Navopache Electric Cooperative Trunk Line Addition
NEC has proposed to amend existing permit, adding new trunk line extending from transfer station on FR488H to Buckskin Road in Heber, AZ. New line would occupy less than 1/4 mile total distance crossing forest, parallel to FR488H in a 20' corridor.
Project Summary
Location Summary:
Extending from the NEC transfer station in Oilwell south to Heber, AZ.
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 01/2018 (Estimated) |
Decision | 04/2018 (Estimated) |
Implementation | 04/2018 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (2), 36 Cfr 220.6(E)(2); 32.2 (3), 36 Cfr 220.6(E)(3)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Black Mesa Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations
Current Status:
Cancelled
Forests:
Apache-Sitgreaves National Forests
Districts:
Black Mesa Ranger District
States:
Arizona
Counties:
Navajo
Legal Land Description:
Sections 17 & 18 of T12N, R17E - Gila and Salt River Meridians
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Deborah Roznovak
P.O. Box 968
Overgaad, AZ 85933
928-535-7300
dlroznovak@fs.fed.us
Last Updated: 3/12/2020