Skip to main content

Jackass Creek AOP Restoration

Culvert removal and stream channel restoration in the crossing. Old culvert would be replaced by a bridge or bottomless-arch culvert. APE is approximately 0.25 to 0.35 acres. All disturbance would be confined to existing roadway.

Project Summary

Last Updated: 12/17/2024