistant Secretary for Civil Rights 1400 Independence Avenue, SW Washington, D.C. 20250-9410; (2) fax: (202) 690-7442; or (3) email: program.intake@usda.gov. USDA is an equal opportunity provider, employer, and lender. |