Skip to main content

Flowing Park Connector

The proposed project includes construction of new 1.23 mile non-motorized single track on the Grand Mesa national Forest. This trail will connect the Flowing Park trail with the Drop Off trail, creating a loop ride for mountain bikes.

Project Summary

Last Updated: 8/12/2022