Navopache Electric Cooperative Bore Holes for Wagon Wheel to Pinetop Lakes Reroute
Geotechnical investigation for placement of power pole foundations in relation to Navopache Electric's proposed electric line reroute and power pole replacement with increased size and capacity running from the Wagon Wheel substation to Pinetop lake.
Project Summary
Location Summary:
Lakeside Arizona off Penrod Road: T9N; R22E; S11,14,13/ T9N; R23E, S18,19,30,32,33/ T8N; R23E; S3
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 03/13/2024 |
Decision | 10/2025 (Estimated) |
Implementation | 11/2025 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (8), 36 Cfr 220.6(E)(8)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Lakeside Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management; Facility Management; Research
Project Activity:
Electric Transmission; Facility Improvements/Construction; Special Use Authorizations; Research And Development
Current Status:
In Progress
Forests:
Apache-Sitgreaves National Forests
Districts:
Lakeside Ranger District
States:
Arizona
Counties:
Navajo
Legal Land Description:
Not Applicable
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Eric Campbell
2022 W White Mtn. Bl
Lakeside, AZ 85929
928-331-6371
eric.campbell@usda.gov
Last Updated: 3/28/2025