Skip to main content

Sandia Peak Tram Upper Terminal Anchor Installation

The Sandia Peak Tram is proposing to install 2 anchor points (north and south) located in line with the Tram Super Structure. The installation is needed to slip each track rope pair as a unit and is required maintenance set forth by ANSI.IB77.1.

Project Summary

Last Updated: 7/20/2023