SunZia Southwest Transmission Project

Project is composed of two planned 500kV transmission lines across 520mi in NM and AZ. The selected alternative does not cross through NFS lands and the Cibola NFNG will not be issuing a ROD. The BLM signed the ROD on May 16, 2023.

Project Summary

Last Updated: 6/30/2023