APS 69kV Line Special Use Authorization Renewal and Infrastructure Upgrade
APS has requested to upgrade infrastructure for two 69kV lines on the Lakeside District and increase the existing easement used for maintenance from 40-ft wide to 60-ft wide. The 69kV line special use permit is also proposed to be reissued.
Project Summary
Location Summary:
Various locations near the communities of Show Low and Pinetop-Lakeside
Project Milestones:
| Milestone | Date |
|---|---|
| Scoping Start | 11/2025 (Estimated) |
| Decision | 05/2026 (Estimated) |
| Implementation | 06/2026 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (2), 36 Cfr 220.6(E)(2)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Lakeside Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management; Facility Management
Project Activity:
Special Use Authorizations; Facility Maintenance
Current Status:
Developing Proposal
Forests:
Apache-Sitgreaves National Forests
Districts:
Lakeside Ranger District
States:
Arizona
Counties:
Navajo
Legal Land Description:
See Map in Pinyon Public folder
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public