Skip to main content

Tri-State Sunshine Fiber Optic Cable Authorization

GMUG plans to authorize Tri-State to operate 1.1 miles of existing fiber optic cable line installed on Tri-State's Nucla-Sunshine 115kV Transmission Poles for 30 years.

Project Summary

Last Updated: 5/5/2022