Missoula Electric Cooperative Quartz Campground Overhead Line Burial
Missoula Electric Cooperative proposed special use permit to bury existing overhead power lines in Quartz Campground to reduce power outages, reduce fire hazard, reduce disturbance in powerline right of way, and improve aesthetics.
Project Summary
Location Summary:
Quartz Campground Tarkio West
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 06/01/2023 |
Decision | 08/2023 (Estimated) |
Implementation | 09/2023 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (3), 36 Cfr 220.6(E)(3)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Superior Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations
Current Status:
Completed
Project Decision Information
Missoula Electric Cooperative Quartz Campground Overhead Line Burial
Decision Signed Date: 08/22/2023
Forests:
Lolo National Forest
Districts:
Superior Ranger District
States:
Montana
Counties:
Mineral
Legal Land Description:
T15N, R25W, Section 9
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Abigail Lane
P.O. Box 460
Superior, MT 59872
406-361-1186
abigail.lane@usda.gov
Last Updated: 8/23/2023