SMPA Red Mountain Pass (Burro Bridge to Ouray North) 44kV Transmission Line Rebuild Amendment

SMPA has proposed 0.7 mile overhead construction of existing overhead powerline instead of buried, use of two construction yards including an 0.29 acre expansion of one existing and the reduction of one tower structure near avalanche area.

Project Summary

Last Updated: 6/18/2024