Installation and Maintenance of a Micrometeorological Station CE
New permit to UNM researcher to take over an existing weather station operated by USGS and replace some of the equipment for the purpose of monitoring meteorological conditions including snow depth for hydrological and groundwater recharge.
Project Summary
Location Summary:
The existing micrometeorological station that will be acquired and modified is located near the 10K South trailhead, outside of designated Wilderness.
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 10/12/2020 |
Decision | 12/2020 (Estimated) |
Implementation | 01/2021 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (3), 36 Cfr 220.6(E)(3)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Sandia Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Research; Special Use Management
Project Activity:
Special Use Authorizations; Research And Development
Current Status:
Completed
Project Decision Information
Installation and Maintenance of a Micrometeorological Station CE
Decision Signed Date: 12/01/2020
Forests:
Cibola National Forest
Districts:
Sandia Ranger District
States:
New Mexico
Counties:
Bernalillo
Legal Land Description:
T11N, R5E, Sec 5
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Elke Schuster
11776 Hwy 337
Tijeras, NM 87059
505-281-3304 Ext. 110
elke.schuster@usda.gov
Last Updated: 3/30/2021