The Mt. Hatten Project
Mt Hatten Project is a radio repeater installation project, the system operates in the VHF band, power output is rated at 8 watts and is supplied by two solar panels and storage batteries. Ground disturbance will be the placement of 4 concrete pads.
Project Summary
Location Summary:
6th Principal Meridian, Colorado T.12S., R.92W., sec 4 NW1/4NW1/4 Chalk Mountain Quad, Grand Mesa National Forest
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 06/15/2020 |
Decision | 10/2021 (Estimated) |
Implementation | 10/2021 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (3), 36 Cfr 220.6(E)(3)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Grand Mesa Uncompahgre and Gunnison National Forest All Units
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations
Current Status:
Cancelled
Forests:
Grand Mesa, Uncompahgre and Gunnison National Forests
Districts:
Grand Valley Ranger District
States:
Colorado
Counties:
Delta
Legal Land Description:
6th Principal Meridian, Colorado T.12S., R.92W., sec 4 NW1/4NW1/4 Chalk Mountain Quad, Grand Mesa National Forest
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Albert Borkowski
2250 South Main Street
Delta, CO 81416
970-527-4131
albert.borkowski@usda.gov
Last Updated: 5/10/2024