NEC Line Reconstruction
Within the project area, the Lakeside Ranger District proposes to authorize the installation of new riser poles carrying upgraded circuits to provide power to several areas.
Project Summary
Location Summary:
The project area is located adjacent to the Camp Grace / Camp Tatiyee area, west of SR260 / White Mountain Boulevard and south of Wagon Wheel Road.
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 04/22/2018 |
Decision | 06/2018 (Estimated) |
Implementation | 06/2018 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (2), 36 Cfr 220.6(E)(2)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Lakeside Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Electric Transmission
Current Status:
Completed
Project Decision Information
NEC Line Reconstruction
Decision Signed Date: 06/01/2018
Forests:
Apache-Sitgreaves National Forests
Districts:
Lakeside Ranger District
States:
Arizona
Counties:
Navajo
Legal Land Description:
Township 9N, Range 22E, Gila & Salt River Meridian.
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Orry Hatcher
2022 W White Mtn. Bl
Lakeside, AZ 85929
928-368-2108
ohatcher@fs.fed.us
Last Updated: 6/7/2018