Navopache Electric Company Greens Peak Line Burial
Navopache Electric Cooperative (NEC) would like to install a new underground conduit to replace the existing aging overhead electrical line. The underground conduit will be within the existing overhead infrastructure easement previously granted.
Project Summary
Location Summary:
Latitude 34�6'38.48"N, Longitude 109�34'26.57"W. Then continue approx. 0.64 miles northerly to Latitude 34�7'9.98"N, Longitude 109�34'19.33"W.
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 09/29/2023 |
Decision | 10/2024 (Estimated) |
Implementation | 11/2024 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (2), 36 Cfr 220.6(E)(2)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Springerville Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Electric Transmission; Special Use Authorizations
Current Status:
Cancelled
Forests:
Apache-Sitgreaves National Forests
Districts:
Springerville Ranger District
States:
Arizona
Counties:
Apache
Legal Land Description:
NE 1/4 of Section 11, T8N, R26E
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Michelle Steele
P.O. Box 760
Springerville, AZ 85938
936-333-6291
Michelle.Steele@usda.gov
Last Updated: 4/25/2025