Skip to main content

APS 69kV Line Special Use Authorization Renewal and Infrastructure Upgrade

APS has requested to upgrade infrastructure for two 69kV lines on the Lakeside District and increase the existing easement used for maintenance from 40-ft wide to 60-ft wide. The 69kV line special use permit is also proposed to be reissued.

Project Summary

Last Updated: 9/23/2025