Skip to main content

Apache Unit 71 Triple Well

Proposal to drill 3 wells from one well location pad, 435 feet by 350 feet in size. The proposal also includes construction of 370-foot long road and 1048-foot long gas pipeline.

Project Summary

Last Updated: 6/25/2015