FishXing Multimedia

Imagery

 


 

An ugly culvert

Erosion of a plunge pool at the outlet can create a jump that was part of neither the design nor construction of the crossing. Monitoring of crossing performance is essential to discover such changes, especially after initial construction and large peak flows.

See: The Good and The Bad