Jackass Creek AOP Restoration
Culvert removal and stream channel restoration in the crossing. Old culvert would be replaced by a bridge or bottomless-arch culvert. APE is approximately 0.25 to 0.35 acres. All disturbance would be confined to existing roadway.
Project Summary
Location Summary:
FS Road 21S01 at Jackass Creek. FS 21S01 is a maintenance level 2 road that provides access to Jackass Meadow, but dead ends approximately 3 miles from the junction of Sherman Pass Road (22S05).
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 11/08/2024 |
Decision | 12/2024 (Estimated) |
Implementation | 01/2025 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (18), 36 Cfr 220.6(E)(18)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Kern River Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Wildlife, Fish, Rare Plants; Watershed Management
Project Activity:
Species Habitat Improvements; Species Population Enhancements; Watershed Improvements
Current Status:
Completed
Project Decision Information
Jackass Creek AOP Restoration
Decision Signed Date: 12/16/2024
Forests:
Sequoia National Forest
Districts:
Kern River Ranger District
States:
California
Counties:
Tulare
Legal Land Description:
Not Applicable
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Keith Stone
4875 Ponderosa Drive
Lake Isabella, CA 93240
559-877-2218
keith.stone@usda.gov
Last Updated: 12/17/2024