Skip to main content

Kebler Pit Reopening

Gunnison Ranger District is proposing to reopen and possibly expand the Kebler Pit to provide rock and aggregate materials for projects. The pit is located outside the Thompson Divide Withdrawal Area. The project includes 4.9 acres of max disturbance

Project Summary

Last Updated: 12/17/2025