Skip to main content

Tonello Spring Development

Proposal to dig a 2-foot diameter hole at spring approximately 3 feet deep and fill it with gravel. A1-foot length of 4-inch perforated PVC pipe would be buried in the gravel and a garden hose connected to the pipe to take water to private land.

Project Summary

Last Updated: 10/14/2015