Lee Creek Campground - Existing Powerline Replacement
The existing electrical line to the campground pumphouse and the host area is deteriorating and needs to be replaced. The replacement line will connect to the main electrical line located across Highway 12 at the entrance to Lee Creek Campground.
Project Summary
Location Summary:
USGS Quad Name: Lolo Hot Springs Quad Number 138
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 04/16/2012 |
Comment Period | 04/16/2012 |
Decision | 05/2012 (Estimated) |
Implementation | 05/2012 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (2), 36 Cfr 220.6(E)(2)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Lolo National Forest All Units
Notice and Comment Regulation:
215
Project Purpose:
Facility Management; Special Use Management
Project Activity:
Facility Improvements/Construction; Special Use Authorizations
Current Status:
Completed
Project Decision Information
Missoula Electric Co-op, Amendment to special Use Permit
Decision Signed Date: 05/17/2012
Legal Notice Date: 05/18/2012
Forests:
Lolo National Forest
Districts:
Missoula Ranger District
States:
Montana
Counties:
Missoula
Legal Land Description:
T11N, R23W, SE 1/4 Section 18
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Patrick Corts
Fort Missoula Bldg. 24
Missoula, MT 59804
406-329-3860
pcorts@fs.fed.us
Last Updated: 5/22/2012