Skip to main content

Telluride Mill Creek Waterline Amendment

The Town of Telluride has an authorization for water infrastructure (NOR517). The Town is requesting an amendment to the permit to add approximately 870 feet of pre-existing ten inch steel pipeline for drinking water.

Project Summary

Last Updated: 5/19/2022