Skip to main content

Tri-State Montrose-Nucla-Cahone Transmission Line Geotechnical testing

Twenty-one core holes would be drilled on the Ouray and Norwood Ranger Districts along existing transmission line. Holes would be drilled from rubber-tired rig and would be 20 to 30 feet deep and six inches in diameter.

Project Summary

Last Updated: 9/12/2016