Skip to main content

Clearwater Loop Rd 4370 Avalanche Culvert Replacement & Morrell Creek Bridge Replacement

Replace bridge on Morrell Creek, relocate 500 feet of roadway at the bridge approaches to place the bridge at a more stable location on the stream. Replace and relocate culvert on Clearwater Loop Road 4370, 75 feet upstream of existing structure.

Project Summary

Last Updated: 10/2/2014