Schedule of Proposed Actions (SOPA) |
|||||
| This report contains the best available information at the time of publication. Questions may be directed to the Project Contact. | |||||
|
Report Contents (click to jump to a section) : - Projects Occurring Nationwide - R9 - Eastern Region, Green Mountain And Finger Lakes National Forests, Forestwide (excluding Projects occurring in more than one Forest) - R9 - Eastern Region, Green Mountain And Finger Lakes National Forests, Occurring in more than one District (excluding Forestwide) - R9 - Eastern Region, Green Mountain And Finger Lakes National Forests, Hector Ranger District (excluding Projects occurring in more than one District) - R9 - Eastern Region, Green Mountain And Finger Lakes National Forests, Manchester Ranger District (excluding Projects occurring in more than one District) - R9 - Eastern Region, Green Mountain And Finger Lakes National Forests, Middlebury Ranger District (excluding Projects occurring in more than one District) - R9 - Eastern Region, Green Mountain And Finger Lakes National Forests, Rochester Ranger District (excluding Projects occurring in more than one District) | |||||
Projects Occurring Nationwide |
|||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|---|---|---|---|---|---|
|
Locatable Mining Rule - 36 CFR 228, subpart A. EIS |
- Regulations, Directives, Orders | On Hold | N/A | N/A |
Sarah Shoemaker 907-586-7886 sarahshoemaker@fs.fed.us |
| Description: The U.S. Department of Agriculture proposes revisions to its regulations at 36 CFR 228, Subpart A governing locatable minerals operations on National Forest System lands.A draft EIS & proposed rule should be available for review/comment in late 2020
Web Link: http://www.fs.usda.gov/project/?project=57214 |
|||||
| Location: UNIT - All Districts-level Units. STATE - All States. COUNTY - All Counties. LEGAL - Not Applicable. These regulations apply to all NFS lands open to mineral entry under the US mining laws. More Information is available at: https://www.fs.usda.gov/science-technology/geology/minerals/locatable-minerals/current-revisions. | |||||
|
Nationwide Aerial Application of Fire Retardant on National Forest System Land. EIS |
- Regulations, Directives, Orders |
In Progress: NOI in Federal Register 08/08/2020 Est. DEIS NOA in Federal Register 02/2022 |
Expected:06/2022 |
07/2022 |
Laura Conway 406-802-4317 laura.conway@usda.gov |
| Description: Programmatic Supplemental EIS for the Nationwide Aerial Application of Fire Retardant on National Forest System Land.
Web Link: http://www.fs.usda.gov/project/?project=60450 |
|||||
| Location: UNIT - All Districts-level Units. STATE - All States. COUNTY - All Counties. LEGAL - Not Applicable. The direction in the SEIS will apply to use of aerially delivered fire retardant on all National Forest System land. . | |||||
| Back To Top | |||||
Green Mountain And Finger Lakes National Forests, Forestwide (excluding Projects occurring in more than one Forest) |
R9 - Eastern Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
Green Mountain National Forest Opening Maintenance CE *UPDATED* |
- Wildlife, Fish, Rare plants - Fuels management |
Developing Proposal Est. Scoping Start 08/2022 |
Expected:09/2022 | 10/2022 |
Scott Wixsom 802-362-2307 x7219 scott.wixsom@usda.gov |
| Description: This project would authorize continuing management of permanent openings in 264 stands on the Green Mountain National Forest.
Web Link: http://www.fs.usda.gov/project/?project=61917 |
|||||
| Location: UNIT - Green Mountain And Finger Lakes National Forest All Units. STATE - Vermont. COUNTY - Addison, Bennington, Rutland, Washington, Windham, Windsor. LEGAL - Not Applicable. Several Towns throughout Vermont. | |||||
|
New Jersey Legacy Tract Multi-Resource Management Plan CE *UPDATED* |
- Land management planning |
In Progress: Scoping Start 10/01/2021 |
Expected:09/2022 |
09/2022 |
Jay Strand 802-767-4261 x5522 jay.strand@usda.gov |
| Description: Complete a multi-resource management plan for an 145-acre New Jersey tract purchased via the Legacy Tract Program. Although under USDA Forest Service jurisdiction, management will be provided by the New Jersey Department of Environmental Protection.
Web Link: http://www.fs.usda.gov/project/?project=60862 |
|||||
| Location: UNIT - Green Mountain And Finger Lakes National Forest All Units. STATE - Vermont. COUNTY - Rutland. LEGAL - Not Applicable. New Jersey, Jefferson Township, Morris County. | |||||
| Back To Top | |||||
Green Mountain And Finger Lakes National Forests, Occurring in more than one District (excluding Forestwide) |
R9 - Eastern Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
Telephone Gap Integrated Resource Project EA *UPDATED* |
- Recreation management - Wildlife, Fish, Rare plants - Forest products - Vegetation management (other than forest products) - Watershed management - Road management - Climate Change Adaptation |
Developing Proposal Est. Scoping Start 07/2022 |
Expected:05/2023 | 06/2023 |
Shawn Langston 802-747-6743 Shawn.Langston@usda.gov |
| Description: Multiple resource management to implement the Forest Plan across a large landscape area. Potential activities include timber harvesting, wildlife & fisheries habitat improvement, recreation & forest access opportunities, and restoration work.
Web Link: http://www.fs.usda.gov/project/?project=60192 |
|||||
| Location: UNIT - Middlebury Ranger District, Rochester Ranger District. STATE - Vermont. COUNTY - Addison, Rutland, Windsor. LEGAL - Not Applicable. Towns of Chittenden, Goshen, Killington, Mendon, Pittsfield, Pittsford, Rutland Town, and Stockbridge. | |||||
| Back To Top | |||||
Green Mountain And Finger Lakes National Forests, Hector Ranger District (excluding Projects occurring in more than one District) |
R9 - Eastern Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
Blueberry Patch Restoration CE *NEW LISTING* |
- Recreation management - Road management |
Developing Proposal Est. Scoping Start 07/2022 |
Expected:08/2022 | 08/2022 |
Matthew Lark 479-667-2191 ext 2171 matthew.lark@usda.gov |
| Description: This project would maintain and restore the blueberry patch at the Blueberry Patch Campground. The desired outcome is to re-invigorate the patch, plant new blueberry shrubs, and increase health and productivity.
Web Link: http://www.fs.usda.gov/project/?project=62431 |
|||||
| Location: UNIT - Hector Ranger District. STATE - New York. COUNTY - Schuyler. LEGAL - Not Applicable. Town of Hector. | |||||
|
Drainage Tile Breakup CE *UPDATED* |
- Watershed management | On Hold | N/A | N/A |
Angelica Quintana 802-747-6742 angelica.quintana@usda.gov |
| Description: The project purpose is to rehabilitate and restore natural soil water drainage rates by breaking up drainage tiles.
Web Link: http://www.fs.usda.gov/project/?project=59253 |
|||||
| Location: UNIT - Hector Ranger District. STATE - New York. COUNTY - Schuyler. LEGAL - Not Applicable. Town of Hector. | |||||
|
Dunham Trail Shelter Vista Restoration CE *NEW LISTING* |
- Recreation management |
Developing Proposal Est. Scoping Start 07/2022 |
Expected:10/2022 | 04/2023 |
Matthew Kautz 607-546-4470 x3319 matthew.kautz@usda.gov |
| Description: This project would restore a scenic vista that previously existed at the Dunham Shelter on the Finger Lakes Trail. The vista has not been maintained in many years and now has brush and trees blocking the scenic view from the trail shelter.
Web Link: http://www.fs.usda.gov/project/?project=62432 |
|||||
| Location: UNIT - Hector Ranger District. STATE - New York. COUNTY - Schuyler. LEGAL - Not Applicable. Town of Hector. | |||||
|
Dunn Road Water Control Structure Replacement CE *UPDATED* |
- Watershed management | On Hold | N/A | N/A |
Gregory Flood 607-546-4470 gregory.flood@usda.gov |
| Description: The purpose of this project is to replace the failing water control structure on the pond/wetland along Dunn Road and enhance the pond/wetland by dredging.
Web Link: http://www.fs.usda.gov/project/?project=59254 |
|||||
| Location: UNIT - Hector Ranger District. STATE - New York. COUNTY - Seneca. LEGAL - Not Applicable. Along Dunn Road in the Town of Covert. | |||||
|
Foster Pond Parking Area Expansion CE *NEW LISTING* |
- Recreation management - Facility management - Road management |
Developing Proposal Est. Scoping Start 07/2022 |
Expected:10/2022 | 04/2023 |
Matthew Kautz 607-546-4470 x3319 matthew.kautz@usda.gov |
| Description: This project would expand the current parking area to allow for a greater number of vehicles. Current design allows for four vehicles to safely park in the parking area. Our goal would be to expand the parking lot to accommodate 10 vehicles.
Web Link: http://www.fs.usda.gov/project/?project=62433 |
|||||
| Location: UNIT - Hector Ranger District. STATE - New York. COUNTY - Schuyler. LEGAL - Not Applicable. Town of Hector. | |||||
|
Satterly Hill and Smith West Field Tilling CE *UPDATED* |
- Vegetation management (other than forest products) |
Developing Proposal Est. Scoping Start 07/2022 |
Expected:09/2022 | 04/2023 |
Gregory Flood 607-546-4470 gregory.flood@usda.gov |
| Description: The purpose of this project is to till and smooth fields to allow for desired future management. Old grape vineyard rows are present in the fields, which makes mowing and burning operations for grassland management very difficult.
Web Link: http://www.fs.usda.gov/project/?project=59255 |
|||||
| Location: UNIT - Hector Ranger District. STATE - New York. COUNTY - Schuyler. LEGAL - Not Applicable. Town of Hector. | |||||
|
Water Control Structure Replacements CE *UPDATED* |
- Watershed management | Completed | Actual: 01/14/2022 | 04/2022 |
Gregory Flood 607-546-4470 gregory.flood@usda.gov |
| Description: This project would replace the deteriorating or failing water control structures at 8 ponds with new functional water control structures and associated plumbing. The ponds would then be dredged to reduce sediment levels.
Web Link: http://www.fs.usda.gov/project/?project=61074 |
|||||
| Location: UNIT - Hector Ranger District. STATE - New York. COUNTY - Schuyler, Seneca. LEGAL - Not Applicable. Towns of Lodi and Hector. | |||||
| Back To Top | |||||
Green Mountain And Finger Lakes National Forests, Manchester Ranger District (excluding Projects occurring in more than one District) |
R9 - Eastern Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
Dutch Hill Glade Additions CE *UPDATED* |
- Recreation management |
In Progress: Scoping Start 06/28/2022 |
Expected:09/2022 |
11/2022 |
Danna Strout 802-362-2307 ext 7237 danna.strout@usda.gov |
| Description: The project would create additional glades on the southern portion of Dutch Hill backcountry ski area to provide terrain for recreation and clear vegetation for vista improvement near the summit of Dutch Hill.
Web Link: http://www.fs.usda.gov/project/?project=61906 |
|||||
| Location: UNIT - Manchester Ranger District. STATE - Vermont. COUNTY - Bennington. LEGAL - Not Applicable. Town of Readsboro. | |||||
|
Green Mountain Power - Peru Construction Permit CE *NEW LISTING* |
- Special use management |
Developing Proposal Est. Scoping Start 07/2022 |
Expected:08/2022 | 10/2022 |
Jennifer Edmonds 802-747-6746 jennifer.edmonds@usda.gov |
| Description: This project would issue a SUP with a term of 5 years to Green Mountain Power, authorizing them to construct approximately 3,120 feet of underground powerline, five junction boxes, and 1,080 feet of new above-ground line.
Web Link: http://www.fs.usda.gov/project/?project=62435 |
|||||
| Location: UNIT - Manchester Ranger District. STATE - Vermont. COUNTY - Bennington. LEGAL - Not Applicable. Town of Peru. | |||||
|
Lauzon & Sausville Wilderness Road Right-Of-Way Permit Reauthorization CE *NEW LISTING* |
- Special use management |
Developing Proposal Est. Scoping Start 07/2022 |
Expected:09/2022 | 09/2022 |
Jennifer Edmonds 802-747-6746 jennifer.edmonds@usda.gov |
| Description: This project would reauthorize the use of a three-mile long road within the Glastenbury Wilderness to access two private inholdings. No new road construction would occur.
Web Link: http://www.fs.usda.gov/project/?project=62436 |
|||||
| Location: UNIT - Manchester Ranger District. STATE - Vermont. COUNTY - Bennington. LEGAL - Not Applicable. Towns of Woodford and Glastenbury. | |||||
|
Lye Brook Trailhead Parking Relocation CE *UPDATED* |
- Recreation management |
Developing Proposal Est. Scoping Start 09/2022 |
Expected:02/2023 | 04/2023 |
Danna Strout 802-362-2307 ext 7237 danna.strout@usda.gov |
| Description: The Lye Brook Trailhead parking area would be relocated on Lye Brook Road near its intersection with Benson and Glen Roads. The new parking lot would accommodate 30 to 40 vehicles.
Web Link: http://www.fs.usda.gov/project/?project=61176 |
|||||
| Location: UNIT - Manchester Ranger District. STATE - Vermont. COUNTY - Bennington. LEGAL - Not Applicable. Town of Manchester. | |||||
|
Manchester Trail Bridge Replacements CE *UPDATED* |
- Recreation management | Completed | Actual: 06/21/2022 | 09/2022 |
Danna Strout 802-362-2307 x7237 danna.strout@usda.gov |
| Description: Three trail bridges on the Manchester Ranger District would be replaced due to their poor structural integrity and to provide trail users with a safe and enjoyable route over water crossings.
Web Link: http://www.fs.usda.gov/project/?project=61078 |
|||||
| Location: UNIT - Manchester Ranger District. STATE - Vermont. COUNTY - Bennington, Windham. LEGAL - Not Applicable. Towns of Winhall and Dover. | |||||
|
Minvera Hinchey Shelter Area Management CE *UPDATED* |
- Recreation management - Facility management |
In Progress: Scoping Start 06/22/2022 |
Expected:09/2022 |
09/2022 |
Danna Strout 802-362-2307 ext 7237 danna.strout@usda.gov |
| Description: The project would relocate the Minerva Hinchey Shelter onto National Forest land, construct a new moldering toilet, and decommission an unauthorized trail network near the shelter.
Web Link: http://www.fs.usda.gov/project/?project=61908 |
|||||
| Location: UNIT - Manchester Ranger District. STATE - Vermont. COUNTY - Rutland. LEGAL - Not Applicable. Town of Shrewsbury. | |||||
|
Prospect Mountain Trail Improvements CE *UPDATED* |
- Recreation management | Completed | Actual: 03/31/2022 | 04/2022 |
Jeffrey Hammell 802-222-1828 jeffrey.hammell@usda.gov |
| Description: The project would construct new Nordic ski trail segments, widen existing trails, and install culverts to relieve trail congestion, increase skier safety, and enhance the recreational experience at Prospect Mountain.
Web Link: http://www.fs.usda.gov/project/?project=61080 |
|||||
| Location: UNIT - Manchester Ranger District. STATE - Vermont. COUNTY - Bennington. LEGAL - Not Applicable. Town of Woodford. | |||||
|
Spruce Peak VAST Trail Additions CE *UPDATED* |
- Recreation management | Cancelled | N/A | N/A |
Robert Abrams 802-362-2307 x7725 robert.abrams@usda.gov |
| Description: Add two sections of existing snowmobile trail totaling about 1.1 miles in use and maintained by the VT Association of Snow Travelers (VAST) to the Forest Service trail system. (Cancelled due to storm damage)
Web Link: http://www.fs.usda.gov/project/?project=56382 |
|||||
| Location: UNIT - Manchester Ranger District. STATE - Vermont. COUNTY - Bennington. LEGAL - Not Applicable. Towns of Winhall and Manchester. | |||||
|
Sucker Pond Trail Relocation CE *UPDATED* |
- Recreation management |
Developing Proposal Est. Scoping Start 02/2023 |
Expected:04/2023 | 10/2023 |
Danna Strout 802-362-2307 x7237 danna.strout@usda.gov |
| Description: The project would involve constructing approximately 0.3 miles of 6-foot-wide trail tread south of Sucker Pond to relocate this section of trail out of a wetland and into a more suitable area for multiple trail uses.
Web Link: http://www.fs.usda.gov/project/?project=61081 |
|||||
| Location: UNIT - Manchester Ranger District. STATE - Vermont. COUNTY - Bennington. LEGAL - Not Applicable. Town of Stamford. | |||||
|
White Oak Planting CE *UPDATED* |
- Research and Development |
In Progress: Scoping Start 03/22/2022 |
Expected:07/2022 |
08/2022 |
Jeffrey Tilley 802-272-4852 jeffrey.tilley@usda.gov |
| Description: The purpose of this project is to establish white oak seedlings in a genetic test to evaluate which parents produce high quality seedlings, and which sources of white oak are best adapted to this site.
Web Link: http://www.fs.usda.gov/project/?project=61092 |
|||||
| Location: UNIT - Manchester Ranger District. STATE - Vermont. COUNTY - Bennington. LEGAL - Not Applicable. Town of Dorset. | |||||
|
Wilcox Special Use Permit Amendment CE *UPDATED* |
- Special use management | On Hold | N/A | N/A |
Jennifer Edmonds 802-747-6746 jennifer.edmonds@usda.gov |
| Description: This project would consist of the issuance of a special use permit amendment to the Wilcox Cultivation Permit. The amendment would allow Mr. Wilcox to cultivate the 8.3 acre field adjacent to his current permit area.
Web Link: http://www.fs.usda.gov/project/?project=57935 |
|||||
| Location: UNIT - Manchester Ranger District. STATE - Vermont. COUNTY - Bennington. LEGAL - Not Applicable. Town of Manchester. | |||||
| Back To Top | |||||
Green Mountain And Finger Lakes National Forests, Middlebury Ranger District (excluding Projects occurring in more than one District) |
R9 - Eastern Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
2021 Maple Tapping Special Use Permits EA *UPDATED* |
- Special use management |
In Progress: Scoping Start 06/01/2021 Est. Comment Period Public Notice 08/2022 |
Expected:11/2022 |
11/2022 |
Jennifer Edmonds 802-747-6746 jennifer.edmonds@usda.gov |
| Description: The proposed action would authorize three maple tapping operations which have requested forest product special use permits to begin or expand operations.
Web Link: http://www.fs.usda.gov/project/?project=60183 |
|||||
| Location: UNIT - Middlebury Ranger District. STATE - Vermont. COUNTY - Addison. LEGAL - Not Applicable. Town of Lincoln. | |||||
|
Goshen Dam Spillway Permit Amendment CE *UPDATED* |
- Special use management | Completed | Actual: 03/24/2022 | 04/2022 |
Jennifer Edmonds 802-747-6746 jennifer.edmonds@usda.gov |
| Description: The proposed action is to amend the Goshen Dam Spillway permit (ROC365) in include an additional 0.5 acres to the permit area for the check dams (see project map), and to amend the expiration date to December 31, 2026.
Web Link: http://www.fs.usda.gov/project/?project=61099 |
|||||
| Location: UNIT - Middlebury Ranger District. STATE - Vermont. COUNTY - Addison. LEGAL - Not Applicable. Town of Goshen. | |||||
|
Middlebury College Land Exchange CE *UPDATED* |
- Land ownership management |
In Progress: Scoping Start 04/01/2021 |
Expected:08/2022 |
08/2022 |
Christopher Mattrick 802-767-4261 x5513 christopher.mattrick@usda.gov |
| Description: The Forest Service proposes to exchange an approximately 475 acre tract of land on the GMNF for approximately 402 acres of land owned by Middlebury College in the Breadloaf area of Ripton, Vermont.
Web Link: http://www.fs.usda.gov/project/?project=59518 |
|||||
| Location: UNIT - Middlebury Ranger District. STATE - Vermont. COUNTY - Addison. LEGAL - Not Applicable. Town of Ripton. | |||||
|
Middlebury Office Administrative Site Conveyance CE *UPDATED* |
- Land ownership management - Facility management |
In Progress: Scoping Start 03/03/2021 |
Expected:08/2022 |
08/2022 |
Christopher Mattrick 802-767-4261 x5513 christopher.mattrick@usda.gov |
| Description: This project consists of the closure and conveyance of the Middlebury Office Administrative Site to reduce and align facilities and infrastructure with current staffing and budget levels.
Web Link: http://www.fs.usda.gov/project/?project=59628 |
|||||
| Location: UNIT - Middlebury Ranger District. STATE - Vermont. COUNTY - Addison. LEGAL - Not Applicable. Town of Middlebury. | |||||
|
Moosalamoo-Silver Lake Connector Trail CE *UPDATED* |
- Recreation management |
Developing Proposal Est. Scoping Start 07/2022 |
Expected:08/2022 | 08/2022 |
David Nulsen 802-767-4261 ext 5533 david.nulsen@usda.gov |
| Description: The project would construct and maintain a nonmotorized recreation trail between Silver Lake and the Moosalamoo Campground.
Web Link: http://www.fs.usda.gov/project/?project=61909 |
|||||
| Location: UNIT - Middlebury Ranger District. STATE - Vermont. COUNTY - Addison. LEGAL - Not Applicable. Towns of Goshen, Salisbury, and Leicester. | |||||
|
Silver Lake Hut Construction and Operations CE *UPDATED* |
- Recreation management - Special use management - Facility management |
In Progress: Scoping Start 05/26/2022 |
Expected:09/2022 |
03/2023 |
Philip MacAskill 802-767-4261 ext. 5530 philip.macaskill@usda.gov |
| Description: Vermont Huts Association and the Moosalamoo Association are proposing the construction and operation of a hut at Silver Lake. The proposed hut would be open to the public for year-round recreation.
Web Link: http://www.fs.usda.gov/project/?project=61910 |
|||||
| Location: UNIT - Middlebury Ranger District. STATE - Vermont. COUNTY - Addison. LEGAL - Not Applicable. Town of Leicester. | |||||
|
Silver Lake Recreation Site Improvements CE *UPDATED* |
- Recreation management |
Developing Proposal Est. Scoping Start 07/2022 |
Expected:08/2022 | 08/2022 |
Philip MacAskill 802-767-4261 x5530 philip.macaskill@usda.gov |
| Description: The project would implement a variety of improvements at the Silver Lake Campground and day-use area.
Web Link: http://www.fs.usda.gov/project/?project=61103 |
|||||
| Location: UNIT - Middlebury Ranger District. STATE - Vermont. COUNTY - Addison. LEGAL - Not Applicable. Town of Leicester. | |||||
|
Summer Skid Road Permits CE *NEW LISTING* |
- Special use management | Completed | Actual: 06/24/2022 | 08/2022 |
Jennifer Edmonds 802-353-8186 jennifer.edmonds@usda.gov |
| Description: Authorization of two permits for construction and use of skid roads to accomplish logging on private lands under Vermont%u2019s land use program.
Web Link: http://www.fs.usda.gov/project/?project=62414 |
|||||
| Location: UNIT - Middlebury Ranger District. STATE - Vermont. COUNTY - Addison. LEGAL - Not Applicable. Towns of Goshen and Bristol. | |||||
|
Walters Right of Way Permit Authorization CE *UPDATED* |
- Special use management |
Developing Proposal Est. Scoping Start 07/2022 |
Expected:08/2022 | 08/2022 |
Jennifer Edmonds 802-747-6746 jennifer.edmonds@usda.gov |
| Description: A Special Use Permit would be issued with a term of twenty years for a road Right of Way for the existing snowmobile trail (Blue Ridge Mountain Trail, #136) that is 1,712 feet long and up to 16 feet wide.
Web Link: http://www.fs.usda.gov/project/?project=59806 |
|||||
| Location: UNIT - Middlebury Ranger District. STATE - Vermont. COUNTY - Rutland. LEGAL - Not Applicable. Town of Chittenden. | |||||
|
Widow%u2019s Clearing Trail Realignment CE *NEW LISTING* |
- Recreation management | Cancelled | N/A | N/A |
Philip MacAskill 802-767-4261 x5530 philip.macaskill@usda.gov |
| Description: The proposed action includes the decommissioning of 0.6 miles of multi-use nonmotorized trail and construction of 0.5 miles of multi-use nonmotorized trail. The newly constructed trail would be designated as a Class 3 cross-country ski trail.
Web Link: http://www.fs.usda.gov/project/?project=62437 |
|||||
| Location: UNIT - Middlebury Ranger District. STATE - Vermont. COUNTY - Addison. LEGAL - Not Applicable. Town of Ripton. | |||||
|
Widow's Clearing Trail Realignment CE *UPDATED* |
- Recreation management |
Developing Proposal Est. Scoping Start 07/2022 |
Expected:08/2022 | 11/2022 |
Philip MacAskill 802-767-4261 x5530 philip.macaskill@usda.gov |
| Description: The project would realign the Widow's Clearing Trail by Constructing .5 miles of multi-use nonmotorized trail, and decommissioning .6 miles of trail. The proposed new trail would be managed for bicycles, horses, xc skiing, and hiking.
Web Link: http://www.fs.usda.gov/project/?project=61911 |
|||||
| Location: UNIT - Middlebury Ranger District. STATE - Vermont. COUNTY - Addison. LEGAL - Not Applicable. Town of Ripton. | |||||
| Back To Top | |||||
Green Mountain And Finger Lakes National Forests, Rochester Ranger District (excluding Projects occurring in more than one District) |
R9 - Eastern Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
Appalachian Trail Side & Corridor Crossing Trail Designations CE *UPDATED* |
- Recreation management |
In Progress: Scoping Start 06/07/2021 |
Expected:09/2022 |
09/2022 |
Shawn Langston 802-747-6743 Shawn.Langston@usda.gov |
| Description: The project would add three existing trail segments to the National Forest System in the Town of Norwich, Vermont (Dothan Brook, Joshua, and Griggs Mountain Trails).
Web Link: http://www.fs.usda.gov/project/?project=59805 |
|||||
| Location: UNIT - Rochester Ranger District. STATE - Vermont. COUNTY - Windsor. LEGAL - Not Applicable. Town of Norwich. | |||||
|
Bear Brook Winter Parking Reconstruction CE *UPDATED* |
- Recreation management |
Developing Proposal Est. Scoping Start 07/2022 |
Expected:08/2022 | 09/2023 |
Philip MacAskill 802-767-4261 x5530 philip.macaskill@usda.gov |
| Description: The former Bear Brook Picnic Ground parking lot would be renovated to provide up to 50 parking spaces for users of the Brandon Gap Backcountry Zones. The project would mostly utilize the existing footprint of the previous parking area.
Web Link: http://www.fs.usda.gov/project/?project=61093 |
|||||
| Location: UNIT - Rochester Ranger District. STATE - Vermont. COUNTY - Windsor. LEGAL - Not Applicable. Town of Rochester. | |||||
|
Lincoln Gap Parking Lot Renovation CE *UPDATED* |
- Recreation management |
Developing Proposal Est. Scoping Start 07/2022 |
Expected:08/2022 | 10/2022 |
Philip MacAskill 802-767-4261 x5530 philip.macaskill@usda.gov |
| Description: The project would renovate the upper and lower parking areas at Lincoln Gap to provide safe parking for up to 50 vehicles.
Web Link: http://www.fs.usda.gov/project/?project=61100 |
|||||
| Location: UNIT - Rochester Ranger District. STATE - Vermont. COUNTY - Addison. LEGAL - Not Applicable. Town of Lincoln. | |||||
|
Sugarbush Heaven's Gate Lift Replacement CE *UPDATED* |
- Recreation management - Special use management - Facility management |
In Progress: Scoping Start 04/15/2022 |
Expected:07/2022 |
08/2023 |
Jeffrey Hammell 802-222-1828 jeffrey.hammell@usda.gov |
| Description: The project would replace the slow 34-year-old fixed grip triple chairlift with a with a new, lower-profile, dependable fixed grip quad chairlift, giving better access to upper terrain of Lincoln Peak.
Web Link: http://www.fs.usda.gov/project/?project=61914 |
|||||
| Location: UNIT - Rochester Ranger District. STATE - Vermont. COUNTY - Washington. LEGAL - Not Applicable. Town of Warren. | |||||
|
Sugarbush Reverse Traverse Realignment and Snowmaking CE *UPDATED* |
- Recreation management - Special use management |
In Progress: Scoping Start 04/15/2022 |
Expected:07/2022 |
08/2022 |
Jeffrey Hammell 802-222-1828 jeffrey.hammell@usda.gov |
| Description: The project would realign the current trail to a more downhill and skier friendly traverse connecting the top of Valley House chairlift to the bottom of Heaven's Gate chairlift.
Web Link: http://www.fs.usda.gov/project/?project=61916 |
|||||
| Location: UNIT - Rochester Ranger District. STATE - Vermont. COUNTY - Washington. LEGAL - Not Applicable. Town of Warren. | |||||
|
Texas Falls Observation Site Renovation CE *UPDATED* |
- Recreation management |
Developing Proposal Est. Scoping Start 07/2022 |
Expected:08/2022 | 08/2022 |
Philip MacAskill 802-767-4261 x5530 philip.macaskill@usda.gov |
| Description: This project would improve the public infrastructure and accessibility at the Texas Falls recreation area, remove features that may pose a public health and safety risk, and reduce deferred maintenance.
Web Link: http://www.fs.usda.gov/project/?project=61104 |
|||||
| Location: UNIT - Rochester Ranger District. STATE - Vermont. COUNTY - Addison. LEGAL - Not Applicable. Town of Hancock. | |||||
|
In accordance with Federal civil rights law and U.S. Department of Agriculture (USDA) civil rights regulations and policies, the USDA, its Agencies, offices, and employees, and institutions participating in or administering USDA programs are prohibited from discriminating based on race, color, national origin, religion, sex, gender identity (including gender expression), sexual orientation, disability, age, marital status, family/parental status, income derived from a public assistance program, political beliefs, or reprisal or retaliation for prior civil rights activity, in any program or activity conducted or funded by USDA (not all bases apply to all programs). Remedies and complaint filing deadlines vary by program or incident.
Persons with disabilities who require alternative means of communication for program information (e.g., Braille, large print, audiotape, American Sign Language, etc.) should contact the responsible Agency or USDA’s TARGET Center at (202) 720-2600 (voice and TTY) or contact USDA through the Federal Relay Service at (800) 877-8339. Additionally, program information may be made available in languages other than English. To file a program discrimination complaint, complete the USDA Program Discrimination Complaint Form, AD-3027, found online at http://www.ascr.usda.gov/complaint_filing_cust.html and at any USDA office or write a letter addressed to USDA and provide in the letter all of the information requested in the form. To request a copy of the complaint form, call (866) 632-9992. Submit your completed form or letter to USDA by: (1) mail: U.S. Department of Agriculture Office of the Assistant Secretary for Civil Rights 1400 Independence Avenue, SW Washington, D.C. 20250-9410; (2) fax: (202) 690-7442; or (3) email: program.intake@usda.gov. USDA is an equal opportunity provider, employer, and lender. |
|||||