Skip to main content

Leon Lake Tunnel Access

Excavation work necessary to re-establish access into the Leon Lake tunnel. Excavation will be approximately 20' deep x 30' wide x 50'long. Access is needed to inspect existing outlet pipe and valves located within the tunnel.

Project Summary

Last Updated: 7/29/2021