Skip to main content

Apex Lode Plan of Operations

Apex Lode, Strong Mines has submitted a Plan of Operations to maintain a mine and infrastructure on their claims. Infrastructure consists of a cabin/tool shed, 1,600 feet of road with a gate as well as the mine. The Plan of Operations is for 1 year.

Project Summary

Last Updated: 3/25/2014